Pierluigi Paolucci & Giovanni Polese

Slides:



Advertisements
Similar presentations
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Advertisements

Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
A. Cimmino - P. Paolucci - G. Polese / DCS meeting DQM tool for the DCS data What the RPC community needs: 1.Make online/offline DCS data.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
MDT PS DCS for ATLAS Eleni Mountricha
D etector C ontrol S ystem HMPID SB G. De Cataldo CERN-CH, A. Franco & A. Nardulli INFN Bari, I 1 HMPID Updates and prototyping HMPID DCS with.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
G. Maron, Agata Week, Orsay, January Agata DAQ Layout Gaetano Maron INFN – Laboratori Nazionali di Legnaro.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
FSM – ConfDB Integration FW WG Meeting 17 th March, 2006 Fernando Varela Rodriguez, IT-CO (with the input from: Clara, Alex, Sascha, Piotr and Francisca)
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Configuration database status report Eric van Herwijnen September 29 th 2004 work done by: Lana Abadie Felix Schmidt-Eisenlohr.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Detector Control System
SPD DCS Overview & FED Server
DCS, DOMs and interplay with Run Control
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Simple metrics to assess code quantity and quality
CMS – The Detector Control System
Controlling a large CPU farm using industrial tools
RPC Barrel HV & LV system Lappeenranta University
MiniDAQ2 Workshop Control System.
TOTEM Configuration Tools
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci - I.N.F.N. Naples
Robert Gomez-Reino Garrido
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
The Online Detector Control at the BaBar experiment at SLAC
The LHCb Run Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
23 Barrel chambers and 12 Endcap chambers
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
RPC Detector Control System
DQM for the RPC subdetector
User Specific Framework Component
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Tools for the Automation of large distributed control systems
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Pierluigi Paolucci & Giovanni Polese RPC DCS INTEGRATION STATUS Pierluigi Paolucci & Giovanni Polese I.N.F.N. of Naples cms.na.infn.it 1/17/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli INTEGRATION STATUS First, create a hardware and a logical views of your detector system using the framework device editor & navigator. Design a hierarchical structure that allows detector logical partitions and hardware partitions. Identify your partitions and the smallest unit you want to model as a supervisor control unit. This unit should have meaning in terms of your different subsystems. Follow the naming conventions from the very begin. 1/17/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli INTEGRATION STATUS Define the states and commands of your devices trying to reduce the as much as possible the number of them. ON, OFF, ERROR, STANDBY, RAMPING UP, RAMPING DOWN… If exists, use the framework standard for your device. Summarize the states of your device units with the control units. At the level of the supervisor control tree the list should be small, typically: ON, OFF, STANDBY ,ERROR When you start creating the fsm nodes and fsm node types, use the naming convention from the very beginning. Renaming sometimes is very painful Create a ‘cms_detector’ folder inside the panels folder to store ALL your panels (same for pictures). “project_folder/panels/cms_detector/” DISCUSS 1/17/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli INTEGRATION STATUS Place a global variable in front of all your dp references in panel, libs or scripts. This variable will be filled with the appropriate system name. This way all the fsm panel will be accessible from the whole pvss systems. Use the configuration DB tool to store your different running modes and device parameters. Create your project as an installable component. The new framework installation tool provides functionality for this purpose. 1/17/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli FSM TOPNODE RESET ON OFF CONFIGURE CONFIGURE GOTO_STB STANDBY GOTO_STB RESET ERROR 1/17/2019 P. Paolucci & G. Polese - INFN di Napoli

STANDBY STATUS ONLY TOP NODE HAVE A STANDBY STATUS USE A INVISIBLE DEVICE TO LOAD DIFFERENT CONFIGURATION FROM DATABASE DCS Node (Root) STATES:ON,OFF,ERROR,STANDBY ACTIONS:CONFIGURE,RESET,GOTO_STB,RECOVER Device standBy IF (TOPNODE->CONFIGURE) LOAD FROM DB CONFIGURE RECIPE ELSE IF (TOPNODE ->RESET) LOAD FROM DB RESET RECIPE ELSE IF (TOPNODE->GOTO_STB) LOAD FROM DB STANDBY RECIPE Wheel P2 Wheel P2 STATES:ON,OFF,ERROR ACTIONS:CONFIGURE,RESET,RECOVER 1/17/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli MAJORITY USE MAJORITY FOR SECTOR AND WHEEL FSM. IF 2 CHAMBERS ARE IN STATE ERROR=> MAJORITY ERROR-> SECTOR STATUS =NOT_READY 1/17/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli SECTOR ALARM WE ARE INTESTING THE POSSIBILITY TO USE A SUMMARY ALARM FOR SECTORS TO INTEGRATE INTO TOPNODE. THIS ALARMS IS AN OR CONDITION OF ALL SECTOR’S CHAMBERS. FOR THIS AIM WE NEED A DATAPOINT STRUCTURED AS FSM TREE, FOR THIS REASON WE HAVE USED AN INTERNAL DATAPOINT SECTOR SUMMARY ALARM SECTOR FSM STATUS 1/17/2019 P. Paolucci & G. Polese - INFN di Napoli