Document No: GSC-18_006 Source: Invited Speaker, ITU-R WP5D / ARIB

Slides:



Advertisements
Similar presentations
DETAILED WORKING MECHANISM ON DEVELOPING ITU-R RECS. M.1457 / M.2012 (IMT RADIO INTERFACE RECOMMENDATIONS) Yoshinori ISHIKAWA, Hitachi, Ltd. GSC-18 Meeting,
Advertisements

GLOBAL ICT STANDARDISATION FORUM FOR INDIA (GISFI) Prof. Dr. Ramjee Prasad, CTiF, Aalborg University Fellow IEEE, FIET, FIETE, FWWRF - Founding Chairman,
CURRENT STANDARDIZATION ACTIVITIES – ONEM2M GSC-18 Meeting, July 2014, Sophia Antipolis, France Document No: GSC(14)18_012 Source: ETSI Contact:
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
Fostering worldwide interoperabilityGeneva, July 2009 IMT Standardization activities Colin Langtry, Radiocommunication Bureau, ITU Global Standards.
DOCUMENT #:GSC15-PLEN-14 FOR:Presentation SOURCE:ATIS AGENDA ITEM:PLEN 6.1 CONTACT(S):Asok Chatterjee
1 ITU-R Liaison Group Report - Session #69 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0087r1.
DOCUMENT #:GSC15-PLEN-13r1 FOR:Presentation SOURCE:ARIB AGENDA ITEM:OPENING PLEN 6.1 CONTACT(S):Kohei Satoh Update ARIB.
DOCUMENT #:GSC15-PLEN-69; GSC15-GRSC8-10 FOR:Presentation SOURCE:ARIB AGEND ITEM:OPENING PLEN 12.2; GRSC 7.1 CONTACT(S):Kohei Satoh
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04r1 Source:
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /00xx Date.
IMT activities in ITU-R DOCUMENT #:GSC13-PLEN-13 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:Plenary 6.1 CONTACT(S):Kevin Hughes Submission Date: July 1,
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
1 ITU-R Liaison Group Report - Session #67 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) DOCUMENT #:GSC13-Plenary-60 FOR:Presentation SOURCE:Kohei.
1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
WP5D Meeting Results Seoul. 2 IMT-Advanced Summary  IMT.EVAL Completed  Describes the methodology for evaluating IMT Advanced  Contained in.
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
Doc.: IEEE /0004r0 Submission Jan 2016 Andrew Myles, CiscoSlide 1 Next steps for IEEE as an IMT-2020 technology? 18 Jan 2015 Authors: NameCompanyPhone .
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Jeju, 13 – 16 May 2013Standards for Shared ICT Stephen Hayes Director of North American Standards Ericsson ATIS Activities on IMT Standards Document No:
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Jeju, 13 – 16 May 2013Standards for Shared ICT TTA activities on IMT Standardization LEE HyeonWoo Chair of TTA PG701 Document No: GSC17-PLEN-21r2 Source:
HEADING FOR SLIDE Sub Heading
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
GSC IMT Task Force Report
ITU-R WP5D Preliminary Update – February 2009 Geneva Switzerland
Continuing Cooperation on IMT Standardization
ITU-R Liaison Group Report - Session #68 Opening Plenary
TTA activities on IMT-Advanced Standardization
IMT-2020 Contribution Content
Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY
ATIS Activities on IMT Standards
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
GSC IMT Task Force Report
Update ARIB Activities on IMT Standardization
Update ARIB Activities on IMT Standardization
IEEE 802 IMT-Advanced Technology Proposal Process
Admin Working Group Report to Closing Plenary
Current standardization activities – oneM2m
Update ARIB Activities on IMT Standardization
GLOBAL ict standardisation forum for india (Gisfi)
IEEE IMT-Advanced Review Process
GSC IMT Task Force Report
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE 802 IMT-Advanced Technology Proposal Process
Update of ARIB Activities on IMT Standardization
ITU-R Liaison Group Report - Session #65 Opening Plenary
GSC IMT Task Force Report
Status report from ITU-R WP 5A on ITS activities
GSC IMT Task Force Report
TTA activities on IMT Standardization
IEEE 802 IMT-Advanced Technology Proposal Process
IEEE IMT-Advanced Review Process
Report of Opening Plenary
ITU-R Liaison Group Report - Session #65 Opening Plenary
Activities of ARIB on IMT Standards
Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY
GSC IMT Task Force Report
TTA activities on IMT-Advanced Standardization
Paths to 5G Date: Authors: Name Affiliations Address Phone
Continuing Cooperation on IMT Standardization
Continuing Cooperation on IMT Standardization
TTA Activities on IMT-Advanced standardization
Paths to 5G Date: Authors: Name Affiliations Address Phone
IEEE 802 IMT-Advanced Technology Proposal Process
Presentation transcript:

Document No: GSC-18_006 Source: Invited Speaker, ITU-R WP5D / ARIB Contact: Yoshinori ISHIKAWA Agenda Item: 5 .1 DETAILED WORKING MECHANISM ON DEVELOPING ITU-R RECS. M.1457 / M.2012 (IMT RADIO INTERFACE RECOMMENDATIONS) Yoshinori ISHIKAWA, Hitachi, Ltd. GSC-18 Meeting, 22-23 July 2014, Sophia Antipolis, France

