Dec 2008 doc.: IEEE 802.11-08/0xxx Nov 2011 802.11aa –Robust Audio Video Transport Streaming Atlanta Closing Report Date: 2011-11-10 Authors: Graham Smith,

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0222r1 Submission aa – Robust Audio Video Transport Streaming Singapore Opening Report Date: Authors: Mar 2011 Ganesh.
Advertisements

Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /1071r0 Submission aa – Robust Audio Video Transport Streaming San Francisco Closing Report Date: Authors: July 2011.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: IEEE /00852r3 Submission aa – Robust Audio Video Transport Streaming San Francisco, CA Opening Report Date: Authors: July.
Doc.: IEEE /1269r1 Submission aa – Robust Audio Video Transport Streaming Atlanta Closing Report Date: Authors: Nov 2009 Ganesh.
Doc.: IEEE /0382r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOAlliedtelesis R&D.
Submission May 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Status Report.
September 2008 doc.: IEEE /1003r0 July 2011
September 2008 doc.: IEEE /1003r0 Mar 2011
IEEE TGai Closing Report
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE TGai Closing Report
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE TGai Closing Report
September 2008 doc.: IEEE /1003r0 Jan 2010
HTC 34; 5656 AE Eindhoven, the Netherlands
TGaf Waikoloa Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Dec 2008 doc.: IEEE /0xxx Nov aa –Robust Audio Video Transport Streaming Atlanta Opening Report Date: Authors: Graham Smith,
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE TGai Closing Report
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
September 2008 doc.: IEEE /1003r0 May 2011
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
Changes From D8.00 to D9.00 Date: Authors: January 2008
TGz Beijing May 2010 Closing Report
September 2008 doc.: IEEE /1003r0 Sep 2010
TGaf Geneva Closing Report
HTC 34; 5656 AE Eindhoven, the Netherlands
TGn Closing Report Vancouver, BC, Canada 802 Plenary
September 2008 doc.: IEEE /1003r0 Sept 2011
September 2008 doc.: IEEE /1003r0 September 2011
TGaf Indian Wells Closing Report
IEEE TGai Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
802.11bd Timeline Date: Authors: January 2019
September 2008 doc.: IEEE /1003r0 Sep 2010
TGn Closing Report Los Angeles, CA, US 802 Interim
TGaf Waikoloa Closing Report
September 2008 doc.: IEEE /1003r0 May 2011
Joint Meeting with 802.1AVB Date: Authors: July 2011
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
September 2009 Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGaf Orlando Closing Report
TGae Closing Report – July 2011
September 2008 doc.: IEEE /1003r0 May 2011
TGn Closing Report – September 24 ‘09
Dec 2008 doc.: IEEE /0xxx Nov aa –Robust Audio Video Transport Streaming Atlanta Opening Report Date: Authors: Graham Smith,
September 2008 doc.: IEEE /1003r0 July 2011
IEEE ac – May 2013 First Sponsor ballot closed on May 5, 2013.
PAR Extension Motions Date: Authors: July 2016 Name Company
January 2012 doc.: IEEE /0179r1 Jan 2012
IEEE TGai Closing Report
Jan 2012 doc.: IEEE Jan aa –Robust Audio Video Transport Streaming Jacksonville Closing Report Date: Authors: Graham Smith,
TGae Closing Report – November 2011
September 2008 doc.: IEEE /1003r0 Sep 2010
TGbd Closing Report – Vietnam
Presentation transcript:

Dec 2008 doc.: IEEE 802.11-08/0xxx Nov 2011 802.11aa –Robust Audio Video Transport Streaming Atlanta Closing Report Date: 2011-11-10 Authors: Graham Smith, DSP Group Graham Smith, DSP Group

Dec 2008 doc.: IEEE 802.11-08/0xxx Nov 2011 Work Completed Resolved all initial Sponsor Ballot comments (11/1382r3) 147 comments Discussed 11/1417r1, “Ping-Pang Handoff” Consensus that subject was not in PAR for 11aa Passed Motion to approve a 15-day Sponsor Group Recirculation Ballot of D 7.0 Held a joint meeting with 801.AVB Slide 2 Graham Smith, DSP Group Graham Smith, DSP Group Bruce Kraemer (Marvell)

Joint meeting with 802.1AVB Provided 11aa update Nov 2011 Joint meeting with 802.1AVB Provided 11aa update New 802.1BA "Audio Video Bridging Systems" standard Bridging and Metrics (latency/QoS) are the main topics of BA. 802.1AVB have been very happy with the liaison with 11aa and are looking for a continuing similar relationship to assist with the AV streaming aspects on the wireless side once 11aa is completed. Graham Smith, DSP Group

Goal for January Meeting Nov 2011 Goal for January Meeting Complete comment resolution of Sponsor Ballot recirculation comments Start new recirculation Graham Smith, DSP Group

Timeline 11aa First Recirculation -- Sep 10, 2010 Nov 2011 Timeline 11aa First Recirculation -- Sep 10, 2010 Form Sponsor pool –May 2011 MEC Done – Aug 2011 Start Sponsor Ballot – Sep 2011 First Sponsor Recirculation – Nov 2011 Sponsor Ballot done (final WG approval) – Mar 2012 Final or conditional 802 EC approval – Mar 2012 RevCom/SA approval -- June 2012 (need to line up with appropriate RevCom/SA meeting dates) Graham Smith, DSP Group