The Asset Management Journey for Building Assets

Slides:



Advertisements
Similar presentations
Building Codes, Zoning Ordinances
Advertisements

Contents: Cover
Facts about King County Metro Transit Area served …. 2,134 square miles Population served …. 1,884,200 Coaches …. 1,301 (907 diesel, 235 hybrid, 159 electric.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
Basic Building Condition Assessment – Part 1 Prepared for Delivery through AGLEARN.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
See the Present… Know the Future…. RECAPP ® Markets Telecom Facilities Municipalities Government Transportation.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Facility Management. The International Facility Management Association defines facility management as a profession that encompasses multiple disciplines.
January 20, 2015 City Council Meeting. Purpose Council direction on moving forward with: Housing linkage fee in short term based on 2009 Study and existing.
Considering Tax-Supported Debt May 10, 2004 Presentation to City Council Roger Rosychuk Corporate Services Department.
INTERIOR WALL FINISHES
Sustainment Management Systems
I-Web Documentation Part VI – Work Items FACILITY CONDITION SURVEY TEAM Steve Oravetz PE, R1 (Team Leader) Bruce Crockett, R1 Randy Warbington PE, R8 Jim.
Manage the Facility Condition Index (FCI)
CODE ENFORCEMENT. Code Enforcement Code Enforcement Officers work in twelve geographically defined code enforcement areas. In each area the inspectors.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Facilities Condition Audit Summary of Findings Entech is a full-service Architectural/Engineering firm providing design, construction management, facilities.
Phoenix Convention Center Phoenix, Arizona Introducing the Building Energy Asset Score Building Performance Session 2: Elements of Building and Data Management.
Facilities Condition Assessment Initiated: February 2004 Consultant: ISES Corporation Stone Mountain, GA Scope: Identify the conditions of our facilities,
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Debt Strategy Presentation to City Council May 10, 2004 Click to edit Master title style.
2014 Tax Supported Operating and Capital Budget Summary of Council Approvals January 29 and 30, 2014 Council Approved.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
1 Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
FACILITIES MAINTENANCE PLANNING
907 King Street Alexandria, Virginia. Basic Facts  Property Address: 907 King Street, Alexandria, Virginia  Property Type: 3-story walk-up office.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
South Greenville Recreation Center and Park Master Plan.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
Reduce Your Operating Expenses, Increase Your Profits a Story of Energy Efficiency.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Prepared by: Adam Pugh May 10-12, 2016 FIMS/RE Annual Training.
Facility Assessment Reports FY 16 Survey Results June 9, 2016.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption & Amendments to FY 16 CIP May 16, 2016.
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
Asset Planning & Optimization Capital Renewal Strategies
Proposed Draft Financial Plan April 10, 2017
Ten-Year Building Plan Update
Fun Facts: James M. Bennett High School
Standing Offers Discipline
Deferred Maintenance Deferred Maintenance
Capital Project Needs Assessment
Fall 2017 Update: Physical properties and sinking fund
City Owned Land And Building Review
Construction Documents
(Refer to Chapter 2 of the textbook)
Considering Tax-Supported Debt May 10, 2004
Enterprise Asset Management Proposal to Expand AiM :
Pre-Contract Cost Control
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Worcester Public Schools Study and Master Plan
Construction Management & Inspection
UNION GROVE ELEMENTARY REFERENDUM
Executive Summary The Vision helps Decisions (How having a clear vision helps your decision process): “As trusted stewards of Boulder County’s future,
M&E SYSTEM.
10 The Cost Approach—Part I: Reproduction/Replacement Cost
DOVER ELEMENTARY Existing MPB (2/14/12).
Asset Management Journey
Financing Better Retrofits
Capital Outlay Workshop
Presenters: Sergio Rodriguez, EAS Operations Manager | Kitchell CEM
Community Practice Asset Management.
Presentation transcript:

The Asset Management Journey for Building Assets Robin Alcorn, Engineering Technologist, Municipal Facilities Engineering and Environmental Services August 2018

If you don’t know what you own, you can’t manage it.

