Update on Dark Fiber Techniques in the US

Slides:



Advertisements
Similar presentations
INDIANAUNIVERSITYINDIANAUNIVERSITY Update on US National and International Networking Initiatives James Williams Indiana University
Advertisements

Internet2 Update Gathering of State Networks 2005 Heather Bruning, Program Manager, Network Services Heather Boyles, Director, Member and Partner Relations.
Facilities Based Networking Corporation for Education Networking Initiatives in California (CENIC)
NLR – National LambdaRail CAN2004 November 29, 2004 Tom West.
©2003 PJM FERC Technical Conference July 14, 2004 MISO-PJM-TVA Alain Steven Vice President and CTO PJM Interconnection.
FiberCo/WaveCo Update Joint Techs February 12, 2007 Minneapolis, Minnesota.
NATIONAL CENTER FOR POLICY ANALYSIS Turning on the Lights 2011: The Consumer Benefits of Electric Power Competition by Carl Johnston and Lynne Kiesling.
National LambdaRail A Fiber-based Research Infrastructure Vice-Provost for Scholarly Technology University of Southern California Chair of the CENIC Board.
SURA - AT&T GridFiber Update Gary Crane, SURA Director of IT Initiatives The Quilt Fiber Workshop June 23, 2004.
Nlr.net © 2004 National LambdaRail, Inc Owning, Controlling and Managing the Network Infrastructure: Bridging Research Communities Tom West, CEO National.
National LambdaRail, Higher Education and the Future of Regional Optical Networks Dr. Robert Zimmerman, Director Computing Services University of Arkansas.
Internet2 Facilitate and coordinate the development, deployment, operation and technology transfer of advanced, network-based applications.
CIO Technology Council OneNet Update –General Operations Update –National LambdaRail (NLR) Update –Policy/Legislative Update OneNet Update –General Operations.
Abilene Update Joint Techs Summer ’05 Vancouver, CA Steve Cotter Director, Network Services Steve Cotter Director, Network Services.
National LambdaRail/ Florida LambdaRail/ Tallahassee Fiber Loop TalTech Alliance Presentation Larry Conrad Associate VP and CIO, FSU Chair, Florida LambdaRail,
23 September 2015 Pan-Continental Perspective: Key Issues seen by Internet2 Guy Almes Heather Boyles Steve Corbató.
Nlr.net © 2004 National LambdaRail, Inc NLR Update: Facilitating Learning and Discovery on a Global Scale International ICFA Workshop on HEP Networking,
Map Review. California Kentucky Alabama.
1. AFL-CIO What percentage of the funds received by Alabama K-12 public schools in school year was provided by the state of Alabama? a)44% b)53%
Copyright 2004 National LambdaRail, Inc National LambdaRail Tutorial 7/18/2004 Debbie Montano NLR Director, Development & Operations
Let’s See What You Know: Draw the outline of the United States Draw California Identify and label our three major bodies of water Star the location of.
NATIONAL CENTER FOR POLICY ANALYSIS Turning on the Lights 2011: The Consumer Benefits of Electric Power Competition by Carl Johnston and Lynne Kiesling.
HOPI Update Rick Summerhill Director Network Research, Architecture, and Technologies Jerry Sobieski MAX GigaPoP and TSC Program Manager Mark Johnson MCNC.
Copyright 2004 National LambdaRail, Inc Connecting to National LambdaRail 6/23/2004 Debbie Montano Director, Development & Operations
NLR Layer2/Layer3 Users BOF NLR status update Philadelphia Internet2 Member Meeting 19 September 2005 Brent Sweeny, Indiana University.
Directions: Label Texas, Arkansas, Louisiana, Mississippi, Tennessee, Alabama, Georgia, Florida, South Carolina, North Carolina, Virginia--- then color.
FiberCo/WaveCo Update Joint Techs July 16, Internet2 FiberCo FiberCo’s mission is to serve the Internet2 research and education community by providing.
