Introduction to the Altair Project

Slides:



Advertisements
Similar presentations
Concept Overview for 2 mt Case “2 mt case”: integrated payloads of no more than 2 mt can be landed on the surface of Mars; extension of current Mars EDL.
Advertisements

Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
Presented by Marco Christov at the 11th Mars Society Annual Convention, 14 – 17 August 2008, Boulder Colorado. A Mars Heavy Transport.
A GenCorp Company High Thrust In-Space Propulsion Technology Development R. Joseph Cassady Aerojet 22 March 2011.
National Aeronautics and Space Administration Presentation to the NASA Goddard Academy 2. Constellation Overview Ken Davidian Lead, Commercial.
Ares V RFI Point of Departure Information Package
1 Review of US Human Space Flight Plans Committee Evaluation Measures and Criteria for Humans Spaceflight Options 12 August 2009.
Architecture Team Industry Day Briefing 17 January, 2002.
Lessons from Apollo * Data from NASA Apollo 11 Press Kit Shows spacecraft weight delivered to LEO (Low Earth Orbit) Shows weights for each portion of Apollo.
Larry Bell, Sasakawa International Center for Space Architecture (SICSA) Gerald D. Hines College of Architecture, University of Houston, Houston TX RUTGERS.
Inner Guides=Text Boundary Outer Guides=Inner Boundary Asteroid Redirect Mission and Human Exploration Michele Gates Human Exploration and Operations Mission.
Minimalist Human Mars Mission Surface infrastructure discussion July 26 th, 2008.
AAE450 Spring 2009 Propellant Choice and Mass Estimates for the Translunar OTV Week 2 Presentation Thursday, Jan 22, 2009 Brad Appel Propulsion Group.
AAE450 Spring 2009 Lunar Lander Preliminary propulsion system selection and design analysis Thursday, January 22, 2009 Thaddaeus Halsmer, Propulsion.
MAE 5495: Launch Vehicle Analysis LECTURE 1 Dr. Andrew Ketsdever Spring 2008.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
National Aeronautics and Space Administration The Future of Space Exploration Orion, Ares and Beyond.... AIAA / NSC / JPL Town Hall Meeting 26 April 2007.
Propulsion Engineering Research Center NASA Technology Roadmap: Launch Propulsion Systems Robert J. Santoro The Propulsion Engineering Research Center.
Jet Propulsion Laboratory California Institute of Technology National Aeronautics and Space Administration National Aeronautics and Space Administration.
The Return to Space Exploration Constellation. NASA Authorization Act of 2005 The Administrator shall establish a program to develop a sustained human.
November 30, 2006 Space Telescope Science Institute Conference Scott “Doc” Horowitz Associate Administrator NASA Exploration Systems Mission Directorate.
1 Head of Russian Federal Space Agency ISS Program International Cooperation Paris, June 17, 2009.
Summary Description of Previous Studies Study NameDateSummary Description Exploration Office Case Studies NASA's Office of Exploration did four.
A3 Altitude Test Facility
Oh, Thank Heaven for 7-Eleven: Fueling Up in Space with In-Situ Resource Utilization ASTE-527 Final Presentation Riley Garrett.
Introduction to the Altair Project Lauri N. Hansen, Project Manager April 8, 2008.
Constellation Program Overview Mark Geyer Constellation Program Office October 2006.
Commercial Space Vehicles Lessons Learned Needs Workshop Bette Siegel, Ph.D. ESMD Bette Siegel, Ph.D. ESMD September 18, 2006.
What to do with Space Station Poo 1. 2 David Heck Advanced Manufacturing Research & Development Boeing – Phantom Works, St. Louis, Mo SEND IT TO THE MOON.
Advanced Space Exploration LEO Propellant Depot: Space Transportation Impedance Matching Space Access 2010 April 8-10, 2010 Dallas Bienhoff Manager, In-Space.
