CAP089/090/091 Working Group Report

Slides:



Advertisements
Similar presentations
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Advertisements

Review of industry code governance 26 March 2010.
144A – Calculation of Value at Risk (VAR) Simon Trivella – 24 th May 2007 Distribution Workstream.
Summary of Customer Service Rules for Low-Income Electricity Customers Paul Gasparatto Policy Advisor.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Review Group 0221: User Commitment Best Practise guidelines for Gas and Electricity Network Operators Credit Cover (2005)
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Code Administrator's Working Group Duncan Burt CUSC and Grid Code.
Review Group 0221 Session 4: 28 th October Introduction  Agenda item 4.1 Focus Session: “Who/What capacity holders should be captured by these.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Overview of Balancing & Settlement Code Change Process By Gareth Evans on Behalf of Gazprom Marketing & Trading –Retail.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Environmental Standing Group. 2 Background  Ofgem issued an open letter on 15 th April 2008 to consider issues associated with carbon assessment for.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
Welcome Single Line Flexibilities and Fees Presented to: ALP / Training Organisations.
Www2.nationalgrid.com/bsuos An Introduction to Balancing Services Use of System Charging (BSUOS)
CAP169 BSSG 12/03/09. 2 Today  Recap on developments to date  Discuss and agree Terms of Reference for the group  Begin to work through proposal, capturing:
Low-Income Energy Assistance Program (LEAP) Lenore Dougan, Policy Advisor Regulatory Policy Ontario Energy Board Presentation to the Rental Housing Advisory.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Credit Scoring and Scorecard Lending
Stock Market Analysis and Personal Finance
Bond fundamentals Chapter 17.
Accounting and Reporting on an Accrual Accounting Basis
Loss of Mains Protection on DG Rectification Programme
Gary Nower – Wilfrid Laurier University Edward Ng – EY
The introduction of SCOPIC ( The Special Compensation P&I Clause)
CUSC Panel – 19th July 2016 Binoy dharsi
Credit Arrangements – Independent Assessments
Chapter 2 Pricing of Bonds
Capacity Conversion – 616s
Code Governance Review UNC Modification Proposals
NewGen ISS Program Update
An Introduction to Balancing Services Use of System Charging (BSUOS)
Holistic view of Charging Modifications – In flight 11th June 2018
CAP104 Amendment to System to Generator Inter-trip Related Terms concurrently defined in the Grid Code and the CUSC. Emma Carr 25th August 2005.
Social Security Auxiliary Benefits
Pension Retirement Calculation Impacts
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Authority decision on CAP086 –Implementation Dates
Transmission Workgroup – 1st December 2011
effects of changing conditions
CAP105 – National Grid’s name change
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
TSC Modifications Panel Meeting
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Joint Office Presentation for Modification 0678
Mike Mumper & Brian Kick Good afternoon
Credit Modification Proposals Update
Long Term Non Firm Capacity Update
Further Credit Modification Proposals
CUSC “Alternate” Proposal process
CUSC Amendment Panel Recommendation
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
Joint Office UNC Elections
Joint Office UNC Elections
Captured Carbon Renewable Energy Route to Market Consultancy Trading.
Joint Office UNC Elections
Xoserve Draft UIG Incentives Modifications 20 May 2019
South Dakota State Aid Pledge Program
PRODUCT CRITERIA COMMERCIAL BRIDGE FINANCE
Presentation transcript:

CAP089/090/091 Working Group Report Ben Graff Electricity Code Development Manager National Grid plc

Introduction Background Existing CUSC Provisions The Original Proposal - Step through the 5 main elements The Working Group Discussions The 5 Working Group Alternative Amendments Next Steps

Background CAP089 and CAP090 proposed by National Grid; amalgamated at June Panel CAP091 proposed by BizzEnergy; merged with CAP089/090 at July Panel CAP089/090/091 contains 5 distinct elements, discussed at the CAP088-091 Working Group over the last 3 months

Existing CUSC Provisions Currently no concept in the CUSC of a maximum unsecured Credit Limit Have to provide 29 days of BSUoS (Gens) Have to provide 32 days BSUoS + 10% TNUoS (Suppliers) But only if below BBB-

Original Proposal (5 Elements) 1. Maximum unsecured credit limit of 2% of RAV 2. Credit allowances for companies with an Approved Credit Rating (ACR) of BB- or above – 15% to 100% of maximum unsecured limit 3. Default credit allowance for companies without an ACR based on their Payment Record 4. Option for companies without an ACR to gain a credit allowance based on an Independent Credit Assessment 5 Replacement of 10% TNUoS Value at Risk (VAR) with an amount based on each User’s forecasting performance in the previous year

What Elements 1 and 2 Mean in Practice - Credit Rating Route to 2% RAV Unsecured Credit Up to 2% of RAV Securing 29 days BSUoS (Gens) 32 days BSUoS (Suppliers) 10% of TNUoS AAA = 100% (approx £102m) A = 40% (approx £41m) BBB+ = 20% (approx £20m) If credit Rating is below BB-, still need to secure the relevant BSUoS/TNUoS in full. - These proposal s not relevant BBB = 19% (approx £19m) BBB- = 18% (approx £18m) If above BB-, entitled to % of unsecured credit BB+ = 17% (approx £17m) Must secure rest via Parent Guarantee etc BB = 16% (approx £16m) BB- = 15% (approx £15m) Below BB- = 0

