Prepared for Municipal Officials in the Prairie Provinces March 2018

Slides:



Advertisements
Similar presentations
Special Inspections
Advertisements

IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Transport Canada Submission to the Nunavut Impact Review Board Respecting the Meadowbank Gold Project March 2006.
Building Code II ARC313. Building Code sets out technical requirements for the construction, renovation and demolition of buildings sets out technical.
Green Renovator Task Group Report Highlights for the Canadian Renovators’ Council.
Welcome to Energy efficiency for gas-fired and oil-fired domestic heating and hot water systems Session A: Course introduction.
Helmets – Standards, Certification and Regulations Ian Brodie, MSc. Project Manager September 19, 2006 Smart Risk Learning Series.
Sidney Manning Chief Administrator/Inspector Plumbing & Gas
ECONOMIC STATISTICS AND NATIONAL ACCOUNT IN ETHIOPIA By Sehin Merawi Central Statistical Agency of Ethiopia.
1 SEE YOU IN COURT Implications of PEO’s Building Code Legal Challenge Victory Bruce G. Matthews, P.Eng. Deputy Registrar, Regulatory Compliance Professional.
Essentials of Local Land Use Planning and Regulation.
Establish Verification Procedures (Task 11 / Principle 6)
6/23/2015 Risk-Informed Process and Tools for Permitting Hydrogen Fueling Stations Jeffrey LaChance 1, Andrei Tchouvelev 2, and Jim Ohi 3 1 Sandia National.
Modular Home Study By Sterling M. Adames. Modular vs. Manufactured Homes Modular Homes  Modular homes are residences constructed entirely in factories.
Geo-referenced data and DLI aggregate data sources Chuck Humphrey University of Alberta ACCOLEDS 2007.
Codex Guidelines for the Application of HACCP
XML, DITA and Content Repurposing By France Baril.
IN FOCUS LEGAL AND OTHER REQUIREMENTS RECYCLER QUALIFICATION OFFICE MARCH 2014.
CSA Standard B483 An Overview Scott Macdonald Envirogard Products Limited.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
Title of Training Module Design Plan
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Standards: Paving the way for innovation Glenn Tubrett Program Manager, Energy and Utilities Canadian Standards Association.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
SAFE 543 Construction Safety Week One Chat Session Review of Syllabus Review of Case Studies Format for Preplanning Guide Chat Session Guidelines Case.
1. 2 Background Bill C-3, International Bridges and Tunnels Act: –introduced in the House of Commons on April 24, 2006 –received Royal Assent on February.
Understanding SharePoint Content Module 1. Overview  Defining Content in SharePoint  Defining Management of SharePoint Content.
Energy Efficiency Engineering Ltd. Jozef Jachniak, P.Eng. GAS FIRED EQUIPMENT FIELD APPROVALS.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Afghanistan’s Urban Development Program Pre-Fabricated & Modular Building Solutions Dubai, United Arab Emirates February 7, 2016.
Introducing Novell ® Identity Manager 4 Insert Presenter's Name (16pt) Insert Presenter's Title (14pt) Insert Company/ (14pt)
Position Statement on Sealed Truss Placement Diagrams for the State of California (including Los Angeles) Overview.
Williams-Sterling, Inc. Proprietary Information & Highly Competition Sensitive Data When Completed Modular Housing Solutions Go from Interim Housing to.
VisitAble Housing in Ontario: A Municipal Planner’s Perspective March 23, 2016 Tanja Curic, MCIP, RPP Policy Planner City of Waterloo.
Building Capacity on Protected Areas Law & Governance Module 11 Marine Protected Areas - Special Legal Considerations for National Frameworks Exercise.
Geo-referenced data and DLI aggregate data sources
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Canadian Construction Materials Center (CCMC) CCMC Evaluation Process Serving Building Officials across Canada Ontario Building Officials Association.
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
New Comprehensive Zoning By-law December 12, 2016.
Step Code and Net Zero Energy Housing Presented by Bob Deeks| President RDC Fine Homes For Renewable Cities Energy Step Code Session| May 18, 2017.
VisitAble Housing From Concept to Reality: Policy Change Directions
Grid Code Development Forum – 6 September 2017
THE IECEx SCHEME IN CANADA Canadian Regulations and Access to the Market Presented by : Dave Adams, Technical Advisor, CSA International Welcome to the.
R2000 History R2000 is a series of technical requirements for new home performance and construction. Began in the 1970s to develop comfortable homes.
CJ 130 Competitive Success/snaptutorial.com
CJ 130Competitive Success/tutorialrank.com
CJ 130 Education for Service-- snaptutorial.com
CJ 130 Education for Service-- tutorialrank.com. CJ 130 Unit 2 Assignment Introduction to Corrections For more course tutorials visit
CJ 130 Teaching Effectively-- snaptutorial.com
Module 6: Confirming Compliance
Prepared for Municipal Officials in the Prairie Provinces March 2018
Building my on-line store
Module 5: Facilitating Compliance with Prefabrication
Prepared for Municipal Officials in the Prairie Provinces March 2018
Module 3: The Factory-Constructed Building Industry
Module 4: Technical Requirements for Prefabricated Buildings – Alberta
CABINET X-RAY MACHINE OPERATOR RADIATION SAFETY TRAINING COURSE
USNRC IRRS TRAINING Lecture18
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
Module 7: Challenges – Saskatchewan
Module 2: Factory-Constructed Buildings – Then and Now
Prepared for Municipal Officials in the Prairie Provinces March 2018
Building Permit Process
Module 7: Challenges – Manitoba
PROGRAM The Institute for Timber Construction (ITC-SA)
Taking it home: An Action plan
Council Orientation October 24, 2017
CSA Medical gas Standard
CS 514 Class presentation template [Replace it with the title of your project] Xiaowei Yang.
Presentation transcript:

Prepared for Municipal Officials in the Prairie Provinces March 2018 Factory-Constructed Buildings in Canada – Evolution, Regulatory Requirements and Confirmation of Compliance Prepared for Municipal Officials in the Prairie Provinces March 2018

Factory-Constructed Buildings in Canada Purpose ─ To provide local government officials in the Prairie Provinces with current information on: today’s factory-constructed buildings & the Canadian industry regulatory requirements that apply to factory-constructed buildings in the Prairie Provinces technical and administrative confirming compliance issues and solutions Module 0 – Purpose The purpose of this presentation material is to provide municipal officials in the Prairie Provinces with information on: factory-constructed buildings in Canada today building regulatory requirements that apply to factory-constructed buildings in the Prairie Provinces, both technical and administrative and current issues and solutions. 0 -

Factory-Constructed Buildings in Canada – Issues in the Prairie Provinces CSA Z240.10.1 “Site Preparation, Foundation and installation of Buildings” acceptance of foundations and anchorage that comply with the standard see Module 4 Permitting, inspection and acceptance what is needed for acceptance see Module 6 Municipal Bylaws see Module 7 Module 0 – Issues in the Prairie Provinces There are three main issues that face the factory-constructed building industry in the Prairies today: the acceptance of foundations and anchorage that comply with CSA Z240.10.1 which provides requirements for surface foundations and is referenced in the Alberta Building Code permitting, inspection and acceptance of homes constructed in accordance with the Alberta Building Code and discriminatory bylaws. Foundations and Anchorage are discussed in Module 4 Permitting, inspection and acceptance of prefabricated homes are discussed in Module 6. Municipal bylaws are discussed in Module 7 along with some other challenges that are faced across the country. 0 -

Modules Who We Are – CHBA-MOD and MHAPP Prefabricated Buildings Then and Now The Industry Module 0 – Outline – Slide 1 of 3 The presentation material is provided in eight modules. The first three modules provide an introduction to - the CHBA’s Modular Construction Council, and - the Modular Housing Association Prairie Provinces followed by an overview of factory building in Canada and some information on the industry 0 -

Modules Who We Are – CHBA-MOD and MHAPP Prefabricated Buildings Then and Now The Industry Applicable Technical Requirements Facilitating Compliance Confirming Compliance Module 0 – Outline – Slide 2 of 3 Modules 4 to 6 provide the meat of the material. They describe how prefabricated buildings fit into the Prairie Provinces’ regulatory context in terms of - the technical requirements that apply - how prefabrication facilitates compliance - and how compliance is confirmed. For the technical requirements, separate modules are provided for each province. 0 -

Modules Who We Are – CHBA-MOD and MHAPP Prefabricated Buildings Then and Now The Industry Applicable Technical Requirements Facilitating Compliance Confirming Compliance Challenges Take-Aways Module 0 – Outline – Slide 3 of 3 Module 7 discusses challenges that aren’t covered in the preceding modules. Module 8 provides a summary of the most important points. 0 -