Loudenslager Elementary School Pointing and Brick Repair.

Slides:



Advertisements
Similar presentations
Tam Valley School Modernization - Phase 1 Summer 2011.
Advertisements

Planning an athletic facility project for Middle School Kids! Ms. Pauleys 8 th Grade Math – CTMS April 18, 2013.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Capital Project Presentation As approved through formal resolution by the RCS Board Of Education on March 11,2015. This new presentation outlines the $750,000.
Bond Election Presentation 2014 Webb Consolidated ISD.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
HADDON TOWNSHIP SCHOOLS ELEVATORADDITION FENCE REPLACEMENT REPLACEMENT REPAIR AND RECOAT ASPHALT PLAGROUND SURFACE REPLACE CONCRETE CURBING AROUND THE.
ELEMENTARY PLAYGROUND EQUIPMENT THOUGHTS and IDEAS.
Rebuild Stafford High School Update- October 2014.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
13 SCHOOL SAFETY CONCERNS AND IMPROVEMENT TRCS Rensizzle Architecture 2013 By: Jonathan, Melanie, Khalil, Abd-Elrahman,Ram Report Investigation Date: October.
Math Group English2 First Period By: Amber E. Johnathan S. Austin H.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
2012 Planned Facilities Reconstruction Project. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Development & Director Maintenance VP of Development works closely with both maintenance staff representatives and the General Manager. We try to meet.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
From our window 7. Our gymnasium has 4 floors too. The first floor is a cafeteria, the second floor is an art room, the third floor is a table tennis.
Billy Aubut Family Met wife in High School 2 year old son, Wilson.
GC-4 April 2011 Bond Issue  Questions And Answers… 1.
…….Another Man’s Treasure Vance Drive Apartments Transitional Housing.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Sinking Fund Millage Renewal Election- May 7, 2013.
Getting to the Imac Lab from P lot By: Kyle Jones.
DEDHAM PUBLIC SCHOOLS FY 2008 Approved FY 2009 Approved FY 2010 Approved Education Technology Program 275, Roof Replacement - High School750,
CTRA Green Features. 1. Green Roof 2. Hot Water Solar Heaters These are a type of solar panel. It is called evacuated tube collectors and they heat our.
Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Inspection photo requirements Following this procedure will ensure that you get paid for the work completed. All rights to this document are reserved by.
SUMMER 2015 DEFERRED MAINTENANCE
Learning, Health, and Safety Capital Project Alternates and Change Order
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Community Engagement Meeting Taylor Early Childhood September 2, 2015.
Technology & Curriculum Building & Grounds January 8, 2015.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Facilities Focus Group
White Pigeon Community Schools
A HOUSE.
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Boiler Room Atmospheric Boiler Power Boiler.
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Building Committee April 20th, 2016.
Capital Improvements Presentation
Dr. Joseph Meloche Superintendent of Schools Mrs
Troy School District 2013 Bond Program – Series 1 Construction Update September 2016 Barton Malow | TMP.
Fort Cherry School District
UNION GROVE ELEMENTARY REFERENDUM
Computer Science in the Early Years
Progress Report 11/10/11.
Improvements for 2016 & 2017 Todd Harris Maintenance Manager
Update to Board of Trustees: November 9 FAC Meeting
Building & Property Committee
Troy School District Bond Program – Series 1 Construction Update
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Troy School District 2013 Bond Program – Series 1 Construction Update June 2016 Barton Malow | TMP.
Blue Ribbon Committee Summary Report
Troy School District Bond Program – Series 1 Construction Update
A. Write the correct numbers !
Presentation transcript:

Loudenslager Elementary School Pointing and Brick Repair

Loudenslager Elementary School Brick work needs immediate repair

Loudenslager Elementary School Chimney Pointing

Loudenslager Elementary School Front Stairs

Loudenslager Elementary School Roof 1926 and 1973

Loudenslager Elementary School Lavatories

Loudenslager Elementary School Lavatories

Loudenslager Elementary School Surface Water Drainage

Billingsport Early Childhood Center Library Entrance Ramps

Billingsport Early Childhood Center Heater Valves

Billingsport Early Childhood Center Basement Window Wells

Paulsboro High School Brick Repair and Restoration

Paulsboro High School Roof -1931,1965 and Gym

Paulsboro High School Roof -1931,1965 and Gym

REPLACE BOILERS AT PAULSBORO HIGH SCHOOL

Paulsboro High School Hot Water Heater

Paulsboro High School Drainage Improvements The Paulsboro High School parking lot has the same drainage system as the Loudenslager Elementary School playground. That is, drainage is provided by very old French pits. During heavy rains and snow melt-off, water can enter the building at the entrances to the gymnasium and locker rooms. This could damage the hardwood gymnasium floor which would then require expensive repairs.