DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY Product and Production Configuration Method (PPCM) ICE 2009 IMS Workshops Dorothy Parallel.

Slides:



Advertisements
Similar presentations
Advanced Piloting Cruise Plot.
Advertisements

Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
and 6.855J Spanning Tree Algorithms. 2 The Greedy Algorithm in Action
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
Solve Multi-step Equations
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
Green Eggs and Ham.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Copyright © 2013, 2009, 2006 Pearson Education, Inc.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
CpSc 3220 Designing a Database
Presentation transcript:

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY Product and Production Configuration Method (PPCM) ICE 2009 IMS Workshops Dorothy Parallel Session Noëlle Jufer

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 2ICE 2009 – Noëlle Jufer – 06/09 Content Aim of the Product and Production Configuration Method (PPCM) Components of PPCM PPCM in Dorothy Use Case Conclusion Outlook

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 3ICE 2009 – Noëlle Jufer – 06/09 Aim of PPCM Synchronization of the areas: Customer, Product and Factory Determination of the configuration knowledge

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 4ICE 2009 – Noëlle Jufer – 06/09 Components of PPCM

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 5ICE 2009 – Noëlle Jufer – 06/09 Customer driven design in Dorothy Shoe & Factory Shared Data Model Shoe & Factory Shared DM

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 6ICE 2009 – Noëlle Jufer – 06/09 PPCM in Dorothy Shoe & Factory Shared Data Model Shoe & Factory Shared DM

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 7ICE 2009 – Noëlle Jufer – 06/09 Use case – shoe collection scenario

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 8ICE 2009 – Noëlle Jufer – 06/09 Customer Options

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 9ICE 2009 – Noëlle Jufer – 06/09 Customer View in PPCM (1/2)

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 10ICE 2009 – Noëlle Jufer – 06/09 Customer View in PPCM (2/2)

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 11ICE 2009 – Noëlle Jufer – 06/09 Product View Legend

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 12ICE 2009 – Noëlle Jufer – 06/09 Legend Product View

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 13ICE 2009 – Noëlle Jufer – 06/09 Legend Product View

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 14ICE 2009 – Noëlle Jufer – 06/09 Legend Product View

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 15ICE 2009 – Noëlle Jufer – 06/09 Legend Product View

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 16ICE 2009 – Noëlle Jufer – 06/09 Legend Product View

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 17ICE 2009 – Noëlle Jufer – 06/09 Legend Product View

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 18ICE 2009 – Noëlle Jufer – 06/09 Product View in PPCM (1/2)

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 19ICE 2009 – Noëlle Jufer – 06/09 Product View in PPCM (2/2)

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 20ICE 2009 – Noëlle Jufer – 06/09 Factory View

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 21ICE 2009 – Noëlle Jufer – 06/09 Factory View in PPCM (1/2)

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 22ICE 2009 – Noëlle Jufer – 06/09 Factory View in PPCM (2/2)

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 23ICE 2009 – Noëlle Jufer – 06/09 PPCM completed

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 24ICE 2009 – Noëlle Jufer – 06/09 Use case exploitation

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 25ICE 2009 – Noëlle Jufer – 06/09 Exploitation (1/5) … …

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 26ICE 2009 – Noëlle Jufer – 06/09 Exploitation (2/5) … …

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 27ICE 2009 – Noëlle Jufer – 06/09 Exploitation (3/5) … …

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 28ICE 2009 – Noëlle Jufer – 06/09 Exploitation (4/5) … …

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 29ICE 2009 – Noëlle Jufer – 06/09 Exploitation (5/5) … …

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 30ICE 2009 – Noëlle Jufer – 06/09 Conclusion The configuration knowledge can be documented and visualized by the PPCM The relations and dependencies between the customer variants and the corresponding product- and production properties become visible This knowledge is crucial when synchronizing product- and production data

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 31ICE 2009 – Noëlle Jufer – 06/09 Outlook Calculation of performance indicators such as cost and throughput time for every specified customer variant Based on the PPCM and the Dorothy Shared Data Model, a performance indicator calculator software tool will be developed

DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY 32ICE 2009 – Noëlle Jufer – 06/09 Discussion Thank you for your attention Questions?