I2 – Disconnection requested by the Retailer and performed by an Accredited Entity in Relation to Non-Household Customer non payment Retailer Wholesaler.

Slides:



Advertisements
Similar presentations
REQ Enrollment in Demand Response Programs Process Flow Engineering Firm Retail Customer Demand Response Service Provider (DRSP) Distribution Company.
Advertisements

REQ.XX.4.1 Enrollment in Demand Response Programs Process Flow Engineering Firm Retail Customer Aggregator Distribution Company 1 Aggregator identifies.
REQ Enrollment in Demand Response Programs Process Flow Engineering Firm Retail Customer Demand Response Service Provider (DRSP) Distribution Company.
Summary of Customer Service Rules for Low-Income Electricity Customers Paul Gasparatto Policy Advisor.
Car and Van Discount Scheme Industry Seminar: 27 April 2009.
TO BECOME A DEA. EDI qualification requirements The portfolio to the qualification A portfolio of evidence that you are competent to carry out the role.
Invoices On – Line Registration Instructions for Vendors.
Supplier Product & Process Change Request. Flow Diagram: Supplier Product & Process Changes Requests Change notification form completed by supplier then.
PROQUIS Audit and Assessment tool Bill Best
Customer Service Standards
PCT-SAFE and e-Services developments Webinar September 7/
Qualifications Update Charlie O’Donnell CfE Liaison Manager Quality Assurance.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Miscellaneous Service Charges 1 Water & Wastewater Reference Manual.
Villanova Club Sports FIRST RESPONDER TRAINING. What are the duties of a First Responder?  Maintain current American Red Cross CPR/AED and First Aid.
Pupil Voice Instructions for Using the Online Pupil Attitude Questionnaire 2008/09 Produced by the Assessment Support/Professional Support Teams Tel: (01772)
CER Update Industry Governance Group 21 st September 2011.
Level 3 Commercial Energy Performance Certificates Next Steps after Training PRESENTED BY.
CES EXAMINATION PROCESS FLOW SEPTEMBER 14, 2011 Centralized Examination Station (CES)
Bistro Consider the activities of the staff of a bistro, including the chef, waiters and bar staff. List the activities of the staff, thinking about how.
WSNTG Annual Conference September 2007 Water Services National Training Group 11 th Annual Conference 6 th September 2007.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
PREPARING FOR A PHAB SITE VISIT 1 Susan Ramsey Pearls of Wisdom Consulting Lia Katz ASTHO (202)
ON BEHALF OF THE GIO Property Claims Management Coverable Risks Public Sector Risk Managers Association (PSRMA) - 27 June 2012 Trevor Brown – TMF Property.
SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL.
BSHS 382 Week 3 Learning Team Research Proposal Check this A+ tutorial guideline at 382-Week-3-Learning-Team-Research-Proposal.
ABBE Level 4 DipACEA. Air Conditioning Energy Assessors Inspections course Day 2. 19, Next Steps after Training PRESENTED BY Anthony Balaam
Lead and Copper Rule (LCR)
Responding to an Onsite Visit
WELCOME TO
Rand Water services Forum – Billing and Administration 14 September
Level 3 Air Conditioning Inspections for Buildings
PROCUREMENTS.
Teladoc Physician Training
Solar Farm Operational Procedures SWEDE 2017
Exception reporting Overview Guide V0.1.
MOT Testing Service Screenshots and Notes* AEDM
Assessment Support/Professional Support Teams
Fee and TRANSACTION LIMIT SCHEDULE FOR THE MONEY NETWORK® SERVICE
EigiOja.Com Restricted
HSCN- TACO Programme 26th April 2018.
Developing a Recall Plan for Meat and Poultry Products
Fee and TRANSACTION LIMIT SCHEDULE FOR THE MONEY NETWORK® SERVICE
Current Service Agreement Proposal Process
Harmonisation Working Group
Engaging Interset Support Contacting and Hours of Operation March 2017
Assessment Support/Professional Support Teams
Lynne McNaughton – Specialist II National Carbon Reduction Unit
Orange ASP Training Module
Museums in Leicestershire summary
Scan & Deliver Scan & Deliver is available to University card holders. You need to login using SSO to place a request.
Elaine Carr ScottishPower
Museums in Leicestershire
Summary: 27 Derbyshire museums in the Accreditation scheme in 2016/17
Museums in Nottinghamshire
UNC Modification Proposal 0172 National Grid Distribution
Contract Compliance Assessment Visit
Timeline for Modifications 501 and 501A
0564R -- Review of Annual Read Meter Reading requirements
Museums in Nottinghamshire summary
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Museums in Northamptonshire
Museums in Northamptonshire
Placing a Broadband Provide Order Version 1
New Student Orientation
Quality Housing for all
Client Process Pack.
Fed-IP Assessor Training: Module 3 Assessing an application for Fed-IP
Presentation transcript:

I2 – Disconnection requested by the Retailer and performed by an Accredited Entity in Relation to Non-Household Customer non payment Retailer Wholesaler MO N 1 Requirement for Accredited Entity to visit property for disconnection for non payment Instruct Accredited Entity to visit proposed property to survey site Is advance notice req’d or /valve ops required? Disconnection can proceed? Instruct Accredited Entity to proceed with Disconnection 2 10 Inform Wholesaler disconnection has taken place 4 9 Issue Disconnection Information Notice and site details 8 Y 3 Y N Call within 2 hours follow with form within 1 BD Call and Form I/01 SWIM At least 2 BD advanced notice Form I/01 Notified 5 Assess notification Return to Retailer with any stipulations noted Notified 6 7 End 11 Within 2 BD Notifies MO 12

Internal systems updated I9 – Reconnection requested by the Retailer and performed by an Accredited Entity (within 14 days) Retailer Wholesaler MO 1 Instruct Accredited Entity to arrange reconnection in line with Wholesalers Accreditation Scheme * In the unlikely event that a non payment disconnection has resulted in a supply off for longer than 14 days, the sampling process for customer requested reconnections should be followed as stipulated in the Wholesalers Accreditation Scheme. The same is said for if longer than 30 days, a Water Regs visit should be raised 1 Within 1 BD of reconnection being made Form I/04 SWIM Notified Internal systems updated 2 3 End Within 1 BD Notifies MO 4 6

I9b – Reconnection requested by the Retailer and performed by an Accredited Entity (after 14/30 days) Retailer Wholesaler Water Regs Team 1 Notification of request to reconnect property 10 Notification received that reconnection can proceed 1 Follow I9A 11 End Form I/04 Form I/04 SWIM Notified Notificatiom reviewed 3 4 Request for sample/Water Regs check raised SWIM Notified 2 9 Email to WMU Email to Water Regs Y 7 Further work required? Request reviewed 5 Plan and Visit arranged 6 Inspection completed Report Water Regs passed 8a N 8