Development of a Process for Conducting review & Assessment of PSAR of a NPP Group I.

Slides:



Advertisements
Similar presentations
Reviews the documents as to compliance with the requirements and submits report Release approved LTO Start Assess the documents as to completeness and.
Advertisements

EGYPT NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION “General Information on the Status of the Egyptian Nuclear.
Licensing of Nuclear Power Plants in Pakistan
Employee Orientation and Training
Slide No. 1 IAEA Developed by NSNI Division, IAEA under the supervision of Mr. Marco Gasparini (PNRA supported in the development under TC-Project PAK/09/028)
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Manage Project Scope Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG502A.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
Manage Project Procurement Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG509A.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Unit Guide C ertificate IV in Project Management Qualification.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Preparing for the Launch Mohammed El- Affendi. Launch Major Tasks  The Launch is performed according to script “LAU1”, table 3.1 in the book (page 39),
IAEA International Atomic Energy Agency LICENSING OF RADIOACTIVE WASTE MANAGEMENT FACILITIES Luc Baekelandt Safety of radioactive.
IAEA International Atomic Energy Agency ESTABLISHING THE SAFETY INFRASTRUCTURE FOR A NUCLEAR POWER PROGRAMME IAEA WORKSHOP ON LEADERSHIP AND MANAGEMENT.
Presentation of CS on Embarking Countries M. Moracho, R. Revuelta Bureau of SC of Competence of HR for Regulatory Bodies Brussels, 27-28nMarch 2012.
BSBPMG505A Manage Project Quality Manage Project Quality Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG505A.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
IAEA - 4 th Steering Committee Meeting on Competence of Human Resources for RBs and SARCoN seminar EUROPEAN UNION COOPERATION TO STRENGTHEN REGULATORY.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
National Public Health Performance Standards Local Assessment Instrument Essential Service:6 Enforce Laws and Regulations that Protect Health and Ensure.
MANAGEMENT SYSTEM GHANA SC GROUPE 1 TUNISIA, MOROCCO, CANADA, SWITZERLAND, TURKEY, HUNGARY, EGYPT, ESTONIA LUXEMBOURG.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ROMANIA.
23 January 2016 Gustavo C ARUSO Head, Regulatory Activities Section Division of Nuclear Installations Safety Department of Nuclear Safety and Security.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Unit Guide C ertificate IV in Project Management Qualification.
Egyptian Nuclear and Radiological Regulatory Authority (ENRRA)
IRRS REFRESHER TRAINING Lecture 5
Software and Systems Integration
Manage Project Quality Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG505A.
Radioactive waste repositories
Status and Development of Regulatory Infrastructure in Iraq
Ensuring Nuclear Safety Culture in Ghana: Regulatory Perspective
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
Manage Project Costs Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG504A.
Flooding Walkdown Guidance
Development of NPP Safety Regulations in Pakistan” Application Set
HCS 341 TUTORS Perfect Education/ hcs341tutors.com.
Overview of RCF Activities
Armenia Training and Tutoring Feedback
Regulatory review and assessment
Job Analysis Chapter 5.
Communication and Consultation with Interested Parties by the RB
Establishment of a regulatory review and assessment process
Regulatory review and assessment
Regulatory Cooperation Forum (RCF) - Plenary 2018
BREAK OUT SESSION ON EQUIPMENT FOR EXPLOSIVE ENVIRONMENTS
USNRC IRRS TRAINING Lecture18
Canadian Auditing Standards (CAS)
Developing of Licensing Process for NPP
Legal and Regulatory Framework for Nuclear Installations in IRAN
Case study- 1 Developing Process of Safety Regulations
ESS Handbook for Radiation Protection
Overview of the recommendations on software updates
IRRS Mission 2011 to Switzerland: Resulting Improvements to Regulatory Processes P. Flury.
IAEA - Department of Nuclear Safety & Security
Presentation transcript:

Development of a Process for Conducting review & Assessment of PSAR of a NPP Group I

Participants Ghana Iran Jordan Kenya Morocco (3) Tunisia

(a) Main Tasks of R & A Process to Perform R & A of the Chapter Establishment of the Regulation (Mondatory) ( containing legal procedures and conditions for License) The Guide documents are (Not Mondatory) Alternative methods for submitting license to be Agreed with the RB

(b) Defining the Review & Assessment Process to be Performed 1. Receipt of Application for Authorization of a Facility 2. Check/initial Review for Documentations of Application 3. Planning & Scheduling of R & A 4. Performance of R & A / Regulatory Inspections to Complement R & A 5. Preparation of the Safety Evaluation Report

(c) Process Management in the RB Org & Assigning Responsibilities Process will be Managed in accordance with Integrated Management System where hierarchy of organization is observed; This includes: Departments/Divisions/Units, etc, based on Job Description

(d) Internal & External Communication TSO Consultants Experts CEO/DG Directorate Division Other institutions

(e) Expected Inputs & Outputs Inputs - PSAR, Regulations & Guidances Outputs - RB Report containing; Brief description of Installation & Facility Conclusion on Safety Analysis of each part of the facility in comparison with Acceptance Criteria Conclusion of Safety Margin