Delivering Circuit Services to Researchers: The HOPI Testbed Rick Summerhill Director, Network Research, Architecture, and Technologies, Internet2 Joint.
Leveraging the NLR: Creation of the Florida LambdaRail Larry Conrad Associate VP and CIO, FSU Chair of Board, Florida LambdaRail, LLC.
NLR Layer2/Layer3 Users BOF NLR status update Albuquerque Internet2 Joint Techs 8 February 2006 Brent Sweeny, Indiana University Jon-Paul Herron, Indiana.
Internet2 Update Copyright Heather Bruning, Internet2, This work is the intellectual property of the author. Permission is granted for this material.
A Tool to Support Regional Optical Networks in the U.S. R&E Community Paul Love Internet2 JET Roadmap Workshop Jefferson Lab, Newport.
Nlr.net © 2004 National LambdaRail, Inc National LambdaRail, Inc Part #2.
Study Cards The East (12) Study Cards The East (12) New Hampshire New York Massachusetts Delaware Connecticut New Jersey Rhode Island Rhode Island Maryland.
Regional Optical Networks and Evolving US National Research and Education Networking Paul Schopis, OARnet Dale Smith, University of Oregon International.
Hawaii Alaska (not to scale) Alaska GeoCurrents Customizable Base Map text.
National LambdaRail/ Florida LambdaRail Larry Conrad Associate VP and CIO, FSU Board Chair, Florida LambdaRail, LLC.
1 © 2004, Cisco Systems, Inc. All rights reserved. Aiken & Boromound Network Research Infrastructure “Back to the Future” (aka National Lambda Rail – NLR)
US MAP TEST Practice
National LambdaRail, Inc – Confidential & Proprietary National LambdaRail 4/21/2004 Debbie Montano light the future N L.
INDIANAUNIVERSITYINDIANAUNIVERSITY HOPI: Hybrid Packet and Optical Infrastructure Chris Robb and Jim Williams Indiana University 7 July 2004 Cairns, AU.
Light the future N L R National LambdaRail Update Joint Techs 2005 Salt Lake City, Utah Dave Jent.
CENIC/NLR Optical Network Management Winter 2006 Joint Techs Workshop February 7, 2006 Chris Costa CENIC
Light the future N L R National LambdaRail Update Joint Techs ‘05 Salt Lake City, Utah Steve Cotter February 13, 2005.
Abilene: Everything You’ve Always Wanted to Know, but Couldn’t Find on the Web Site Brown Bag Session Heather Bruning, Abilene Program Manager 13 August.
HOPI Update - Internet 2 Project Hybrid Optical Packet Infrastructure Peter O’Neil NCAB May 19, 2004.
Copyright 2005 National LambdaRail, Inc
FiberCo/WaveCo Update
Visa Bankruptcy Education Services
Visa Bankruptcy Education Services
Visa Bankruptcy Education Services Bankruptcy Statistics May 19, 2016.
Content Objective: Language Objectives:
Membership Update July 13, 2016.
The States How many states are in the United States?
The HOPI Project Linda Winkler Argonne National Laboratory
Internet2 Network Infrastructure: Abilene Current Status and Future Plans Rick Summerhill Associate Director, Backbone Network Infrastructure, Internet2.
National LambdaRail Update Dave Jent NLR Layer 2/3 Service Center Indiana University July 18, 2005.
Regions of the United States
DO NOW: TAKE OUT ANY FORMS OR PAPERS YOU NEED TO TURN IN
Regions of the United States
Next Generation Abilene
Designing a New Networking Environment for U.S. Research & Education
People with Disabilities : Excellent Participation
The Future of Regional Networking Tempe, AZ February 12, 2008
Infrastructure Update
Steve Corbató Director, Backbone Network Infrastructure Tempe
WASHINGTON MAINE MONTANA VERMONT NORTH DAKOTA MINNESOTA MICHIGAN
Research & Education Network Business Models
CBD Topical Sales Restrictions by State (as of May 23, 2019)
Manhattan Landing Update
Presentation transcript:

