Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Week 13: R. Assmann, J. Wenninger
Friday Access in shadow of SPS interventions (RF, extraction septa power supply) Lead into problem on the cooling of the extraction septa in SPS Both beams.
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Saturday 24 March 2012.
Friday 15th June 01:11 Injection.
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
LHC Morning Meeting - G. Arduini
Tue :25 Beams dumped due to RF vacuum interlock
Thursday morning – optics correction
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Monday – recovery from MKI flashover
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary week 30 Week 30 R. Bailey & J. Wenninger
Summary of Week 13 G. Arduini, B. Holzer
Mike Lamont, Jorg Wenninger
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 36 plan Todo’s: And also: 12+b injection.
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday February 28th 8h00: Injection
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Summary for LPC (March 7th, Ralph Assmann)
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting

Wednesday 09 March Beta* K-modulation scans have been performed with different delta K. The automatic codes gave too large error bars for using obvious bad points. We picked values an error bars with human algorithms. Detailed analysis will come later. K-mod AC-dipole B2H 1.58 10% 1.40      8% B1H 1.51 16%  1.53 5% B2V 1.56 8% 1.62 8% B1V 1.48 9%   1.59 6% B2H 1.48 10% 1.52 10% B1H 1.5 18% 1.50 3% B2V 1.51 8% 1.51 10% B1V 1.50 9% 1.40 5%. IR1 IR5 1/17/2019 LHC 8:30 meeting

Wednesday 09 March 09:30: Access for LBDS, BI, RF… 10:30: Collimator ramp test (dry) 13:00: extra access for water cooled cable on RB81. 1/17/2019 LHC 8:30 meeting

Wednesday 09 March afternoon BETS: Following access for TSU an energy scan has been done for B1 as the HV PS had been exchanged some days ago for MKD generator B1. The XPOC references have been updated to re-centre the tolerances for the 100% point (was changed by 0.5%, which is half the XPOC2 margin). LBDS re-armed and checked. MKI energy tracking. LHC energy trimmed below and above the BETS injection energy threshold (0.96 GeV, 0.2 %, 1.6 Amps), trims of 1 and 2 A. MKI pulse was inhibited by the BETS only above threshold for both beams. TOTEM interlock tests in the shadow. 1/17/2019 LHC 8:30 meeting

Wednesday 09 March PM 18:00: access for water problem on PC for Q4.L1. 20:30: checking LBDS arming with inject-dump. No problems were observed. 21:30: ramp/squeeze/collide 2 probe bunches. Ramp – no problem. Incorporated Q/orbit on flat top back into ramp & forward into squeeze. Squeeze – tune almost perfectly flat, but still some orbit excursions between matched points (from earlier incorporations?). Collide – technically ok, but Lumi seen only in IR1. Orbit interlock settings prepared in SIS for collisions (also TOTEM & ALFA). DIP problems with ALICE/LHCb lumi info (data structure??). 00:20: dump on RQ5.LR3 off – MPS test of FMCM – OK. 1/17/2019 LHC 8:30 meeting

Tune in squeeze 1/17/2019 LHC 8:30 meeting

Aperture BLM response collimator/SC region at Q9L7 Confirm factor 2 to 3 higher BLM response at TCP. Local triplet aperture with bumps – preliminary: IR1 V B1: 16 sigmas (was 16 in prev. meas.) IR1 V B2: 14 sigmas (was 15 in prev. meas.) IR5 H B1: 13.5 sigmas (was 15 in prev. meas.) IR5 H B2: 13 sigmas (was 17 in prev. meas.) H plane… 1/17/2019 LHC 8:30 meeting

Today -> 17:00 : From ~17:00: Collimator setup at 3.5 TeV squeezed. Multi-bunch injection (8 b 75 ns) Dump protection validation… Multi-bunch injection (24 b 75 ns) From ~17:00: Collimator setup at 3.5 TeV squeezed. 1/17/2019 LHC 8:30 meeting