Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows.

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

City of Hubbard Transportation System Plan Update April 25, 2012.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
TSPLOST Update River Valley Region TIA Citizen’s Panel April 24, 2014.
TIGER PROGRAM LESSONS LEARNED Great PA/NJ Regional Trail Projects Presentation to the Circuit Coalition May 15, 2014 Chris Stanford, P.E., PTOE, PMP Michael.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Traffic Analysis Toolbox & Highway Capacity Manual Transition
Fine Tuning Boulders transportation system Presented by: Marni Ratzel GO Boulder/ city of boulder making infrastructure work for biking and Walking.
Public Works: Building Sustainable Communities
City Managers Neighborhood Impact Initiative Impact Initiative Acre & Pawtucketville.
Walter Brooks Executive Director Regional Planning Commission November 2, 2012.
LAKE COUNTY TRANSPORATION CONNECTIVITY PROJECT Connecting people with communities and schools; working via safe roads and alternative transportation corridors.
North Lamar Boulevard Project Neighborhood Meeting February 12, 2013 Alan C. Hughes, P.E. Austin Transportation Department.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
HB 1048 / SB 518 Adjustments for Local Programs May 13, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
Titusville to Edgewater Bike Loop PD&E Study
State of Morrisville Mayor Mark Stohlman July 17, 2014.
How did the Bicyclist Cross the Road? By: Mike Hendrix, PE, PTOEDate: June 26, 2012 A Case Study of Two Intersections in Seattle.
Shared Road Markings “Sharrows” For Bicycles Max Starcke Park Connection to the Future TxDOT Hike and Bike Trail.
Presentation to the TRSD School Board April 17, 2014 Michael Hollow, Grade 5.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
IRTBA “STATE OF THE INDUSTRY” Will County FY 2012.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
Transportation in Northern Kentucky Rob Hans, P.E. Chief District Engineer, District Six SAME, Cincinnati Post - April 15,
NORTHEAST CORRIDOR INFRASTRUCTURE (NECI) BICYCLE FACILITIES STUDY Bicycle Advisory Committee (BAC) Update in collaboration with: + STV/Ralph Whitehead.
Contact: Beth Morris
Pedestrian and Bicycle Concerns About Highway Design and Operation Barb Mee, AICP City of Asheville Transportation Department
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Complete Streets Policy and Implementation Jason Ridgway February 11, 2014.
County Wide Active Transportation Study (CWATS) Master Plan Active Communities Summit – October 3, 2011.
University Bike Master Plan. University Policy  Bicycle committee recommends that the current policy for bicycles on sidewalks be changed to create a.
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
Texas Tech University Bikeway Plan August 12, 2005.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
School-based projects from a Transportation Act program.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
New Visions Bicycle & Pedestrian Action Plan Bicycle and Pedestrian Transportation – Bicycle and pedestrian travel is vital to the region’s public health,
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
San Juan Greenway WJI PRODUCTIONS Cycling and Walking Centennial Trails Project.
Bicycling in Montgomery County Where we are and where we’re going Montgomery Bicycle Advocates (MoBike) – 5/14/11.
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
Council Policy Forum Feb. 23, 2015 CAPITAL PLANNING & INFRASTRUCTURE.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
Urban Studies CGC1D. What’s Happening in this picture?
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
COMPLETE STREETS Local Model Policy June 10, 2015.
BLACKWATER HERITAGE STATE TRAIL By Vernon Compton November 13, 2015 Emerald Coast Transportation Symposium.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
ACHIEVING PHILADELPHIA’S VISION ZERO ACTION PLAN THROUGH INNOVATIVE STREET DESIGN Jackson Wandres, RLA – The RBA Group December 3, 2015.
1 Village of Altamont, NY Pedestrian and Bicycle Master Plan Draft Plan Presentation January 8, 2009.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
Maintenance and Temporary Traffic Control
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
 The Pedestrian Plan is:  Long Range and Comprehensive  Conceptual  A Vision for the Future  The Plan is not:  Regulatory or Binding  A Master.
Campus-to-Campus Public Workshop Evaluating the Routes April 15, 2010.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
RebuildIndy Indianapolis Department of Public Works March 2011.
Pedestrian and Bicycle Advisory Commission and Fort Worth Bike Sharing
BICYCLE AND PEDESTRIAN MASTER PLAN FINAL PRESENTATION
Transportation Projects
FY 2011 – FY 2015 Transportation Improvement Program (TIP)
Bond Advisory Committee
Responsibilities and FUNDING
City of Wilmington Bike Plan Update
Update on Kings Highway Corridor
Design Standards.
Presentation transcript:

Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows 89 miles of signed routes Wide outside lanes standard on thoroughfares NEW 2014 BIKE & HIKE MAP!!!! Town of Cary Pedestrian & Bicycle Infrastructure Updates 4 th Annual Triangle Pedestrian & Bicycle Workshop Todd B Delk, PE Facilities Planning Engineer The Cary Theater May 2, 2014

Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows 89 miles of signed routes Wide outside lanes standard on thoroughfares NEW 2014 BIKE&HIKE MAP!!!! Current Projects Greenways 43 projects in the works Additional 22.8 miles $4,400,000 improvements funded by Community Investment Bonds (CIB) White Oak Creek Phase V Old Reedy Creek Trailhead 2012 PRCR Master Plan – Priority Greenway Corridors

Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows 89 miles of signed routes Wide outside lanes standard on thoroughfares NEW 2014 BIKE&HIKE MAP!!!! Current Projects Greenways 43 projects in the works Additional 22.8 miles $4,400,000 improvements funded by Community Investment Bonds (CIB) White Oak Creek Phase V Old Reedy Creek Trailhead 2012 PRCR Master Plan – Priority Greenway Corridors Sidewalks 17 projects in the works $7,780,000 improvements funded by CIB Walnut Street Bridge W Chapel Hill Road Old Apex Road

Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows 89 miles of signed routes Wide outside lanes standard on thoroughfares NEW 2014 BIKE&HIKE MAP!!!! Current Projects Greenways 43 projects in the works Additional 22.8 miles $4,400,000 improvements funded by Community Investment Bonds (CIB) White Oak Creek Phase V Old Reedy Creek Trailhead 2012 PRCR Master Plan – Priority Greenway Corridors Sidewalks 17 projects in the works $7,780,000 improvements funded by CIB Walnut Street Bridge W Chapel Hill Road Old Apex Road Bike Facilities $1,000,000 improvements funded by CIB 28 additional miles of bike lanes and sharrows Improved detection at signals Bike lockers at Cary Depot Bike & Hike App