ECE135 Group 2 – Presentation 3

Slides:



Advertisements
Similar presentations
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 9 Vinh Nguyen April 14, 2005.
Advertisements

Presenter: Kenny Haulk
Gigabit Ethernet PMD Opto-Link, Inc. – Progress Summary Vinh Nguyen, Clifton Kerr, Andrew Meyerson, Bryan Justice April 21, 2005.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE445: The Design Review Raj Vinjamuri February 3, 2014.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Group 2 - Project Update April 1, 2004 Tyler Helble.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 1 Vinh Nguyen January 9, 2005.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
Presenter: Nassisa-Geda Techane. 2 This Week’s Highlights The optical link budget almost finished Website up on the ECE domainWebsite Yahoo Group set.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
ECE4006 Group 6 – Presentation 1 Division of Labor – Vikas Parekh – Group management, project schedule manager, background studies. Gautum Khanna – Analog.
ECE 4006B Fall, 2002, Group 3, Shahriar Khushrushahi Progress Report Period (September 5 – September 12, 2002) Cleared loose ends with respect to PDs and.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 5 Vinh Nguyen February 24, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Group 2 - Project Update Feb Tyler Helble.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
ECE Group 2 – Presentation 8
Opto-Link, Inc. – Status Report 8 Clif Kerr March 31, 2005
ECE 135 – BtrLaytDanNvr Presentation 7
Optical Gigabit Ethernet
Kevin Parker with Bryan Chavez & Pat Cleary February 24th, 2005
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
ECE 135 – Group 3 Presentation 1-2
Gigabit Ethernet Design ECE 4006C – Spring 2003
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.
ECE 4006 Group 6 – Presentation 8
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Project GabE ECE 135 – Spring 2005
Capstone Design Update
ECE 135 – VCSEL Kings Presentation 5
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
GIGABIT ETHERNET DESIGN ECE Spring 2004
Task List Group management plan Background studies
Gigabit Ethernet Design ECE – Spring 2004
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
Project GabE ECE 135 – Spring 2005 Week 9
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

ECE135 Group 2 – Presentation 3 Gigabit Ethernet PMD ECE135 Group 2 – Presentation 3 Bryan Justice February 10, 2005

Gigabit Ethernet: Progress Summary Completed Tasks Next Week’s Tasks Updated Gantt chart Reviewed group responsibilities Reviewed IEEE 802.3z Standard regarding the PMD module Selected our VCSELs Researched and selected our ROSAs Preliminary optical link budget Placing orders by Feb. 11 Complete optical link budget Build practice board Revise Gantt chart Start working on schematic Thinking about board layout and software

Group Responsibilities Andrew Meyerson – Administration, ordering, soldering Clifton Kerr – Layout, design, testing Vinh Nguyen – Webpage, report writing Bryan Justice – Optical link budget, design, testing, report writing

Gantt Chart

IEEE 802.3z PMD Research We will be building a Physical Medium Dependent (PMD) sublayer board PMD should conform to the IEEE 802.3z specifications for type 1000BASE-SX (Short Wavelength Laser)

802.3z Standard PMD block diagram as found in the 802.3z standard

802.3z Cont. Transmit characteristics (from 802.3z standard)

802.3z Cont. Receive characteristics (from 802.3z Standard)

802.3z Cont. The standard also defines a worst case link power budget and penalties This will probably be needed for determining the optical link budget

VCSEL Research Chose VCSEL Advanced Optical Components HFE4391-541 VCSEL 2.5Gbps, 850nm, SC VCSEL Cost: $14.50 for less than 1000 $7.25 for 1000 or more This VCSEL provided what we felt was the best combination of performance, price, and availability Placing orders by February 11

Four Corners Analysis for AOC HFE4391-541 VCSEL

Other VCSELS We chose to look primarily at 2.5Gbps models because they require less current. Many 1.25Gbps models require more current to operate properly than the Maxim laser driver will be able to provide in the worst case. Other VCSELs examined: Emcore Roithner Lasertechnik Appointech ThorLabs

ROSAs ROSA has been selected HFD3381-108 ROSA 2.5Gbps, 850nm, SC-ROSA Cost: $10.00 for less than 1000 $5.00 for 1000 or more This part, like the AOC VCSEL, provided the best combination of performance, price, and availability

Four Corners analysis of AOC HFD3381-108 ROSA

Other ROSAs, drawbacks Avalon Photonics: LC connectorized only, Swiss, $20.00 ULM: $25, overseas company Luxnet: Taiwan company, no response from inquiries Hamamatsu: unsure about connectors Copax: No response Optowell: Korean company, no response to emails Gigacomm: unsure about connectors, many errors in the data sheet AOC’s ROSA featured above average performance among this group, was in stock, and had the best price, making the ROSA decision very easy.

Preliminary Budgeting (estimation) AOC VCSEL: $14.50 (2) AOC ROSA: $10.00 (2) Two board fabs: $70.00 Maxim driver and limiting amp, Digikey passives, and Murata inductors, plus allowances for shipping costs: $80.00 Total projected budget: Approximately $210.00

Test Board Problems First test board kit was misplaced, putting us behind schedule. Second kit has been obtained Key to soldering lab did not work, compounding our frustrations Construction of test board (and testing) should be completed no later than Feb. 13

Next Week Build and test the test board Finalize optical link budget Begin design schematic Become familiar with board layout and necessary software Revise Gantt chart as necessary Order parts

References IEEE Computer Society (2003). IEEE 802.3 Standard. New York: The Institute of Electrical and Electronics Engineers, Inc. Retrieved Thursday, January 20, 2005, from ECE 164.02 website: http://www.ee.duke.edu/~mbrooke/EE164.02/Spring_2004/group_2/index_files/8023.pdf ECE164 Group 1 Presentations. (April 26, 2004). ECE164 Group 1 Website. Retrieved January 20, 2005 from http://www.ee.duke.edu/~mbrooke/EE164.02/Spring_2004/group_1/downloads.html ECE164 Group 2 Presentations. (April 17, 2004). ECE164 Group 2 Website. Retrieved January 20, 2005 from http://www.ee.duke.edu/~mbrooke/EE164.02/Spring_2004/group_2/presentations.html AOC datasheets for the HFE 4391-541 VCSEL and HFD 3381-108 ROSA