Liaison from 802.15 to 802.18 Date: 16March 2017 March 2017 Name Affiliation Address Phone email Jay Holcomb, Vice-Chair 802.18 Itron, Inc. 2111 N. Molter Liberty Lake, WA 99019 1.509.891.3281 jay.holcomb@itron.com Notice: This document has been prepared to assist IEEE 802.18. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Jay Holcomb, Itron, Inc.
March 2017 Overview This document summarizes the activities of the IEEE 802.15 Working Group for IEEE 802.18 RR-TAG during the March 2017 IEEE 802 Plenary Meeting at the Hyatt Regency, Vancouver, BC, Canada. Jay Holcomb, Itron, Inc.
Task Group Status (1/2) March 2017 Task Group Closing Reports: CLOSING REPORT: TG3d 100G THZ - KUERNER 15-17/201r00 CLOSING REPORT: TG3e HRCP (HIGH RATE, CLOSE PROXIMITY) - ESTRADA done CLOSING REPORT: TG4s SRU (SPECTRUM RESOURCE UTILIZATION) - KITAZAWA 15-17/214r00 CLOSING REPORT: TG4t HRP (HIGHER RATE PHY) - POWELL done CLOSING REPORT: TG4v RSGB Regional Sub-GHz band updates - BEECHER 15-17/0178r01 CLOSING REPORT: TG7m (7r1) OWC (OPTICAL WIRELESS COMMS) - ROBERTS 15-17/0212r02 CLOSING REPORT: TG8 PAC (PEER AWARE COMMUNICATIONS) - LEE 15-17/0217r01 CLOSING REPORT: TG10 L2R (LAYER 2 ROUTING) (overview) - POWELL 15-17/0205r00 CLOSING REPORT: TG12 ULI (UPPER LAYER INTERFACE) - KINNEY 15-17/0110r02 Jay Holcomb, Itron, Inc.
Study & Interest Group Status March 2017 Study & Interest Group Status SGs CLOSING REPORT: SG 11 MG (LiFi) (TG13) JUNGNICKEL 15-17/0233r00 IGs CLOSING REPORT: IG LPWA (low power wide area) - ROBERT (WG) 15-17/0231r00 CLOSING REPORT: IG HRRC (HIGH RATE RAIL) - KIM 15-17/0191r00 CLOSING REPORT: IG DEP (DEPENDABILITY - KOHNO 15-17/0213r00 CLOSING REPORT: IG THZ - KUERNER not meeting CLOSING REPORT: IG VAT (VEH. ASSIT TECH.) - JANG no report SCs CLOSING REPORT: IETF/RULES/SC-M - KINNEY 15-17/169r01 CLOSING REPORT: WNG - KINNEY n/a___ Jay Holcomb, Itron, Inc.
Other Group Status March 2017 Liaison Reports 802.11 LIAISON REPORT - Petrick 15-17/0230r0 802.18 LIAISON REPORT - Holcomb 15-17/0208r0 802.19 LIAISON REPORT - Shellhammer n/a 802.24 LIAISON REPORT - Godfrey/Rolf verbal Jay Holcomb, Itron, Inc.
802.15 Meeting Close The 802.15 WG adjourned Thursday evening JanuaryMarch 2017 802.15 Meeting Close The 802.15 WG adjourned Thursday evening The next face to face meeting of the 802.15 WG be the Interim 08 – 12 May 2017 at the Daejeon Convention Center, Daejeon, South Korea. Jay Holcomb, Itron, Inc.