P08424 Residential Energy Savings

Slides:



Advertisements
Similar presentations
National Church Residences
Advertisements

Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council
CenterPoint Energy Sustainable Schools Program August 2013 – June 2014 School Year.
Energy Use and Energy Awareness at the CNS Building Lia Stelljes, Physics ‘08 Beth Ellen Clark Joseph, Physics CNS Sustainability Group Office of Facilities.
MSD1 Senior Design Project- Oxygen Gas Sensor P09051 Samuel Shin Jeremy Goodman Sponsor: RIT uE & EE department Project Guide: Professor Slack.
School of Computing, Dublin Institute of Technology.
Software Configuration Management (SCM)
P08009 Audible Memo Board Phase II Monday, October 22, 2007 P08009: Audible Memo Board Phase II Sponsor: Tala Hopkins Jon GosligaAudio Output Lead Loic.
Linking Objectives to Programs EPA Regions 9 & 10 and The Federal Network for Sustainability.
Project Management An Overview John Mulhall MIICM; LIB International Credit & Process Management Professional.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Measuring What Matters November 7 th Agenda Review and update of tasks and timeline Review and update of tasks and timeline Role of RTF Role of.
INTEGRATING EHS INTO NEW PRODUCT DEVELOPMENT
Project Planning for New Model Home Pre-construction Rey Ross GBA 573 July 10, 2003.
Rural Development’s Rural Energy for America Program (REAP) Grants and Loans Guarantees & Renewable Energy Feasibility Studies June 5, 2009.
Solar System Life Maintenance Call in number: Meeting number: * * August 3, 2009.
CPUC Residential Rate Rulemaking Workshop July 31, 2014 SDG&E TVP Marketing and Outreach Proposals.
Energy Reduction Initiative
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
CSE9020 Schedule, / 1 The Suggested Schedule Week Content/Deliverable 1. 4/3Unit Overview, Project Description, Meetings, Group Formation 2. 11/3Project.
Eco-Committee Assembly EDF Energy and Willand School. POD Activity and new campaign. Recycling Competition winners.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
California Energy Commission Presentation of Proposed Grouping of 2006 Energy Efficiency programs for Evaluation Planning Mike Messenger CEC Evaluation.
Energy Management in Buildings Tony Golding. IMPLEMENTATION OF ENERGY MANAGEMENT Appointment of an energy manager (engineer) Production of an energy management.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Rosa Mitsumasu Rebecca Wagner Jonathan Steffens Kevin Harvey.
AN INDIVIDUAL PROJECT FOCUSED ON A SMALL SCHOOL Integrating ICT Sustainability.
Software Life Cycle The software life cycle is the sequence of activities that occur during software development and maintenance.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Earth’s Changing Environment Lecture 19 Lighting Efficiency Problem.
Watt’s Up?! Solar Panel Activity  Goal: Have students calculate the percentage of energy provided by the solar panels to the school  Part I: Collect.
Lighting Efficiency. Lighting Efficiency Problem Suppose that 25 incandescent light bulbs rated at 100 Watt are replaced by 25 fluorescent lamps rated.
University of Southern California Center for Systems and Software Engineering ICSM Stage II: Phases and Continuing Project Example Anandi Hira CS 510,
P08424 Residential Energy Savings Robert Underhill: Project Manager Aaron Resetarits: Component Analysis/ Implementation Feasibility Bill Jamieson: Building.
26100 Integrating Business Perspectives Lecture 9.
Empowering Covenant of Mayors Coordinators and Supporters to assist municipalities in implementing and monitoring their Sustainable Energy Action Plan.
P08424 Residential Energy Savings Robert Underhill: Project Manager Aaron Resetarits: Component Analysis/ Implementation Feasibility Bill Jamieson: Building.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
POSITIVE ENERGY TOGETHER ® Pay As You Go - Draft Executive Product Development Meeting 3/29/2013.
THE VALUE (SUPPLY) CHAIN STRETCHES FROM THE BEGINNING OF YOUR SUPPLIER’S SUPPLY CHAIN THROUGH ALL OF YOUR PROCESSES THAT CREATE VALUE FOR YOUR CUSTOMERS.
IS Development Methodology
HCS Energy Master Plan Update
Gary Nower – Wilfrid Laurier University Edward Ng – EY
EnMS Management Review
P07307: Controls for Dynamic Suspension
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
Systems Analysis and Design in a Changing World, 4th Edition
Project life span.
ISA 201 Intermediate Information Systems Acquisition
INNOVATIVE FINANCIAL INSTRUMENTS TO SUPPORT ENERGY EFFICIENCY:
P07203 Dynamometry Laboratory Infrastructure
Smart Building Energy Data Collection
Description of Revision
CPMGT 300 Competitive Success/snaptutorial.com
Marketing co-op and non-coop
We create value for our clients and communities by providing innovative energy efficient solutions. By reducing energy use and utilizing renewable energy,
Project Review P07442: Thermoelectric Demonstration Test Bed
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
SOCIAL MEDIA STRATEGY.
INFORMATION SYSTEMS PLAN
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Project management concepts
Maintenance Opportunities
Household Energy Efficiency Mar 13 / Act D 71 Household Energy Efficiency LEARNING TARGET: I can identify the features that effect.
{Project Name} Organizational Chart, Roles and Responsibilities
P08424: Residential Energy Savings
P08424: Residential Energy Savings
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Presentation transcript:

