Submission Title: ULP TG Closing Report Waikoloa, HI 2013 May 2013 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: ULP TG Closing Report Waikoloa, HI 2013 Date Submitted: May 2013 Source: SSSsShahriar Emami, Samsung 75 W Plumeria Drive, San Jose, CA, USA Abstract: Closing report for May ULP TG . Purpose: Overview of activities during the meeting Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Shahriar Emami, Samsung
ULP TG Closing Report Waikoloa, HI May 2013 May 2013 Shahriar Emami, Samsung
May 2013 Session Total of 4 time slots AM1 and AM2 on Tuesday AM1 and AM2 on Thursday Shahriar Emami, Samsung
Achievements Worked on TGD Reviewed channel modeling draft May 2013 Achievements Worked on TGD Reviewed channel modeling draft Heard PHY related presentation Made changes to the time line Shahriar Emami, Samsung
Call for Contributions May 2013 Call for Contributions IEEE 802.15.4q TG issued a call for contributions to applications, technical guidance and the channel modeling documents in March 2013. The call is extended and the contributions will be heard in the upcoming July session. The IEEE 802.15 July Session will be held during the week of 14-19 July 2013 at the ITU in Geneva, Switzerland. The scope of proposals is strictly limited to those described in the Project Authorization Request (PAR) document 15-12-0386-06-004q-ulp-par.pdf (https://mentor.ieee.org/802.15/dcn/12/15-12-0386-06-004q-ulp-par.pdf). If you are planning to contribute, you are asked to submit a notification of intent to TG 4q chair, Dr. Shahriar Emami (Shahriar.e@samsung.com) and TG4q reflector. Shahriar Emami, Samsung
May 2013 Presentations Considerations about optimal data rates by Frederick Beer (15-13-322-00) Channel modeling draft by Jinesh Nair (15-13-329-01) Shahriar Emami, Samsung
Timeline (1) May 2013 Preliminary work - Call for applications Dec 2012 - Applications presentations Jan 2013 - TGD outline March 2013 - TGD, applications and channel modeling contribution call March 2013 - Review TGD contributions May 2013 - TGD Ongoing & review application contributions July 2013 Proposal effort - Call for intent July 2013 - TGD completed Sep 2013 - Call for proposals Sep 2013 - Proposal presentations Nov 2013 - Technical baseline Jan 2014 Drafting - Preliminary draft March 2014 Shahriar Emami, Samsung
Timeline (2) First draft March 2014 Balloting May 2013 Timeline (2) First draft March 2014 Balloting - WG letter ballot May 2014 - First recirculation July 2014 - Second recirculation Sep 2014 - Sponsor ballot Oct 2014 - Submit to Revcom March 2015 Shahriar Emami, Samsung