Scheduling, Routing & Bunkering Unit #5

Slides:



Advertisements
Similar presentations
Gender Perspectives in Introduction to Tariffs Gender Module #5 ITU Workshops on Sustainability in Telecommunication Through Gender & Social Equality.
Advertisements

Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
Relevant Costs for Decision Making
Ship Routing Problem Morteza Ahmadi In The Name Of Allah.
Virtual Arrival means reduced emission Greening Logistics European Parliament Brussels 28 April 2010 Manager Research and Projects.
1 Global Real Estate Valuation Policy Update: the European Perspective The principle: the EU Treaty does not provide the European institutions with direct.
MARITIME TRANSPORTATION MANAGEMENT
Virtual Arrival an Initiative by Shipping to reduce GHG emission Singapore 8 may 2012 Senior Manager Research & Projects INTERTANKO.
| 1 | 1 REDUCING THE IMPACT OF SHIPPING ON THE ENVIRONMENT DECARBONISATION.
1The Logistic Institute – Asia Pacific Cargo Selecting Problem Abstract  The work describes a mathematical programming model for a cargo selection problem,
(c) 2002 Contemporary Engineering Economics 1 Chapter 3 Cost Concepts and Behaviors General Cost Terms Classifying Costs for Financial Statements Cost.
THE IMPACT OF GLOBAL LOGISTICS
ACCOUNTING FUNDAMENTALS UNIT :5 CHAPTER 29 PAGE 528.
Maritime Security from the Viewpoint of Maritime Labor George A. Quick Vice President International Organization of Masters, Mates and Pilots.
TRANSPORTATION OF GOODS Introduction –Conventions Hague Rules Air Carriage Marine Insurance.
FOOD ENGINEERING DESIGN AND ECONOMICS
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
TRANSPORTATION MANAGEMENT
Real application situation of virtual arrival policy in shipping industry Yuquan Du Postdoctoral Research Fellow, Centre for Maritime Studies, National.
Study Unit 9 Decision Analysis and Risk Management.
Ancillary Services UNIT 10.
A Case Study: BuyPC.com Developed by Jim Morton; UPS Professional Services David Simchi-Levi; MIT Michael Watson; LogicTools, Inc. See also BuyPC.pdf.
Worldscale Association (London) Limited1 WORLDSCALE New Worldwide Tanker Nominal Freight Scale Structure and Uses.
Location Planning and Analysis Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Introduction to Economics of Water Resources. Public or private Excludability (E): the degree to which users can be excluded Subtractability (S): the.
Bunker Refueling Planning and Onboard Fuel Inventory Mgmt Software.
TRAFFIC FORECASTING FOR PORT OPERATIONS. TRAFFIC FORECASTING The essence of port traffic forecasting is to attempt to forecast (predict): (a) What kinds.
Crosson Needles Managerial Accounting 10e Short-Run Decision Analysis 9 C H A P T E R © human/iStockphoto ©2014 Cengage Learning. All Rights Reserved.
GENERAL AVERAGE Prepared by: Norazimah Mazlan.  It is a form of mutual insurance that developed before the emergence of marine insurance.  Rhodian law.
VOYAGE (PASSAGE) PLANNING Marina Zanne, M.Sc.
MARINE INSURANCE.
Using financial data to measure and assess performance.
1 Accounting Concepts and Principles Dr. Clive Vlieland-Boddy.
THE IMPACT OF GLOBAL LOGISTICS
Allocation of Support Department Costs, Common Costs, and Revenues
Eco-efficient innovations – to meet the challenges in quality shipping
International Accounting Standard 16 Property, Plant and Equipment
GCC CODE “THE SAFETY REGULATIONS FOR SHIPS THAT ARE NOT COVERED BY THE INTERNATIONAL CONVENTIONS” THE CABINET RESOLUTION NO.(29) OF 2013.
For Products and Services
AIM: How can U. S. trade impact us as consumers
Financial and Managerial Accounting:
Pricing Decisions and Cost Management
Introduction to Economics of Water Resources Lecture 5
Internal and Governmental Financial Auditing and Operational Auditing
A Modeling Framework for Flight Schedule Planning
THE BUSINESS OF FOREIGN TRADE
PURCHASING AND SUPPLY MANAGEMENT
Supplement: Decision Making
Just Before You Buy Consider Container Shipping Rates In Toronto
Marine Repair Fundamentals
Air Carrier Continuing Analysis and Surveillance System (CASS)
Chapter 2: Cost Concepts and Design Economics
CHAPTER6: MARITIME LABOUR LAW
Interım fınancıal reportıng
Maritime Law General introduction Chapter1.
Supporting an omnichannel strategy Enabling an omnichannel strategy
Sizing Methodologies • Sizing Calculations
Contracts and Procurement
Voyage Estimating Unit #6
Chapter 2: Cost Concepts and Design Economics
Chapter 2 Marketing Plan. Chapter 2 Marketing Plan.
Chapter 2: Cost Concepts and Design Economics
PLANNING FOR CAPITAL INVESTMENTS
Chapter 2: Cost Concepts and Design Economics
Finances in the Building Company
Chapter 2: Cost Concepts and Design Economics
Manage financial resources to ensure solvency
Presentation transcript:

Scheduling, Routing & Bunkering Unit #5 Commercial Shipping Scheduling, Routing & Bunkering Unit #5

