The Rossway Safeway Roof Safety Protection system is installed on top of roof purlins. The Rossway Safeway system consists of a platform deck with handrail.

Slides:



Advertisements
Similar presentations
Unit 10 - Stairway Construction
Advertisements

The following photo essay shows a 2011 Hyundai Equus Sedan being transformed from a running passenger car into a specialized platform used for photographing.
Health and Safety Executive Health and Safety Executive Dropped Objects Update September 2013 Donald Dobson Health & Safety Executive Offshore Division.
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
Health and Safety Executive Health and Safety Executive Dropped Objects Update November 2011 Donald Dobson Health & Safety Executive Offshore Division.
§ – Subpart L Oklahoma State University2.
1 Presentation 30: STARTING 3-TAB SHINGLES. 2 Underlayment Felt underlayment is installed on a roof deck before shingles are applied.
Subpart R Steel Erection
SRT251- Construction and Structures 2 Timber Portal Frame Glenn Murcutt Daniel McLean
FALL PROTECTION.
BETTER WRONG Fall Protection Susan Harwood Grant Training Program 2013 Wood Frame Construction.
1 BUILDING TRADE SAFETY FALL PROTECTION. 2 BUILDING TRADE SAFETY Should fall protection be used here?
Stairways and Ladders 1926 Subpart X - Stairways and Ladders
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
OSHA Susan Harwood Training - AGC Fall Protection Susan Harwood Grant Training Program 2013 Commercial Roof Fall Safety.
Safety Training Presentation No1 Protect yourselves and others from falls and falling objects V5-8 October 2012.
Walking-Working Surfaces: Preventing Falls.
View from the bridge wing in the drydock of open cargo holds forward.
Most Frequently Cited Serious Violations Construction – FY 2006.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
Office of Training & Education1 § SUBPART L SCAFFOLDS.
CFR SUBPART L SCAFFOLDS
NGfL CYMRU GCaD ACCESS EQUIPMENT.
STAIRS AND STAIR FRAMING
Health and Safety Training Standards in Design and Technology
Appendices Subpart R Steel Erection
Outcome 5 Safety requirements for using access equipment Unit 201: Health and safety in building services engineering.
11 Photos in this presentation are from the OSHA Region 4 National Photo Archive and OSHA Region 5. Is This a Fall Hazard?
By: Caleb VanderWal.  Mix cement  Dig hole at least 24” into the ground  Poor cement in ground with poles  Wait 2-3 days (if you don’t wait that long.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
ACADs (08-006) Covered Keywords Rigging, hoist, crane. Description Supporting Material b.
Most Frequently Cited Serious Violations Construction – FY 2009 OSHA Federal Standards October 1, 2008 – September 30, 2009.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
Most Frequently Cited Serious Violations Construction – FY 2007.
Fall Hazards Susan Harwood Training Grant Program (2006) Focus Four Hazards in the Construction Industry.
Office of Safety & Health Consultation Office of Safety & Health Consultation presents Focus Four Fall Protection in Construction Focus Four Fall Protection.
Falls From Height. Identifying fall hazards Falls are a major cause of workplace fatalities and serious injuries. There are many jobs that require people.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Building a Deck Continued
NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD E.T.& L. CORP.
Procedure for erection and use of mobile tower scaffolds (Revision 1 – 5 th April 2011) Toolbox talk.
1 Presentation 30: STARTING 3-TAB SHINGLES. 2 Underlayment Felt underlayment is installed on a roof deck before shingles are applied.
Health and Safety Executive Health and Safety Executive Dropped Objects Update February 2016 Donald Dobson Health & Safety Executive Offshore Division.
BPS3413 CONSTRUCTION SAFETY Lecture 6 : Working at Height.
C-shaped steel beam pulley cable pulley lifting and installation work status.
University of Houston Passage measurements and ½ inch width 79 and ½ inch height Elevator cabin measures 56 ½ x 79 ½ inches.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Most frequently cited OSHA standards during FY 2016 inspections
OSHA’s NEW Walking-Working Surfaces
Height Work Safety.
Walking and Working Surfaces
OSHA’s NEW Walking-Working Surfaces 1910
Temporary Works – P8 Project Practice.
29 CFR Subpart F Terminal Facilities
Steel Erection 29 CFR 1926, Subpart R
Mechanical analysis of Foam and plastic honeycomb panels
§ SUBPART L SCAFFOLDS 1.
Most Frequently Cited Serious Violations
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
Most Frequently Cited Serious Violations
Most frequently cited OSHA standards during FY 2018 inspections
§ SUBPART L SCAFFOLDS 1.
ACCESS EQUIPMENT.
Most Frequently Cited Serious Violations
Reader Swap out Guide.
Most Frequently Cited Serious Violations
Steel Erection 29 CFR 1926, Subpart R
Timber Frame Panel with opening Typical panel comprises a series
Presentation transcript:

The Rossway Safeway Roof Safety Protection system is installed on top of roof purlins. The Rossway Safeway system consists of a platform deck with handrail and toe board to one side, the leading edge and fall protection frames to the other working edge Roof Plan Roof section Rossway Safeway system

The first roof tier is placed with crane or other suitable lifting device. Access to de-sling and fix panel is gained from Rossway Safeway system Roof Plan Roof section

The Rossway SafeEdge roof perimeter edge protection system is fitted on the first composite panel installed. This provides perimeter fall protection for operatives working at roof level. Rossway SafeEdge Roof Plan Roof section

Rossway SafeEdge The Rossway Safeway system is moved on purlin trolleys the width of a roof panel Roof Plan Roof section

Rossway SafeEdge The next tier of roof panels are laid Roof Plan Roof section

Rossway SafeEdge Crane slings removed with access from Rossway Safeway system Roof Plan Roof section

Rossway SafeEdge The Rossway Safeway system is moved on purlin trolleys the width of a roof panel Roof Plan Roof section

The next tier of roof panels are laid Roof Plan Roof section

Rossway SafeEdge Crane slings removed with access from Rossway Safeway system Roof Plan Roof section

Rossway SafeEdge A pack of roof panels can be landed on the completed roof area. Edge protection is provided to all edges with the Rossway Safeway Roof Safety protection system to the leading edge and the Rossway SafeEdge to the perimeter Roof Plan Roof section

Rossway SafeEdge The Rossway Safeway system is moved on purlin trolleys the width of a roof panel Roof Plan Roof section

Rossway SafeEdge The next tier of roof panels are laid panels can be taken from the pack landed at roof level. Roof Plan Roof section

Rossway SafeEdge The Rossway Safeway system is moved on purlin trolleys the width of a roof panel Roof Plan Roof section

Rossway SafeEdge The next tier of roof panels are laid Roof Plan Roof section

Rossway SafeEdge The Rossway Safeway system is moved on purlin trolleys the width of a roof panel Roof Plan Roof section

Rossway SafeEdge The next tier of roof panels are laid Roof Plan Roof section

Rossway SafeEdge At the end of the roof the fall protection frames are removed by removing the fixing brackets on one side which enables the frames to rotate on the other side. The other side can then be released and the frame taken off with access from the platform deck. Roof Plan Roof section

Rossway SafeEdge With access from the completed roof…… Roof Plan Roof section

Rossway SafeEdge …..the platform deck and handrail can be moved on to the completed roof providing edge protection……. Roof Plan Roof section

Rossway SafeEdge …from the platform deck…… Roof Plan Roof section

Rossway SafeEdge …the final tier of roof panels are installed Roof Plan Roof section