Electrical Maps of Final 3 Futures

Slides:



Advertisements
Similar presentations
Demand Response Commissioner Suedeen Kelly June 3, 2008.
Advertisements

The Midwest ISO from a Transmission Owner Perspective.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
1 Dale Osborn Midwest ISO March 17, 2008 Detroit, Michigan Great Lake Regional Wind Institute Introduction to the Midwest ISO.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Annual Energy Outlook 2010 Electric Power NPC Presentation October 14, 2010.
National Wind Generation Picture. Outline 1.US energy today 2.Legislative landscape 3.The future 4.Long-term national planning 5.Conclusions.
August 17, 2006 ICF Consulting RGGI Preliminary Electricity Sector Modeling Results Phase III RGGI Reference and Package Scenario.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
0 Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT Aruna Ranaweera, Ph.D., P.E. OCI Solar Power October 15, 2012.
2013 Overview. Graybar Financial Services (GFS) Mission Statement: As an alternative means of acquiring our products, GFS offers financing to qualified.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
USDA Outlook Forum Feeder Cattle Supplies for the South Plains and Implications February 24, 2012 By Don Close Market Director Texas Cattle Feeders Association.
Gas-Electric System Interface Study OPSI Annual Meeting October 8, 2013 Raleigh, North Carolina.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
SPP.org 1. Southeastern Inter-Regional Planning Update (SIRPP) Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana.
Transmission Options for Mariah Project, Phase II 3/10/2010.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
State Performance-based Incentives and Rebates for Small Wind * / March 2011 Rebates/PBIs available in 18 states and DC for small wind.
Integrating wind resources: siting decisions in the Midwest Julian Lamy (speaker) Ines Azevedo Paulina Jaramillo.
Energy Business Solutions Michigan IRP Working Group Meeting July 25, 2005.
Conference on Standard Market Design Issues Alice Fernandez, FERC Staff January 22-23, 2002.
Greg Brinkman Debbie Lew National Renewable Energy Laboratory Golden, Colorado USA Western Wind and Solar Integration Study: February TRC meeting – Transmission.
Consumer Cost Effectiveness of Carbon Mitigation Policies in Restructured Electricity Market Jared Moore and Jay Apt (adviser) CMU Engineering and Public.
Energy Markets at the Crossroads Illinois State University Institute for Regulatory Policy Studies 12 December 2002 Springfield, Illinois Vito Stagliano.
ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.
Department of Energy’s Energy and Employment Report Breakdown of Industrial Sub-Sector Employment, Job Growth Trends, Geographic Spread and More April.
1 Transfer Limit Hardening (TLH) Methodology Need to translate the NEEM soft constraint results to fixed transfer limits for futures 2, 3, 5, 6, 7 and.
Future 2 Soft Constraints Transfer Limit Hardening By the NEEM-TX Subteam SSC Meeting June 6, 2011.
Electrical Maps of Final 3 Futures Stanton W. Hadley 11/9/11.
Collier County Tourism Research
EI-WECC Seams Study Needed
Beth Soholt Director Wisconsin Public Utility Institute Wind Energy – Prospects for Growth in Wisconsin Madison, WI February 27, 2008 Wind Power Expansion:
Seams OPSI Annual Meeting October 7, 2013 Joe Bowring.
Enron Generation Overview
House Price
RPS Policies with Solar/DG Provisions
CIE 274 Civil and Environmental Systems
Global energy-related CO2 emissions
North American Markets Status
House price index for AK
Avaya Consultant Relations Program
20 November 2018 Characteristics of Successful Wind Energy Markets: A Developer’s Perspective on Lessons for New England TJ Deora Restructuring Roundtable.
Collier County Tourism Research
Non-Citizen Population, by State, 2011
Resilience and Reliability in PJM’s Competitive Markets
23 states + Washington DC have an RPS with solar or DG provisions
WECC Annual Meeting 9/11/2018 Cameron Warren
Renewable energy builds a more reliable and resilient electricity mix
Trends in U.S. Electric Power Markets and Renewable Integration
IAH CONVERSION: ELIGIBLE BENEFICIARIES BY STATE
619 Involvement in State SSIPs
We help food manufacturers make data-driven decisions.
State Health Insurance Marketplace Types, 2015
State Health Insurance Marketplace Types, 2018
PRACTICA & ONLINE ED AUTHORIZATION STATUS
State Health Insurance Marketplace Types, 2017
(map is coded by CAE-CD region)
S Co-Sponsors by State – May 23, 2014
ADS 2028 Phase 1 V2.2 NW Transmission Wheeling Rates
WECC Annual Meeting 9/11/2018 Cameron Warren
How State Policies Limiting Abortion Coverage Changed Over Time
States’ selected SIMRs for Part C FFY 2013 ( )
States including quality standards in their SSIP improvement strategies for Part C FFY 2013 ( ) States including quality standards in their SSIP.
Renewable & Clean Energy Standards
States including their fiscal systems in their SSIP improvement strategies for Part C FFY 2013 ( ) States including their fiscal systems in their.
Renewable & Clean Energy Standards
Presentation transcript:

Electrical Maps of Final 3 Futures Stanton W. Hadley 11/9/11

Maps show Capacity and Energy Flow Maps show results from: F1S17 (Final BAU, no Tx added) F6S10 (Regionally applied RPS, 3 GW Tx added) F8S7 (CO2 price flattened post-2030, Aggressive EE/DR/DG, MISO CC and Wind shifted, 37 GW Tx added) First set of maps show energy flow between regions Values on lines show amount of transfer in GWyr Arrow after number and on line show direction of net flow Colors show regions with highest net export (blue) and highest net import (red) Second maps show total Tx capacity between regions Third maps show added Tx capacity between regions

Net Export Legend (GWyr) 2030 Net Export (GWyear): Blue=Export, Red=Import NWPP RMPA MAPP US MAPP CA NE SPP N SPP S AZ NM SNV ERCOT MISO W MISO MO IL MISO WUMS MISO MI MISO IN IESO PJM Rest of RTO TVA VACA NEISO NYISO A-F GHI J & K PJM Eastern MAAC PJM Rest of MAAC SOCO FRCC ENTERGY Non RTO Midwest HQ Maritimes F1S17 Final BAU Net Export Legend (GWyr) 3.5 Max Neutral 0.0 Min -5.5 0.3v 0.1> 0v 0^ 0< 0.1v 0.2< 0> 0.4v 0.1< 1.9^ 0.7> 0.6> 0.3< 0.6v 1v 0.5v 2.9v 0.8> 0.2^ 5v 0.1^ 1.7> 3.1> 0.9> 1.4v 2.2> 0.7v

Net Export Legend (GWyr) 2030 Net Export (GWyear): Blue=Export, Red=Import NWPP RMPA MAPP US MAPP CA NE SPP N SPP S AZ NM SNV ERCOT MISO W MISO MO IL MISO WUMS MISO MI MISO IN IESO PJM Rest of RTO TVA VACA NEISO NYISO A-F GHI J & K PJM Eastern MAAC PJM Rest of MAAC SOCO FRCC ENTERGY Non RTO Midwest HQ Maritimes F6S10 HardPipes Net Export Legend (GWyr) 8.2 Max Neutral 0.0 Min -5.1 0.6v 0> 1.1v 0.4^ 0< 0.3v 0.8> 0^ 1v 1.1> 0.2< 1^ 1.7> 0.1v 0.5^ 0.7v 0.7> 2.5v 0.3^ 0v 1.3> 0.1^ 0.7^ 0.3< 1.8v 3.4v 0.9> 0.6^ 4.5v 0.2^ 5.1> 0.1< 0.1> 2.2> 1.3v 1.3< 0.4v

Net Export Legend (GWyr) 2030 Net Export (GWyear): Blue=Export, Red=Import NWPP RMPA MAPP US MAPP CA NE SPP N SPP S AZ NM SNV ERCOT MISO W MISO MO IL MISO WUMS MISO MI MISO IN IESO PJM Rest of RTO TVA VACA NEISO NYISO A-F GHI J & K PJM Eastern MAAC PJM Rest of MAAC SOCO FRCC ENTERGY Non RTO Midwest HQ Maritimes F8S7 Final Hardened Net Export Legend (GWyr) 17.1 Max Neutral 0.0 Min -10.8 0.3v 1> 6.1v 2.9^ 0> 0.6v 0< 0.1v 1.2v 0.1> 2.1> 0.2^ 0.2< 0.9v 1.4> 1.1v 0^ 3.1> 0.4v 3.8v 1.6> 1.8v 1.3> 2.4> 18.1v 0.3> 0.3< 0.1^ 0v 5.1v 0.7v 5.5v 0.4< 5.7> 0.9< 1.8> 2v 1.3< 2.5> 2.2v 0.6<