Current Structure of Recs. M.1247 /M.2012 Recs. M.1457 / M.2012 contains hyperlinks of SDOs’ standards as: 1.2.1.1.2 TS 36.211 Evolved Universal Terrestrial Radio Access (E-UTRA); Physical channels and modulation This document describes the physical channels and modulation for E-UTRA.  Transposing organization Document number Version Issued date Location ARIB ARIB STD-T104-36.211 10.2.0 16 September 2011 http://www.arib.or.jp/IMT-Advanced/LTE-Advanced/ARIB-STD/A36211-a20.pdf ATIS ATIS.3GPP.36.211V1020-2011 10.2.0 26 July 2011 https://www.atis.org/docstore/default.aspx CCSA CCSA-TSD-LTE-36.211 0.0.0 31 August 2011 http://www.ccsa.org.cn/ITU_spec/ITU‑R/M.IMT.RSPEC/M.IMT.RSPEC-0/LTE/ ETSI ETSI TS 136 211 10.2.0 28 June 2011 http://pda.etsi.org/pda/home.asp?wkr=RTS/TSGR-0136211va20 TTA TTAT.3G-36.211(R10-10.2.0) 10.2.0 26 August 2011 http://www.tta.or.kr/data/ttasDown.jsp?where=14688&pk_num=TTAT.3G-36.211(R10-10.2.0) TTC Not applicable Not applicable GSC-18, 22-23 July 2014, Sophia Antipolis

GSC-18, 22-23 July 2014, Sophia Antipolis Detailed mechanism Key concepts of this mechanism are: Key concepts of this mechanism are: GCS (Global Core Specification) : - “GCS” is the set of specifications that defines a single RIT, ans set of RIT, or a RIT within an SRIT GCS Proponent (Represent an industry, organization, etc.) : - Single entity or collective entity that provides a GCS as included in Recommendations - have legal authority to grant to ITU the legal usage rights Transposing Organizations : - Authorized by the GCS Proponents to produce transposed standards with legal authority to grant to ITU the legal usage rights GSC-18, 22-23 July 2014, Sophia Antipolis

Typical procedure for updating recommendation ITU-R Meeting Y-1 GCS Proponent / Transposing Organizations (T.O) Send liaison to GCS Proponents announcing update schedule Request for providing update information Meeting Y Answer whether they are willing to update Radio Interface Meeting Y+1 Review the updated RITs and capabilities Assess the evaluation results of updated RITs Revise Rec. based on GCS Proponents proposal Request T.O to provides hyperlinks Inform abstracts of updated RIT Meeting Y+2A / 2B Provides Updated GCS Proposed texts of Rec. T.O. List Self-evaluation Transpose GCS to its Standards Provides hyperlinks Finalize Recommendation with T.O’s hyperlink

Typical procedure for updating recommendation GCS Proponents & Transposing Organizations of current IMT-Advanced RITs LTE-Advanced GCS Proponent: 3GPP OPs (ARIB, ATIS, CCSA, ETSI, TTA & TTC) Transposing Organizations: ARIB, ATIS, CCSA, ETSI, TTA & TTC WirelessMAN-Advanced IEEE ARIB, IEEE, ITRI, TTA & WiMAX Forum GSC-18, 22-23 July 2014, Sophia Antipolis

Merits of this Mechanism Results from above mechanisms: Typically 5 ITU-R WP 5D meetings are required for updating Recommendation. (2 year cycles) It is a almost same duration for GCS Proponents to update their GCS Smooth introduction to the market -> GCSs are quickly transposed into National / Regional Standards and readers of the recommendation can easily find those Similar Recommendation structure is also employed in Rec. ITU-R M.1801 (BWA Radio Interface Recommendation) Recs. ITU-T Q.1741/1742 (IMT-2000 Core NW Recommendations) GSC-18, 22-23 July 2014, Sophia Antipolis

GSC-18, 22-23 July 2014, Sophia Antipolis Supplementary Slides GSC-18, 22-23 July 2014, Sophia Antipolis

GSC-18, 22-23 July 2014, Sophia Antipolis SUPPLEMENTARY SLIDES Deliverables of mentioned working mechanism on Rec. M.2012 ½ Vision /Framework of IMT : Rec. ITU-R M.1645 Requirements - Spectrum requirements are based on Rec. ITU-R M.1036 - Service requirements are based on Rec. ITU-R M.1822 - Technology requirements are described in Rep. ITU-R M.2134 (e.g. Cell Spectral efficiency, VoIP Capacity, Latency, Mobility, etc.) Evaluation methods : Rep. ITU-R M.2135-1 Submission templates : Rep. ITU-R M.2133 GSC-18, 22-23 July 2014, Sophia Antipolis

GSC-18, 22-23 July 2014, Sophia Antipolis SUPPLEMENTARY SLIDES Deliverables of mentioned working mechanism on Rec. M.2012 2/2 Proposal from EOs for IMT-Advanced RIT : IMT-ADV/4 thru 9 (http://www.itu.int/md/R07-IMT.ADV-C-00xx/en xx : 4 thru 9) Individual Evaluation reports : IMT-ADV/10 thru 23 (http://www.itu.int/md/R07-IMT.ADV-C-00xx/en xx : 10 thru 23) Evaluation results and Results of Consensus Building : Rep. ITU-R M.2198 Updating procedure and example schedule : IMT-ADV/25 (Procedures) and 26 /28 (Schedules) (http://www.itu.int/md/R07-IMT.ADV-C-00xx/en xx : 25, 26, 28) GSC-18, 22-23 July 2014, Sophia Antipolis