ABB Life Cycle Definition

Slides:



Advertisements
Similar presentations
© ABB Oy 1 DOCPLCMODEL01 ABB Drives product lifecycle management model (PLM) June 2004.
Advertisements

Chapter 2 Modeling the Process and Life Cycle Shari L. Pfleeger
The Systems Development Lifecycle Your_Name_Here.
Phase Difference = Phase Difference = 0.05.
Master Budgets Chapter 22 Exercises.
Excitation-contraction coupling Sliding filament mechanism independent studies by Huxley and Huxley (no relation) in 1954.
Accounting for Plant Assets and Depreciation
© ABB | Slide 1 Preparing for the power evolution Copy + Paste toolkit ABB Automation & Power World’s SmartStream digital conference January 2014.
Avaya - Proprietary. Use pursuant to your signed agreement or Avaya policy. 11  Cleaner, more international design –Removes English language button labels.
© ABB Oy 1 DOCPLCMODEL03 ABB ULMA / Web Imaging Systems lifecycle management model (LCM) March 2004.
W A X I N G # 17 B Y : L A U R E N. WAXING MOON DEFINITION, THE MOON AT ANY TIME AFTER NEW MOON AND BEFORE FULL MOON, SO CALLED BECAUSE ITS ILLUMINATED.
To the teacher: This CPO Science PowerPoint presentation is designed to guide you through the process of presenting the lesson to your students. The.
1 Given the following data, calculate forecasts for months April through June using a three- month moving average and an exponential smoothing forecast.
Life cycle services for automation products
Large Equipment and Project Planning Marla Meehl and Teresa Shibao July 22, 2008 Marla Meehl and Teresa Shibao July 22, 2008.
Simulation.  A simulation takes a set of data and project it over time using a formula. Sales for Customer A Sales for Customer B TIME TodayNext YearTwo.
Warm Up 9/11 Which of the conditionals and its converse could be written as a bi-conditional?(could be more than one)  If you are a sophomore, then you.
A Next Generation OCS Agenda of Topics January Webinar Release of 2011 Price List Sales Material Preview for 2011 Regional Training Announcement Lead Time.
1 The Monthly Cycle Book Resources
WATERFALL METHOD Robbie Campbell WHAT IS IT  Considered the classic approach to the SDLC.  It is a linear method with goals for each development phase.
Phase changes! 11/11/15. Changes of State SOLID LIQUID GAS PLASMA Tightly packed, in a regular pattern Vibrate, but do not move from place to place Close.
Do Now- Copy the following definitions ** 6 mins until this slide is removed** Interest- is the charge for the privilege of borrowing money, typically.
240,000 20p + a SATMathVideos.Net A) 550 books B) 600 books C) 650 books D) 700 books 1,000 books sold in a month when the price was $10 per book. An equation.
Rocks and Minerals. Questions to think of: What do you notice about the color? What do you notice about the shape? Is it a rock or mineral? Why? What.
Cost & Management Accounting Material Lecture-7 Mian Ahmad Farhan (ACA)
© 2014 Cengage Learning. All Rights Reserved. Learning Objective © 2014 Cengage Learning. All Rights Reserved. LO5 Estimate the cost of merchandise inventory.
Explaining Business Cycle Fluctuations with the Classical Model Outline: 1.The business cycle: again. 2.Cyclical fluctuations as an equilibrium phenomenon.
LESSON 18-1 Buying Plant Assets and Paying Property Tax.
User Manual Product Specifications
COST CONCEPTS.
Classic Cars There are various brands of classic cars that are well welcomed by the people around the whole universe. It is because of their performance.
Potential Impact on the Cotton Industry
By Robyn Dean Christy Lewis
Operations an exploration of basic manufacturing operations, forecasting, budgeting and control.
Master Budgets Chapter 22 Exercises.
Iterative Waterfall Model
Prepare Tax Documentation for Individuals
continued on next slide
Section 8.3: The Sampling Distribution of a Sample Proportion
Low Voltage Products - LP Life Cycle Management - LCM
Presentation Test. Second Slide Third Slide It worked.
ABB Low Voltage Service presents
Drive life cycle management model
                                                                                                                                                                                                                                                
Crown and Griffin Books
continued on next slide
continued on next slide
Improve production process at metallurgical company
Technical Data Management Bills of Materials
Purpose Top-down approach for TGh from D1.1 to D2.0
The Next Hot Item The Fashion Cycle.
COST CONCEPTS.
Budgeting LO 5 – Preparing Balance Sheet Budgets for a Manufacturing Business.
Buy now at
EDLC(Embedded system Development Life Cycle ).
Human Information Processor
Mod 230: QSEC and AMSEC Timings
Also called “States” of Matter
АВЛИГАТАЙ ТЭМЦЭХ ҮНДЭСНИЙ ХӨТӨЛБӨР /танилцуулга/
Product Phase Out Notice
Accounting for Plant Assets and Depreciation
£12.99.
Completing the Accounting Cycle
Now Pass Your Microsoft MB-330 Exam With More Efficient Way.
continued on next slide
Hair Removal Methods: What's Effective and What's Not.
Characteristics of Life
R5.6 Measurements Change Summary
Operations an exploration of basic manufacturing operations, forecasting, budgeting and control.
continued on next slide
Presentation transcript:

ABB Life Cycle Definition Active (normal production, sales and development phase) Classic (Service product maintenance phase) Limited (service organization responsibility) Obsolete (service organization responsibility) ~ 10 years ~ 5years ~ 5years Active Classic Limited Obsolete ~12 months ~6 months ~12 months Removal from Limited phase announcement Released for Sale Removal from active sales announcement Removal from Classic phase announcement “Last buy” and “Manufacturing End” Notices will be announced during Limited Phase. © ABB Group January 17, 2019 | Slide 1