2/13/2014 1 PHENIX WEEKLY PLANNING Feb. 13, 2014 Don Lynch.

Slides:



Advertisements
Similar presentations
Fall Protection Standard 29 CFR Part
Advertisements

SA29T1 Slips, Trips & Falls. SA29T1 Main Causes of Inside Slips and Falls Flooring Type Floor Condition and Materials Change in Elevations Slippery or.
Job-Specific Safety Training Room Attendant
Preventing Slips, Trips & Falls
Changing Seasons Means Changing Walking Conditions. Next.
Slips, Trips, and Falls Healthcare Workers Slide Show Notes
Slips, Trips, and Falls.
5/1/ Slip, Trip and Fall Prevention Training Occupational Safety and Health Administration Directorate of Construction Danezza I. Quintero Senior.
SLIPS, TRIPS, & FALLS UNIVERSITY of N ORTHERN C OLORADO.
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Slips, Trips, and Falls. What are Slips, Trips & Falls? Slip A slip occurs when there is too little traction or friction between the shoe and walking.
Slips, Trips, and Falls. Section I Introduction 2.
2/6/ PHENIX WEEKLY PLANNING Feb. 6, 2014 Don Lynch.
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
5/15/ PHENIX WEEKLY PLANNING May 15, 2014 Don Lynch.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
Take 5 for Safety. Winter Slips and Falls – Per OSHA, Employers Must Do Risk Assessment  Supervisors: Walk down outdoor working and walking surfaces.
3/6/ PHENIX WEEKLY PLANNING March 13, 2014 Don Lynch.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
11/7/ PHENIX WEEKLY PLANNING Nov. 7, 2013 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
1 1/27/2011 PHENIX WEEKLY PLANNING 1/27/2011 Don Lynch No Meeting Today Lab Closed due to 2011 Snow Storm # 7.
PHENIX WEEKLY PLANNING 5/24/2007 Don Lynch. 5/24/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6/07 Remove HBD.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
6/12/2014 PHENIX WEEKLY PLANNING June 12, 2014 Don Lynch 1.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
4/10/ PHENIX WEEKLY PLANNING April 10, 2014 Don Lynch.
11/15/20121 PHENIX WEEKLY PLANNING 11/15/12 Don Lynch.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
7/31/2014 PHENIX WEEKLY PLANNING July 31, 2014 Don Lynch 1.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
5/22/ PHENIX WEEKLY PLANNING May 22, 2014 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
Preventing Slips, Trips, & Falls
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
4/17/ PHENIX WEEKLY PLANNING April 17, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
5/8/ PHENIX WEEKLY PLANNING May 8, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
Preventing Slips, Trips and Falls. Logistics Bathrooms are located… In the event of an emergency…
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
Slips, Trips, and Falls.
SLIPS, TRIPS AND FALLS INTERNET CONNECTION AND SOUND IS REQUIRED FOR THIS TRAINING *once you have completed this training module you will be directed.
Presentation transcript:

2/13/ PHENIX WEEKLY PLANNING Feb. 13, 2014 Don Lynch

2/13/ This Week Run 14 Continues, first collisions Plan/Install MPC-Ex FEM & Rack Continue F/VTX commissioning; FVTX troubleshooting Tech Support for Run 14 as required Access yesterday: Background counters troubleshooting Install new ethane tube trailer Support for sPHENIX efforts as required More snow?

2/13/ Next Week Presidents Day Lab Holiday Monday Run 14 Continues Plan/Install MPC-Ex FEM Continue F/VTX commissioning Tech Support for Run 14 as required Support for sPHENIX efforts as required

Mechanical installation complete Services connected Rack assembly & FEM assembly waiting for final FEM modules MPC-Ex Initial (Partial) Installation 2/13/2014 4

5 sPHENIX Prototype Beam Test of combined EMCAL and HCAL prototypes at Fermilab in Feb /13/2014

sPHENIX Support Structure Design 2/13/2014 6

7 sPHENIX Modeling support for updated MIE sPHENIX

2/13/ ePHENIX Plan View Elevation View

2/13/ Safety and Security PHENIX Annual Safety Review: Action Items (Continued) Complete the platform gates installation (Phillips Jan 15, 2014) Dave is still working on this, (hopefully to finish this week?) (Note: this is not required for run start sign off Document the new ethane installation and leak and pressure testing (Biggs Jan 15, 2014) In Progress Carry out an inspection of the installed platform gates (Cirnigliaro Feb 1, 2014) Dave must schedule the carpenters to finish this work then Cirnigliaro can do his walk thru. (Next week ??) General: Update the documented work procedures. (Lynch Continuing) There is only one procedure needing updating (MuID gas OPS) I have done a preliminary review and made some minor corrections, Rob has it next. Expect to have update completed by end of next week, 1/24/14. No other mandatory updates due in 2014, but will continue to monitor procedures and make updates if the need arises. (Note: this is not required for run start sign off) A walk through of the PHENIX detector prior to introduction of flammable gas. (Makdisi et al Jan 10, 2014) Done, all walkthru action items addressed