P08424 Residential Energy Savings Sponsor – Facilities Management Services Robert Underhill: Project Manager Aaron Resetarits: Component Analysis/ Implementation Feasibility Bill Jamieson: Building System Analysis/ Component Analysis Swathi Paruchuri: Statistical Analysis/ Human Behavior Kris Laera: Statistical Analysis/ Engineering Economics Jeremy Barczak: Coding/ Data Acquisition

Key High level Customer Needs Project Description Reduce energy consumption on Residential side of The RIT campus Market - Students living in the dorms Key High level Customer Needs Save RIT money Reduce Energy consumption Increase student awareness Characterize and explain student energy usage Engineering Specs Payback < 3 years >$24,000/yr 5% Reduction with modifiable suggestions >15% reduction with competition Involve 3380 students in competition to reduce their energy Breakdown (%)of the typical student’s energy based on 3.3 kwh total

System Architecture Overview Reduce Energy Energy Audit Grass Root Campaign Website Competition Hallway Lighting Incandescent Conversion

Results from Audit

Website Architecture User Website Home External Links Dorm Groups Weekly/Monthly Individual Contribution Weekly/Monthly Suggestions for Reducing Energy

Website Design

Competition Check Baseline Energy consumption Get student organization support Advertise for Competition Initiate competition Website functioning 2 week competition Compare to baseline to determine winner Post-Competition Analysis Have Party for winners!

Hallway Timers Establish Kwh Baseline (2 weeks) FMS buys Hallway Timers Install Hallway Timer allowing lights on for 16hrs/day Monitor % Decrease (1 week) Compare to Original goal Assess performance

Incandescent Conversion Establish Kwh Baseline (2 weeks) Inform Students Count number Of incandescent bulbs Buy bulbs Get students to Install new Fluorescent bulbs Monitor % Decrease (1 week) Compare to Original goal Assess performance

Risks and Strategy for Mitigation

Current State of Design Audit (complete) and Suggestions meet all customer needs Website in development On target to meet $5000 budget Likely to spend ~$3000 Schedule: On time Significant confidence in Incandescent Trade in suggestion Moderate confidence in Hallway Timer Suggestion Moderate confidence in Grass-Roots Campaign Mitigations: Suggestion Feasibility Testing Competition Advertising Coordination with and Support from Engineers for a Sustainable World, SWE, ResLife, FMS

Product Development Process Phase Current Phase of Development

MSD II Project Schedule Milestones Week 1 Install meters, begin control readings Week 2 Complete 1 full week of control, Install hallway timers Week 3 1 week of timer testing, provide students with fluorescent bulbs Week 4 2 weeks of bulb replacement testing, inform RA's of competition Week 5 2 weeks of bulb replacement testing, inform students of competition Week 6 Initiate competition: run for two weeks, revise suggestions Week 7 Second week of competition, complete analysis of suggestion performance Week 8 Post-competition analysis, modify website as necessary Week 9 Post-competition analysis Week 10 Post-competition analysis, assemble test data into formal report Week 11 Provide FMS with detailed report of findings and proposed action