Update on Dark Fiber Techniques in the US Steve Cotter, Internet2 CEF Workshop May 17, 2005

Background Director, Network Services at Internet2 Responsibilities include: Abilene Network Manhattan Landing Exchange Point (MAN LAN) FiberCo Also working on: Next-generation Abilene HOPI Project (Hybrid Optical Packet Infrastructure) Previously had responsibility for managing National LambdaRail’s fiber acquisition and facilities / optronics buildout

Networking in the US The model of a facilities-based infrastructure built with owned assets has gained momentum on both the regional and national scales What’s driving this? Desire to move away from the traditional GigaPoP model of provisioned, high-capacity services A distressed telecom market has created a contrarian opportunity to own what is viewed by many as a strategic asset – dark fiber – but the window is closing! Increasing capabilities / expertise in deploying and managing networks within the community Research needs - Grid computing wants to view the network as a schedulable resource On par with CPU, memory, storage, and visualization capabilities All at a time when carriers have not made major capital expenditures in new optical infrastructure

Current Landscape The result: U.S. research universities have been aggressively acquiring raw assets & ancillary services from wholesale telecom providers National LambdaRail launched to provide a national scale infrastructure for research and experimentation in networking technologies and applications Upwards of 30,000 route-miles of inter-city dark fiber are now held by this community < 40% held by NLR More than 25 RONs have emerged mostly state-based many with strong gubernatorial support often with concurrent economic development objectives Active examination of new network service models is underway Moving beyond the common bearer service view of best-effort IP

State and Regional Optical Networks Alabama* Arizona (CENIC) Arkansas* California (CALREN) Colorado (FRGP/BRAN) Connecticut (Conn. Education Network) Florida (Florida LambdaRail) Georgia (Southern Light Rail) Great Plains Network* Indiana (I-LIGHT) Illinois (I-WIRE) Louisiana* (LONI) Maryland, D.C. & northern Virginia (MAX) Michigan (MiLR) Minnesota New England region (NEREN) New Mexico* (NMSU, UNM) New York (NYSERNet, Cornell) North Carolina (NC LambdaRail) Ohio (Third Frontier Network) Oklahoma (OneNet) Oregon Pacific Northwest (Lariat – NIH BRIN, PNNL) Rhode Island (OSHEAN) SRON* (southeastern U.S.) Tennessee* (OneTN) Texas (LEARN) Virginia (MATP) Wisconsin (WiscNet) Wyoming (*RONs with RFx’s issued or in process of acquiring fiber) (RONs in red have made dark fiber acquisitions through FiberCo)

States with Regional Optical Networks States with a RON

FiberCo Overview Tool designed to support optical initiatives Spun off from NLR governance discussions Internet2 took responsibility for forming the organization Patterned on the success of Quilt commodity Internet project Operates on behalf of U.S. higher education and affiliates – Internet2 membership Not an operating entity Will not light the fiber – only a holding company Functions Market maker Assignment vehicle for both national & regional optical initiatives

FiberCo Overview Fiber partner National-scale IRU and O&M pricing available through March, 2006 on Level(3)’s traditional footprint Exploring compatible agreements with other providers - WilTel, Qwest, etc. Level(3) chosen because of their overall wholesale approach Open fiber interconnection policy Co-location space availability Homogenous fiber type - G.655 (Corning LEAF) No AUP/CoU restrictions Ease of interconnection with NLR 20 yr IRU: $310/km (~245 €/km) O&M: $62 pair/km/yr (~49 €/km/yr)

FiberCo Overview Bifurcated contracts designed to survive a carrier bankruptcy event 20 yr IRU – can be assigned to other non-profit entities O&M Contract – renewable on 5 yr terms FiberCo assigns both the fiber IRU asset and recurring O&M agreements through an assignment agreement 3-way among FiberCo, Level(3) & assignee Transaction fee (1/yr) charged to recover costs Ongoing bilateral relationship directly between Level(3) and assignee Assignees become responsible for any recurring IRU tax liabilities and potential exemptions