LIFE CYCLE MANAGEMENT STRATEGY 195 Buildings STATE OF INFRASTRUCTURE (Facilities) FINANCIAL STRATEGY 141,000 m2 $372,000,000 LIFE CYCLE MANAGEMENT STRATEGY DESIRED LEVEL OF SERVICE 75% of footprint

What do we own? Asset Registry Existing lists Staff Floors plans Past projects P.S.A.B Site Visits

How to organize it? BUILDING CATEGORY COMPONENT SIMPLE ASSET

Building Identification Implemented Process Added buildings to G.I.S. Added tags on buildings

Categories Building inventory was categorized to quickly reference the buildings specific use. Each category is associated with a number. 01 – Stand Alone 02 – Recreation 03 – Blank (Future) 04 – Concert Site 05 – Animal Zoo 06 – Operation Centre 07 – Utilities – Historical - Fire 195 Buildings 141,211 m2 (1 519 982 SF) (2017)

Components Site work Structural Architectural Exterior Roofing * Architectural Interior Mechanical Electrical Life Safety Specialty Systems* Each building is divided into Components (Systems) ASTM E2018-08 - Standard Guide for Property Condition Assessments IRC’s Protocols for Building Condition Assessments Capitol Planning Tool developed for Efficiency NB

Simple Assets Components are divided for a separate condition rating Service Criteria Simple Asset Site Infrastructure Condition External Doors Condition Overhead Doors Wall Finishes External Condition Masonry Windows Condition Glazing Superstructure Condition General Roof Condition Roof Section Substructure Condition Fitout and Fittings Floor Coverings Condition Plumbing Condition HVAC Condition BAS Condition Automation Hydraulics Condition Aesthetics Electrical Condition Lighting Condition Security Condition Security (access control, CCTV) Fire Condition Main Condition Simple Assets Components are divided for a separate condition rating

How old is it? G.I.S Dates back to the 50’s Past projects Construction date Building Age

How old is it? Each asset type could have a different installed date Lesson Learned Each asset type could have a different installed date

What is it worth? Replacement Values RS Means Insurance values Past Project Costs Industry Standards P.S.A.B

(Architectural Exterior) Cost Models ELECTRICAL SERVICE (Electrical and Power Distribution) SITE INFRASTRUCTURE (Site Work) parking lots excluded BUILDING SUPERSTRUCTURE (Architectural Exterior) FITOUT AND FITTINGS (Architectural Interior) BUILDING STRUCTURE (Structure) MECHANICAL SERVICE (Mechanical) ASSETIC COMPONENT TYPE (CMEL Categorization) ROOF (Roofing) FIRE (Life Safety) Shed ($5000,00) Replacement Model Type STRUCTURE SUB STRUCTURE SUPER BUILDING SITEWORKS Exterior Enclosur e INTERIORS Plumbing Protectio n Fire % for Roofing Electrical Component Name Used $ Replacement HVAC RS MEANS CATEGORIES (2013) Architectural Exterior x 22.0% $ 1,100.00 A Fire Station (1 Story 6000SF) 11.70% 8.00% 19.40% 5.60% 12.60% 10.30% 18.40% 8.00% 4.50% 1.50% Architectural Interior x 25.0% $ 1,250.00 B Police Station (2 Story) 5.10% 7.00% 27.00% 3.40% 17.00% 9.00% 13.00% 13.00% 4.00% 1.50% 13. 0E0l%ectrica6.l5&0%Power Distri1b5u.0t0i%on C Community Centre (10000 SF) 6.50% 0.0%28.00%$ 0.0%20.60%$ 8.50‐% 5.40‐% 9.40% 7.60% 4.00% 1.50% D Office (1 Story) 9. 0L0i%fe Safe7.t6y0% 11.30% 6.90% 15.90% 18.30% 3.50% 1.50% E Office (5‐10 Story) 3. 5M0%echa1n7i.c5a0l% 18.50% 2.00% 0.0%20.00%$ 4.00‐% 14.00% 15.00% 4.00% 1.50% F Warehouse (30000 SF) 23. 0R0%oofin1g3.00% 11.00% 8x.60% 10.5% 9.50%$ 45.2250%.00 7.60% 13.00% 8.60% 1.50% G Public Washroom 10. 1S0t%ructur7e.90% 24.30% 5x.30% 41.0%20.00%$ 21,20.5000%.00 6.30% 9.60% 3.00% 1.50% H Parking Garage (5 Story) 8.8S0i%te W4o6r.k20% 15.60% 0x.30% 1.5%12.60%$ 3.7050%.00 3.60% 7.40% 1.00% 1.50% I Rink (30000 SF) 9.30% 29.00% 10.00% 6.00% 9.00% 9.00% 12.00% 11.00% 3.20% 1.50% 100% $ 5,000.00 J Shed / Garage 41.00% 22.00% 10.50% 25.00% 0.00% 0.00% 0.00% 1.50% K Commercial (Single Story) 26.00% 13.00% 6.80% 15.90% 10.60% 10.00% 11.60% 4.60% 1.50% L Commercial (Multi Story) 17.00% 3.00% 8.40% 12.00% M Residential 14.00% 25.00% 11.00% 25.50% 5.00% 0.00% N Utility (minimal) 41.00% 22.00% 10.50% 15.00% 2.00% 6.00%