Total Line Capacity (GW) NWPP RMPA MAPP US MAPP CA NE SPP N SPP S AZ NM SNV ERCOT MISO W MISO MO IL MISO WUMS MISO MI MISO IN IESO PJM Rest of RTO TVA VACA NEISO NYISO A-F GHI J & K PJM Eastern MAAC PJM Rest of MAAC SOCO FRCC ENTERGY Non RTO Midwest HQ Maritimes Total GW F1S17 Final BAU 2.5 2.4 3.5 0.8 0.3 2.6 2.0 5.0 4.8 1.0 1.8 1.4 3.8 1.2 4.1 1.6 2.8 0.1 3.2 0.6 4.3 6.1 1.5 8.0 3.0 0.2 3.7 4.0 0.4 2.9 125.8 1.7 1.1 1.3

Total Line Capacity (GW) NWPP RMPA MAPP US MAPP CA NE SPP N SPP S AZ NM SNV ERCOT MISO W MISO MO IL MISO WUMS MISO MI MISO IN IESO PJM Rest of RTO TVA VACA NEISO NYISO A-F GHI J & K PJM Eastern MAAC PJM Rest of MAAC SOCO FRCC ENTERGY Non RTO Midwest HQ Maritimes Total GW F6S10 HardPipes 2.5 2.4 3.5 0.8 0.3 2.6 2.0 5.0 4.8 1.0 1.8 1.4 3.8 1.2 4.1 1.6 2.8 0.1 3.2 3.0 0.6 6.2 1.5 8.0 0.2 3.7 4.4 0.4 2.9 1.9 129.3 1.7 0.5 1.1 1.3 0.9

Total Line Capacity (GW) NWPP RMPA MAPP US MAPP CA NE SPP N SPP S AZ NM SNV ERCOT MISO W MISO MO IL MISO WUMS MISO MI MISO IN IESO PJM Rest of RTO TVA VACA NEISO NYISO A-F GHI J & K PJM Eastern MAAC PJM Rest of MAAC SOCO FRCC ENTERGY Non RTO Midwest HQ Maritimes Total GW F8S7 Final Hardened 2.5 2.4 3.5 0.8 0.3 2.6 2.0 5.5 4.8 1.0 3.1 1.4 4.0 1.2 4.1 1.7 0.2 19.8 1.9 0.6 5.3 6.1 1.5 8.0 3.0 3.7 0.4 1.8 3.3 167.3 2.2 1.6 5.0 1.1 4.7 7.3

Line Capacity Additions (GW) NWPP RMPA MAPP US MAPP CA NE SPP N SPP S AZ NM SNV ERCOT MISO W MISO MO IL MISO WUMS MISO MI MISO IN IESO PJM Rest of RTO TVA VACA NEISO NYISO A-F GHI J & K PJM Eastern MAAC PJM Rest of MAAC SOCO FRCC ENTERGY Non RTO Midwest HQ Maritimes Total GW F6S10 HardPipes 0.0 1.2 0.5 0.1 0.4 3.1 0.8

Line Capacity Additions (GW) NWPP RMPA MAPP US MAPP CA NE SPP N SPP S AZ NM SNV ERCOT MISO W MISO MO IL MISO WUMS MISO MI MISO IN IESO PJM Rest of RTO TVA VACA NEISO NYISO A-F GHI J & K PJM Eastern MAAC PJM Rest of MAAC SOCO FRCC ENTERGY Non RTO Midwest HQ Maritimes Total GW F8S7 Final Hardened 0.0 0.5 1.3 0.2 2.0 0.1 19.1 1.0 36.8 0.6 3.4 5.5