Current Product Portfolio Dark Fiber - ~7500 route miles assigned to date 20-year IRU agreements 5-year renewable agreement for fiber O&M and equipment co-location & power Pre-negotiated contracts customized for the R&E community Collaborative effort with Level(3) on interconnects and lateral builds Builds at cost plus 15% Metro Fiber National-scale pricing for metro fiber with Level(3) Volume discounts on metro fiber 50% paid for temporary lit services are credited toward cost of metro IRU Access to the Level(3) footprint in Europe at FiberCo prices

Work in Progress Closer collaboration with NLR and its regionals to help facilitate more deployments Formalized agreements with additional fiber providers so FiberCo can cover more geography, continue beyond March ‘06 Professional services agreement taking advantage of aggregate demand for: Network engineering & design Installation, test & turn up services Shared NOC services Remote hands & eyes

National LambdaRail Fiber Map SEA 8 8 POR 8 8 BOI SYR 8 4 4 4 STAR 4 NYC OGD 4 8 4 PIT 4 8 8 8 DEN KAN 8 CHI CLE CLE 8 SVL 8 4 8 8 8 SLC 8 4 4 8 8 8 4 WDC 4 8 LAX RAT RAL 4 8 LAX 8 4 8 8 PHO 4 ALB TUL 4 4 8 8 8 SAN 4 8 ATL 4 DAL 4 4 ELP 4 4 PEN 4 JAC 8 4 Level3 fiber WilTel fiber Other fiber 4 4 4 4 4 4 4 SAA BAT 4 4 HOU Cisco 15808 terminal Cisco 15808 OADM Cisco 15454 terminal Cisco 15454 OADM 8 4

NLR Layer 2 Network Cisco 6509 switch 10GE wave SEA CHI NYC PIT DEN SVL KAN CLE WDC RAL LAX PHO ALB TUL ATL ELP JAC BAT HOU Cisco 6509 switch 10GE wave

NLR Layer 3 Network Cisco CRS-1 router 10GE wave SEA CHI NYC DEN PIT WDC LAX RAL PHO TUL ALB ATL BAT JAC HOU Cisco CRS-1 router 10GE wave

NLR Equipment Layout 15808 15454 West East 6509 CRS-1 NLR demarc 15500 Metro and Regional Optical Networks 15500 15500 DWDM 1GE 10GE or OC192

Lessons Learned No single carrier has all routes Build ongoing relationships with multiple carriers The last mile (including the campus) is still the most difficult Dark fiber is real estate Transactions can be time consuming (up to 6 months) Definite advantage to pre-negotiated contracts Owning the fiber is only ~10% of the total cost of ownership Fiber plant design (hut spacing, topology), power, optical gear maintenance have great impact on recurring costs Know the capabilities of the fiber you are acquiring Fiber type, characteristics, and method of deployment must allow you to reach your networking goals (i.e. high channel count DWDM, 40G) Because of the uncertainty with funding, regionals in the US need to develop a sustainable business model You are now a service provider Need to remain aware of the capabilities of the equipment and new feature releases in order to deliver advanced services

Lessons Learned Need a mechanism to facilitate research collaboration on a regional basis between universities and the private/public sectors Creative solutions are sometimes best Combine lit services with deploying your own equipment to expand reach and minimize costs (i.e. adding commodity Internet, wave services for backhaul to the deal) Consider owning a pool of cards that can be deployed and redeployed on carrier gear where and when you choose Anchor tenant approach – carrier owns the chassis, you own up to X% channel cards within that chassis Lease fiber with option to buy Rent conduit, pull your own fiber

Observations The window for acquiring fiber at current pricing levels in the US is almost over – the economy is recovering and market prices going up! Potentially disruptive technologies are on the horizon Consolidation of the telecom industry in the US does not bode well for customer-owned networks

For more information Internet2 FiberCo National LambdaRail http://www/internet2.edu FiberCo http://www.fiberco.org National LambdaRail http://www.nlr.net