Optical Gigabit Ethernet

Slides:



Advertisements
Similar presentations
Gigabit Ethernet Group 1 Harsh Sopory Kaushik Narayanan Nafeez Bin Taher.
Advertisements

Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 9 Vinh Nguyen April 14, 2005.
ECE 135 – The Three Presentation 10 Bryan Chavez with Pat Cleary & Kevin Parker April 14 th, 2005 April 14 th, 2005.
Gigabit Ethernet PMD Opto-Link, Inc. – Progress Summary Vinh Nguyen, Clifton Kerr, Andrew Meyerson, Bryan Justice April 21, 2005.
Progress Report of Gigabit Ethernet Design ECE 4006A October 18, 2001 Ashley Lee Shaun Rosemond.
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Group 2 - Project Update April 1, 2004 Tyler Helble.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
Intel/Agilent OE Group Karen Cano Scott Henderson Di Qian.
Presenter: Kenny Haulk. 2 This Week’s Highlights Tested Receiver with attenuation and shielding Measured power output from GDS1250 TX and our own VCSEL.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Gigabit Ethernet: An Affordable Solution Preliminary Design G4 Gaurav Asthana James Denaro.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
ECE Group 2 – Presentation 8
Opto-Link, Inc. – Status Report 8 Clif Kerr March 31, 2005
ECE 135 – BtrLaytDanNvr Presentation 7
Optical Gigabit Ethernet
Kevin Parker with Bryan Chavez & Pat Cleary February 24th, 2005
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Progress Report ECE 4006 Harsh Sopory
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
Enhancing and Implementing an Improved Gigabit Ethernet Card
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Presenter: Chris Lambrecht
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
ECE 135 – Group 3 Presentation 1-2
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Receiver Circuit Testing
Receiver Circuit Testing
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.
ECE 4006 Group 6 – Presentation 8
Project GabE ECE 135 – Spring 2005
ECE 135 – VCSEL Kings Presentation 5
Optical Gigabit Ethernet
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
GROUP 1 FINAL PRESENTATION
GIGABIT ETHERNET DESIGN ECE Spring 2004
Project GabE ECE 135 – Spring 2005 Presentation 10
Task List Group management plan Background studies
Gigabit Ethernet Design ECE – Spring 2004
Talal Jaafar Ibrahima Bela Sow Mohammad Faisal Zaman
ECE 135 – The Three Presentation 9
Laser Drive Needs Total laser current BIAS Current
Project GabE ECE 135 – Spring 2005 Week 9
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

Optical Gigabit Ethernet Group F.O.R.E. March 31, 2005 Ronen Adato

Progress Overview Completed Midterm Report Soldered and Tested 2 Conservative Design Boards

Eye Produced by Rx Circuit, Signal PRBS 7 Conservative Board 1 Soldered all components and tested the Rx circuit for a clear eye Errors in part selection prevented BER testing for the Rx circuit, and any Tx circuit testing Rx Circuit Test Setup Eye Produced by Rx Circuit, Signal PRBS 7

Conservative Board 1 QMAs were sent instead of SMAs We elected to attempt and use these incorrect parts A clear eye was produced by the Rx circuit, but the coaxial cables had to be held tightly into the QMAs BER testing of the Rx circuit was impossible as a consistent signal could not be achieved with the QMAs Tx circuit was not tested as this would have been very difficult with the QMAs

Board 1 With QMAs Removed Conservative Board 2 SMAs were removed from the test board to be used in the prototype The QMAs were removed from the original board Attempts to insert the SMAs into the holes occupied by the QMAs resulted in the destruction of a trace Board 1 With QMAs Removed The Destroyed Trace

The Second Conservative Board The VCSEL and ROSA were de-soldered and a new board was constructed The VCSEL was recycled while a new ROSA was used The Limiting Amplifier (MAX3264) was incorrectly placed and had to be removed and re-soldered The Second Conservative Board

Conservative Board 2 The Rx circuit failed to produce an eye It was determined that the LA (MAX3264) had been damaged Rx Circuit Waveform Measured Before LA Rx Circuit Waveform Measured After LA

Conservative Board 2 The Tx circuit was tested and does not work The VCSEL is not lasing Voltage measurements were taken throughout the circuit In general, the entire loop around the VCSEL has a 5V dc voltage Potentiometer adjustments changed nothing We suspect our VCSEL may not be functioning

GANTT Chart

Tasks for Next Week Replace the LA in the Rx circuit and retest, including BER measurements Fix and test the Tx circuit The VCSEL will probably be replaced Loop-back test the entire board Solder and test the aggressive design