Importance of Scheduling & Routes In planning a vessel’s sailing schedule it is of the utmost importance that it be fully employed while it is available. It earns no money for the shipowner when laid up – whether for survey, general maintenance, or due to lack of traffic. Such periods must be kept to an absolute minimum. This is important because of the large amount of capital invested in a ship, which has heavy annual depreciation charges. A ship must earn as much profit as possible during its limited life. 1/17/2019 Presented by: Radcliffe Spence

Tramps & Cargo Liners For the commercial aspects of shipping, there are clear lines of division in the operation of vessels. Tramp shipping does not operate according to any published schedule neither is it constrained by practice. It will however operate according to a particular demand. Liner shipping however, sails on fixed schedules which are advertised in the public domain for the benefit of shippers. The route is also made available. 1/17/2019 Presented by: Radcliffe Spence

Factors influencing sailing schedule traffic and competition – volume/type/seasonality available ships – size/special equipment/plying limits crew availability and certification – cost/available efficiency of ship and port operations – time margins/port efficiency and service/voyage time/cost/traffic uncontrollable conditions of work – climatic/hostility/flag discrimination/canals/tidal effect/conference agreements 1/17/2019 Presented by: Radcliffe Spence

Load Lines Convention It has long been recognized that limitations on the draught to which a ship may be loaded make a significant contribution to her safety. These limits are given in the form of freeboards, which constitute, besides external weathertight and watertight integrity, the main objective of the Convention. The amount of cargo and supplies that may be carried on board a vessel varies with the route followed and the time of the year. This is because the maximum permitted draft varies according to the season and waters in which the vessel plies. 1/17/2019 Presented by: Radcliffe Spence

Load Lines Convention The first International Convention on Load Lines, adopted in 1930, was based on the principle of reserve buoyancy, although it was recognized then that the freeboard should also ensure adequate stability and avoid excessive stress on the ship's hull as a result of overloading. In the 1966 Load Lines convention, adopted by IMO, provisions are made determining the freeboard of ships by subdivision and damage stability calculations. The regulations take into account the potential hazards present in different zones and different seasons.  1/17/2019 Presented by: Radcliffe Spence

Load Lines Convention  The main purpose of these measures is to ensure the watertight integrity of ships' hulls below the freeboard deck. All assigned load lines must be marked amidships on each side of the ship, together with the deck line. Ships intended for the carriage of timber deck cargo are assigned a smaller freeboard as the deck cargo provides protection against the impact of waves. Loadlines define the minimum amount of freeboard the vessel must have. Freeboard is the distance measured amidships from the water line to the uppermost continuous deck in a ship with one or more decks. 1/17/2019 Presented by: Radcliffe Spence

Loadlines The navigable waters of the world are divided into loadline zones defined by the International Convention on Load Lines (1966). These geographical areas are described as either tropical (T), summer (S), or winter (W). Some areas are permanent and others are seasonal. When a ship is loaded to its tropical loadline mark, the ship’s master must take care that a seasonal tropical zone does not change to summer whilst the vessel is trading there. In such a case, the summer mark would be submerged and the ship would be overloaded and illegal. 1/17/2019 Presented by: Radcliffe Spence

Loadlines Also, as the vessel crosses from a tropical to an adjacent summer zone, the ship’s master must ensure that the weight carried is reduced enough to ensure that the ship rises in the water to its summer mark. This is done through the vessel’s consumption of the correctly estimated amount of bunkers and water. Similar constraints apply, of course, for a ship moving from a summer to a winter zone. The safety and security of life at sea, protection of the marine environment and over 90% of the world's trade depends on the professionalism and competence of seafarers. 1/17/2019 Presented by: Radcliffe Spence

Choice of Bunkering Ports During a voyage, bunkers and water are continually used. Sufficient bunkers and water must be carried for each leg of the journey, but this must be balanced with the need to maximize revenue-producing cargo. Overall weights that can be carried are limited by the need to respect legal load lines that depend on the location and season. There is no hard and fast rule about where bunkers should be replenished. It is in the shipowner’s interest to run each voyage as efficiently as possible, minimizing time and costs while maximizing revenues. 1/17/2019 Presented by: Radcliffe Spence

Choice of Bunkering Ports With sustained high bunker prices and the increasing attention on green shipping, how to choose the optimal bunkering ports for saving total operating costs and minimize fuel emissions are research issues arising in the liner shipping companies. Generally speaking, the bunkering port selection problem is solved by ship planning software, which can only work optimally when the ship arrivals can be forecasted rather accurately, but ignoring some unforeseen circumstances in actual operations. 1/17/2019 Presented by: Radcliffe Spence

Choice of Bunkering Ports There are no fixed rules for the bunkering port selection among several alternatives yet. This is addressed by benchmarking that evaluates the bunkering ports’ performance under the regular liner route to choose the optimal ones. Owing to bunkering port selection is typically a multi-criteria group decision problem, and in many practical situations, decision makers cannot easily express their judgments under an incomplete and uncertain information environment with exact and crisp values. 1/17/2019 Presented by: Radcliffe Spence

Factors affecting ports Load line restrictions Draft restrictions in ports Price of bunkers Freight rates Types of cargo Port charges Delays/productivity(loading rate) 1/17/2019 Presented by: Radcliffe Spence

Determining factors In general, reserves are essential for a long voyage, and a bunker call should: avoid deviation from the route avoid high costs (fuel and port charges) take no more than half a day. Calculations must be made to decide when and where to bunker. 1/17/2019 Presented by: Radcliffe Spence