Element 3 - Default Credit Allowance for Companies without an Approved Credit Rating, based on their payment record Allowance based on payment record, climbing by 0.4% of maximum unsecured Credit Limit a year (escalating on an evenly graduated basis each month within year) Potential to achieve 2% of maximum unsecured Credit Limit after 5 years of perfect payment history

What Elements 1, 2 and 3 Mean in Practice - Credit Rating + Payment History Routes to 2% RAV Unsecured Credit Up to 2% of RAV Securing 29 days BSUoS (Gens) 32 days BSUoS (Suppliers) 10% of TNUoS AAA = 100% (approx £102m) A = 40% (approx £41m) BBB+ = 20% (approx £20m) If Credit Rating is below BB-, still need to secure the relevant BSUoS/TNUoS in full, but can progressively secure 0.4% a year through payment history. BBB = 19% (approx £19m) BBB- = 18% (approx £18m) If above BB-, entitled to % of unsecured credit BB+ = 17% (approx £17m) Must secure Credit not secured by Credit Rating/ Payment History via Parent Guarantee etc BB = 16% (approx £16m) BB- = 15% (approx £15m) 2% (approx £2m) – 5 years of perfect payments 0% – no on-time payments

Element 4 - Default Credit Allowance for Companies without an Approved Credit Rating, based on Independent Assessment Independent Assessment can be sought from a Panel of 3 Independent Credit Agencies, appointed by Network Operators Annual Assessment, paid for by National Grid Assessment results in a score of 0 – 10 Score of 10 entitles you to 20% of the maximum unsecured Credit Limit (i.e. the 2% of RAV) Score of 1 entitles you to 31/3% of the maximum unsecured Credit Limit

Element 4 – Credit Scoring Credit assessment Credit allowance as % of Approximate score maximum credit limit Allowance 10 20 £20.4m 9 19 £19.4m 8 18 £18.4m 7 17 £17.3m 6 16 £16.3m 5 15 £15.3m 4 13-1/3 £13.6m 3 10 £10.2m 2 6-2/3 £6.8m 1 3-1/3 £3.4m 0 0 £0.0m

What Elements 1, 2, 3 and 4 Mean in Practice Credit Rating Credit Score 100% (approx £102.0m) AAA/AA 40% (approx £40.8m) A 20% (approx £20.4m) BBB+ 10 19% (approx £19.3m) BBB 9 18% (approx £18.4m) BBB- 8 17% (approx £17.3m) BB+ 7 16% (approx £16.3m) BB 6 Unsecured Credit up to 2% of RAV 15% (approx £15.3m) BB- 5 131/3% (approx £13.6m) 4 10% (approx £10.2m) 3 62/3% (approx £6.8m) 2 31/3% (approx £3.4m) 1 2% (approx £2.0m) 5 years of perfect payments 1.6% (approx £1.6m) 4 years of perfect payments 1.2% (approx £1.2m) 3 years of perfect payments 0.8% (approx £0.8m) 2 years of perfect payments 0.4% (approx £0.4m) 1 year of perfect payments 0% (£0m) No on-time payments or Credit Score of 0

Element 5 - Replacement of 10% VAR for TNUoS Demand Reconciliation Charges with an amount of within year TNUoS Security based on each User’s forecasting performance in the previous year The Value at Risk (VAR) is referred to as the “Security Requirement” in the proposed CUSC legal text The Security Cover required is equal to the Security Requirement less the User’s Allowed Credit (which has been set by elements 1-4 of CAP089/090/091) Currently the VAR is: for Generators, 29 days’ of BSUoS Charges; or for Suppliers, 32 days’ of BSUoS Charges and 10% of TNUoS charges for TNUoS Reconciliation charges CAP089/090/091 proposes removing the cover for TNUoS Reconciliation charges, and replacing it with cover for within year TNUoS charges The cover for BSUoS would not be changed

Element 5 - Replacement of 10% VAR for TNUoS Demand Reconciliation Charges with an amount of within year TNUoS Security based on each User’s forecasting performance in the previous year (cont’d) (1) Within year TNUoS charges are determined by Users’ forecasts (2) These are Initially reconciled using settlement data in May y+1 (3) They are Finally reconciled using settlement data in June y+2 10% currently covers risk between (2) and (3) CAP089/090/091 proposes replacing this with within year cover to cover the risk between (1) and (2) The amount of cover required for each User would be based on their forecasting performance in the previous year

Working Group Discussions Calculation of RAV Frequency of Monitoring of Users Allowed Credit Cover Scoring 0 - 10 v 0 - 100 Who pays for assessments? Forecasting Performance Transitional Issues

Working Group Alternative Amendments Forecasting Performance +2.5% 0-100 User pays  WGAA4  VAR 0-10 NG pays Independent Assessment Payment Record ACR RAV WGAA5 WGAA3 WGAA2 WGAA1 Original Proposal

Views of Working Group Majority of Working Group believed CAP089/90/91 or one of the Alternatives better facilitated the Applicable Objectives All Working Group Members Agreed CAP089/90 ready to proceed to wider Consultation