New Process Qualification

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

Internal Control–Integrated Framework
Software Quality Assurance Plan
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Overview of Key Rule Features
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Auditing A Risk-Based Approach To Conducting A Quality Audit
Software Configuration Management
EQUIPMENT QUALIFICATION/VALIDATION
Corrosion and Condition Assessment of Galvanized Steel Reinforcement in Concrete Structures Dr. Jane Jieying Zhang Critical Concrete Infrastructure October.
Software Project Management
Introduction to ISO New and modified requirements.
 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 7 Quality and Innovation in Product and Process Design.
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
© 2012 IBM Corporation Rational Insight | Back to Basis Series Documents and Record Control Liu Xue Ning.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
WHAT IS SYSTEM SAFETY? The field of safety analysis in which systems are evaluated using a number of different techniques to improve safety. There are.
©2010 Prentice Hall Business Publishing, Auditing 13/e, Arens/Elder/Beasley Internal and Governmental Financial Auditing and Operational Auditing.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
1 DISTRIBUTION A. Approved for Public Release; Distribution Unlimited. 88ABW , 23 May Integrity  Service  Excellence ADT 101: Introduction.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
Over View of CENELC Standards for Signalling Applications
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004.
PROVENEFFECTIVESTRATEGY NACE MR0175/ISO AND MR 0103 MATERIALS REQUIREMENTS FOR SOUR SERVICES Prepared by Daniel Daraban November 2013.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Failure Modes, Effects and Criticality Analysis
ANLEC R&D COMMUNICATION PACK ( ). While mercury can be removed from Oxy-Fuel flue gas, further work is required to understand its form and removal.
Chapter 6 Internal Control in a Financial Statement Audit McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
External Provider Control
Principal Investigator ESTCP Selection Meeting
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Project Quality Management
PRA: Validation versus Participation in Risk Analysis PRA as a Risk Informed Decision Making Tool Richard T. Banke– SAIC
Use Cases Discuss the what and how of use cases: Basics Benefits
School of Business Administration
Impact of Impurities on Formation of CO2 Hydrates
Software Configuration Management
Principal Investigator ESTCP Selection Meeting
Auditor Training Module 1 – Audit Concepts and Definitions
Project Management Lifecycle Phases
TechStambha PMP Certification Training
Simulation Of Gas Sweetening Process
Uncontrolled variation is the enemy of quality
Recall The Team Skills Analyzing the Problem
FMEA PROCESS FLOW Causes/ failure mechanisms Product definition
Failure Modes and Effects Analysis (FMEA)
Session 5b Dr. Dan C. Surber, ESEP
(Additional materials)
Flooding Walkdown Guidance
Pre-Execution Process Review Presentation
NHA Conference Long Beach, California
Internal Control–Integrated Framework
GE 6757 TOTAL QUALITY MANAGEMENT
Rational Unified Process
IS4550 Security Policies and Implementation
CLINICAL INFORMATION SYSTEM
METHOD VALIDATION: AN ESSENTIAL COMPONENT OF THE MEASUREMENT PROCESS
Moving Toward Trustworthy Aerospace Vehicle (AV) Systems
Conformity of Production (COP)
Failure Mode and Effect Analysis
Principal Investigator ESTCP Selection Meeting
Engineering Processes
Preliminary Hazard Analysis of Bunker
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Principal Investigator ESTCP Selection Meeting
Computer System Validation
Presentation transcript:

New Process Qualification Use of Electrolyte and Corrosion Models Narasi Sridhar October 2007

What is Technology Qualification DNV’s definition of Technology Qualification: “The process of providing the evidence that the technology will function reliably within specific limits” 17 January 2019

Why Technology Qualification? Manufacturer/Designer of New Technology: Assurance of feasibility and fitness for purpose Integrator of System: Assessment of system reliability End-user: Selection of technology, ROI evaluation Regulator: Confirmation of safety assessments 17 January 2019

QUALIFICATION OF NEW TECHNOLOGY DNV-RP-A203 Qualification Procedures for New Technology Describes a recommended work process for qualifying technology A public document which can be applied by anyone A revised version in draft form – apply to process qualification DNV-OSS-401Technology Qualification Management A description of DNV’s own services directed towards the work process in DNV-RP-A203 Internal objective: To unify the services within DNV worldwide External objective: To support agreement of scope-of-work 17 January 2019

What is New Technology? Technology Assessment according to DNV RP-A203 1: Proven technology 2 - 4: New Technology Technology Assessment according to DNV RP-A203 Cellulosic ethanol production Carbon capture Sulfuric Acid Plant 17 January 2019

Technology Qualification Management Project Execution Phase Define Qualification Basis Analysis and Testing Reliability Assessment Concept Improvement Selection of Qualification Methods Qualification Work Process Technology Assessment Probability of Success Evaluation (PoS) Failure Mode Identification and Risk Ranking Milestones DNV deliverables Use of simulation tools Technology Assessment Report Statement of Feasibility TA Technology Qualification Plan Statement of Endorsement TQP Certificate of Fitness for Service Technology Qualification Report TQ? Yes No NT Fall-back or hold 17 January 2019

Application of Models New processes do not have well established performance history Reliance on similar process experience “Generic” equipment experience Simulations can help Understand process chemistry, speciation, other stream parameters Identify materials performance issues through corrosion modeling Identify data needs Simulations need to be combined with field experience and laboratory data 17 January 2019

Example of Process qualification – CO2 Capture Post combustion CO2 capture technologies involve well-known processes – amine absorption approach New amines, proprietary activators, new design, etc. Corrosion occurs in pre-absorption units through condensation of water 17 January 2019

Issues Effect of CO2 and water concentration Effect of other gases (N2, O2, SOx, NOx etc.) Effect of chlorides, hydrochlorides Effect of flow and impingement Effect of activators 17 January 2019

Modeling Amine Absorption System Veevab and Aroonvilas, 2002 Limitations: Does not consider passivity, localized corrosion and does not consider Concentrated electrolytes and other components 17 January 2019

Corrosion of CO2 Absorber Column Corrosion observed opposite gas inlet point Suspected water condensation along with chlorides and amines No significant corrosion without water From T. Ramgopal et al., to be Published in CEST 17 January 2019

Effect of Water on Corrosion Corrosion of carbon steel in MDEA From, T. Ramgopal et al., CEST 17 January 2019

Effect of Chloride MEA hydrochloride increases active dissolution in the presence of water Simulation of the hygroscopic tendency of the amine hydrochloride Significant effect of hydrochloride compared to MDEA plus chloride (even with CO2) Data from present work 17 January 2019

Effect of Water Water affects active-passive transitions 17 January 2019

Summary DNV new technology qualification procedure is being used for process qualification Electrolyte simulation tools, such as OLI Analyzers are useful in understanding the chemistry of processes OLI Corrosion Analyzer may be used to simulate corrosion, thus extending the qualification capabilities Laboratory electrochemical data needed Populate the parameter database Verify simulation results 17 January 2019

17 January 2019