1 | P a g e SLABS Engineering Pvt. Ltd., World Trade Center, Level 9, Tower 2, Opp. EON Free Zone, Kharadi, Pune India. T / E: Project Brief: Meriyeden Project Name Yenepoya University – Family Accomodation Categories: Small Practices, Small Projects Structural Designer SLABS Engineering Private Limited Brief Description Entire Precast Modular structural has been engineered in a way to reduce down the construction time frame and having its quality in regards to stability of the building at its core strength. The complex for staff and students, comprising 96 apartments, with each floor featuring 12 two-bedroom units, was completely manufactured at KEF Infra One Industrial Park in Krishnagiri in Tamil Nadu. The state-of-the- art facilities is the only plant in the world to manufacture every element of a building, which include wall panels, hollow core slabs, bathrooms, facades, windows, doors etc. at a single location. Location Yenepoya University, Mangalore, Karnataka, India Date of Completion 20th October 2015 Cost 26 Crores Indian Rupees Client Yenepoya Group Principal Precast Contractor and Fabricator KEF Infrastructure India Private Limited Principal Architect Sunil Upalekar and Architects Architect KGD Architects Consulting Structural Engineers SLABS Engineering Private Limited This Document is Copyright of SLABS Engineering Private Limited
2 | P a g e Project Contact Shabbir Lokhandwala SLABS Engineering Pvt. Ltd., World Trade Center, Level 9, Tower 2, Opp. EON Free Zone, Kharadi, Pune India. T / E: Project Representative Shabbir Lokhandwala SLABS Engineering Pvt. Ltd., World Trade Center, Level 9, Tower 2, Opp. EON Free Zone, Kharadi, Pune India. T E: E: T: Vision and excellence We Design and Build Structures for Life Creativity and Innovation We helped the Architects to simplify the space planning to uniquely suit precast technology requirements. In order to increase repeatability of structural elements as well as keeping the aesthetics of the building intact and appealing led us to create this project within the shortest timeframe to suit client’s requirements. Pre engineering : Sunshade, Load Bearing Wall Panels, Hollow core slabs, Stair Flights, Landings, Bathroom Pods, Beams and Columns; were an integral part of structural framing system. These pre-engineered parts helped reducing the construction time frame in order to complete the project within the shortest time of 6months for completion of superstructure in precast. This Document is Copyright of SLABS Engineering Private Limited
3 | P a g e Project Photographs Fig. 0-1Precast Stair Flight View © Copyright SLABS Engineering Private Limited This Document is Copyright of SLABS Engineering Private Limited
4 | P a g e © Copyright SLABS Engineering Private Limited Fig. 0-2 Precast Service Duct Area This Document is Copyright of SLABS Engineering Private Limited
5 | P a g e Fig. 0-3 Kitchen Area _ HCS and Walls Fig. 0-4 Kitchen Area _ Finished © Copyright SLABS Engineering Private Limited This Document is Copyright of SLABS Engineering Private Limited
6 | P a g e Fig. 0-5 Bedroom 1 Area_Finished Fig. 0-6 Bedroom 2 Area _ Finished © Copyright SLABS Engineering Private Limited This Document is Copyright of SLABS Engineering Private Limited
7 | P a g e Fig. 0-7 Bathroom POD _ 1 © Copyright SLABS Engineering Private Limited This Document is Copyright of SLABS Engineering Private Limited
8 | P a g e Fig. 0-8 Bathroom POD _ 2 © Copyright SLABS Engineering Private Limited This Document is Copyright of SLABS Engineering Private Limited
9 | P a g e © Copyright SLABS Engineering Private Limited Fig. 0-9 Corridor Area _ HCS and Walls with Electric Fittings This Document is Copyright of SLABS Engineering Private Limited
10 | P a g e Fig Finished Building _ 1 © Copyright SLABS Engineering Private Limited Fig Overview Door _ Corridor Area This Document is Copyright of SLABS Engineering Private Limited
11 | P a g e Fig Finsihed Building _ 2 Fig Finished Building_3 © Copyright SLABS Engineering Private Limited This Document is Copyright of SLABS Engineering Private Limited
12 | P a g e Fig Finished Building_4 © Copyright SLABS Engineering Private Limited This Document is Copyright of SLABS Engineering Private Limited