API Summer Standardization Conference June 24th -28th, 2013
API SC-16 Task Group 2 Specification 16D Chair – Brian Wright Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment Chair – Brian Wright Co-Chair – Maynard Chance Currently on Second Edition published in June 2004 and reaffirmed June 2010. Document is currently under review. Target date for initial ballot is 4th Qtr. of 2013.
API SC-16 Task Group 2 Specification 16D Meetings held this year: Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment Meetings held this year: Winter Standards Conference Jan. 22nd 2013 June 5th Full Task Group Meeting Working group Meetings for Electrical/Software–Six meetings. Next full task group meeting is July 16th. Next Electrical/Software meeting is July 10th.
API SC-16 Task Group 2 Specification 16D Open Issues: Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment Open Issues: Finalize Accumulator FVR requirements based on worst well control scenario. Continue work on Electrical/Software sections. Incorporate SC18 welding gap analysis into document. Develop details required for secondary systems.