Total Replacement Value $372,000,000 (excluding SS)

What condition is it in? Integrated Facility Study Building Condition Assessment Energy Audit 25 Year Capital Plan 33/187 Buildings 141,000m 2 Total 72% 104,000m 2 accessed

Facility Condition Assessment Program Integrated Facility Study In 2015, a consultant provided an Integrated Facility Study for 33 facilities. This chart shows the impact these reports have had on each category of buildings. Total Assessed 104,584 m2 72%

Adjusted based on condition Roofing (sample) Adjusted based on condition

Condition Rating Score Component Condition Breakdown Time frame to complete requirement New Does not require work (new) 1 Good Recommended (year 16‐25) 2 Fair to Good Recommended(year 11‐15) 3 Fair Recommended (year 6‐10) 4 Poor to Fair Necessary, not yet critical (Year 3‐5) 5 Poor Potentially Critical (year two) 6 Replace Currently Critical (immediate) Lesson Learned Determine condition score before any reports are completed for consistency.

What should be done and when? Restricted funding requires priority based decisions. Mission Dependency Index (MDI) 75-100 Criticality of asset 45-65 0 - 40

Level of Service Component MDI LOW (0‐40) MDI MEDIUM (45‐65) MDI HIGH (70‐100) Site Work 4 Architectural Exterior 3 2 Roofing Structure Architectural Interior Mechanical N/A Electrical & P ower Distribution Life Safety

Condition rating of 4 20% of $100,000 = $20,000 for repairs BLDG09007RFA is worth $100,000.00 Treatment (Template Level) Treatment Unit Cost Treatment Criteria MDI LOW (0‐40) MDI MEDIUM (45‐65) MDI HIGH (70‐100) Treatment Name LOS Condition Assessment 5% 3 N/A 4 or 5 n/a 6 anytime 4 N/A 5 2 4 or 5 Rehab 1 20% Rehab 2 50% Replace 100% Condition rating of 4 20% of $100,000 = $20,000 for repairs

25 Year Capital Plan (Roofs Only)

Capital Planning High High priority buildings in good condition High priority building in poor Regular occuring maintenance and Stabilize, restore, renew & repair Transfer or designate for benficial use to other parties Candidates for diposal. The facility no longer supports the mission low priority buildings in good condition low priority buidlings in poor condition When we use the Condition Rating along with the MDI, we can determine some options. Mission Dependancy Index (MDI) MED Low 0 6 Condition Rating

High Priority Buildings in Poor Condition

Future……….. Financial Strategies Continuous Improvement Current funding available Strategies for addressing shortfalls Continuous Improvement Facility Asset Management Plan Facility Master Plans Space analysis assessments

Robin Alcorn, FMP City of Moncton Questions? Thank-you Robin Alcorn, FMP City of Moncton