2/13/ Safety and Security PHENIX Annual Safety Review: Action Items (Continued) A walk through of the PHENIX detector prior to introduction of flammable gas. (Makdisi et al Jan 10, 2014) Done, See next page for action items from walkthru

2/6/ planned Technical Support & 2014 Shutdown Support for run 142/3-6/30/2014 Support for sPHENIX prototype tests at FermiLab1/21-2/25/2014 Procure & Fabricate parts for MPC-Ex North and South1/1/2014-6/30/2014 Assemble & test MPC-Ex South, ready for installation3/1-7/1/2014 End of Run Party7/11/14? Assemble & test MPC-Ex North, ready for installation7/1-9/25/2014 Start of Shutdown Tasks (purge flammable gas, disassemble and stow shield wall, remove collars, move EC to AH, Move MMS south, etc.)7/14 – 7/25/2014 Install scaffolding in Sta 1 South7/28/2014 Remove MPC-Ex prototype, Install new MPC-Ex South7/28-8/22/2014 Maint. & Repairs for MPC South, BBC South, RPC1 South, MuTr sta 1 South, as necessary7/28-8/22/2014 Remove scaffolding from sta 1 south, Move CM South8/25/2014 Install scaffolding in Sta 1 North8/26-8/29/2014 Prep MPC-Ex North installation area9/1-9/26/2014 Install new MPC-Ex North9/29-10/17/2014 Remove Sta 1 North scaffolds, Move CM North 10/20-10/24/2014 Other detector supportTBD Infrastructure Maintenance and ImprovementTBD Decommissioning of obsolete PHENIX detector equipmentTBD sPHENIX Supporton-going End of Shutdown Tasks (Move MS north, roll in EC, install collars, remove 10 ton cart, plates and manlifts, build shield wall, etc.)10/27-11/26/2014 Pink/White/Blue Sheets1/17/2014 End of Shutdown Party???? Start Flammable gas flow???? Close shield wall, install radiation interlocks and prepare for run 1412/31/2014 Start run 151/2/2015

2/13/ PHENIX Safety and Security From Ray Karol: YouTube Video: Real hazards of compressed oxygen cylinders YouTube Video: Walk like a penguin

2/13/ Safety and Security

Take Care: Tips to Avoid Slips, Trips, and Falls

Take Care… …Taking That First Step From Your Vehicle Slips and falls occur when exiting a vehicle because of surface changes, balance change, uneven or slippery surfaces, and distractions. Take Care: Keep 2-hand contact with the car until youre sure of solid footing. Pay attention to your environment.

Take Care… …To Wear Proper Footwear Appropriate For Conditions Smooth soles and high heels do not provide good traction during fall, winter and early spring conditions at BNL. Take Care: Wear non-slip or lug soled shoes or use traction devices on your footwear while walking outside.

Take Care… …To Walk Like a Penguin Fast, long steps with fully extended legs makes you vulnerable to slips. Take Care: Walk like a penguin for greatest stability! Keep your knees loose and extend arms at your side for balance. Bend forward a little and walk flat-footed with your feet pointed out slightly. Take short steps or shuffle.

Take Care… …To Wear Traction Devices for Icy and Snowy Conditions Traction devices maximize friction coefficient, and minimize fall potential. Take Care: These devices help but do not make you invincible. Follow all other precautions for slick conditions and DO NOT wear the traction devices inside!

Take Care… …Going Up and Down Stairs Stairways are common slip, trip, and fall areas and deserve extra attention. Take Care: Always use the handrail while going up and down stairs. Avoid distractions such as talking, using cell phones or reading while walking on stairways. Use elevators if carrying items.

Take Care… …Inside To Avoid Common Slip, Trip, and Fall Hazards Wet floors and curled rugs at entryways, open drawers, standing on chairs, and poor housekeeping cause many unnecessary injuries. Take Care: Be diligent about housekeeping, know your surroundings, carry small loads, and use the correct equipment for the job.

Take Care… …To Notify Your Supervisor if: You are aware of any unsafe conditions. Receive a workplace injury, no matter how minor. Conditions can change quickly. With your input, we can address safety issues quickly too. Take Care: Keep yourself, co-workers, and visitors safe by correcting conditions that you can or notifying your supervisor of any safety concerns.

2/13/

2/13/ Where To Find PHENIX Engineering Info Run 14 Continues! Lab Holiday Monday: Presidents Day