Copyright © 2008 United Launch Alliance, LLC. All rights reserved. Images Courtesy of Lockheed Martin and The Boeing Company O22P1-478 SPACE Transportation.
RASC-AL 2010 Topics. TECHNOLOGY-ENABLED HUMAN MARS MISSION NASA is interested in eventual human mission to the Martian surface. Current Mars design reference.
Minimalist Mars Mission Establishing a Human Toehold on the Red Planet Executive Summary DevelopSpace MinMars Team.
Mars Today 1 An immediate and inexpensive program for manned Mars visitation.
Introduction to the Altair Project
America will send a new generation of explorers to the moon aboard NASA’s Orion crew exploration vehicle. After that, on to MARS!!!
The Augustine Committee Review of Human Spaceflight Plans Committee Briefing to COMSTAC October 29, 2009 Review of US Human Space Flight Plans Committee.
Structural Practices Principles of Space Systems Design U N I V E R S I T Y O F MARYLAND Structural Design Practices Payload interfaces to launch vehicles.
Unit 6 Lesson 1 Explanation. In 2004, President Bush set the following goal for the NASA constellation program, “this vision… is a sustainable and affordable.
29 May 2008 Exploration Technology Development Program’s Radiation Hardened Electronics for Space Environments (RHESE) Andrew S. Keys, James H. Adams,
Human Exploration of Mars Design Reference Architecture 5
LEO Propellant Depot: A Commercial Opportunity? LEAG Private Sector Involvement October 1 - 5, 2007 Houston, Texas LEAG Private Sector Involvement October.
Rocket Performance Principles of Space Systems Design U N I V E R S I T Y O F MARYLAND Parametric Design The Design Process Regression Analysis Level I.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
CSRP NASA Workshop NASA’s Revised Budget. CSRP NASA Workshop NASA’s New Vision and Objectives (as of January 14, 2004)  VISION  The fundamental goal.
October, 2005 NASA’s Exploration Architecture. 2 A Bold Vision for Space Exploration  Complete the International Space Station  Safely fly the Space.
Mission data MissionTotal mission duration [d]Crew size [-] Total mission Δv [m/s] from LEO (including mid-course corrections) Lunar flyby Low lunar.
Launch Structure Challenge - Background Humans landed on the moon in 1969 – Apollo 11 space flight. In 2003, NASA started a new program (Ares) to send.
Flight Hardware. Flight Profile - STS Flight Profile - SLS Earth Mars 34,600,000 mi International Space Station 220 mi Near-Earth Asteroid ~3,100,000.
An Earth – Moon Transportation System Patrick Zeitouni Space Technology.
AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh Chris Spreen
SLS Derived Vertical Habitat
The Global Exploration Roadmap Considerations on Life Support International Space Exploration Coordination Group (ISECG) Francois Spiero, CNES Co-chair,
NASA Model-Based Systems Engineering Pathfinder 2016 Summary and Path Forward Karen J. Weiland, Ph.D. Jon Holladay, NASA Systems Engineering Technical.
National Goals and Objectives
The Future of Human Spaceflight *** A Journey to Mars
Callisto Mission LaRC Option
Space Tug Propellant Options AIAA 2016-vvvv
Technical Resource Allocations
The ISECG Global Exploration Roadmap Status update at Target NEO2 Workshop July 9, 2013 NASA/Kathy Laurini Human Exploration & Ops Mission Directorate.
Propellant Depot Bernard Kutter United Launch Alliance
Mars Sustainability Workshop Kennedy Space Center February 8, 2018
Analysis of Rocket Propulsion
  Robert Zubrin Pioneer Astronautics W. 8th Ave. unit A
Ares I System Requirements Review (SRR)
Lunar Descent Analysis
Derivation of the FSOA in Ariane 6 Specifications
  Robert Zubrin Pioneer Astronautics W. 8th Ave. unit A
Team A Propulsion 1/16/01.
Presentation transcript:

Introduction to the Altair Project Lauri N. Hansen, Project Manager

NASA’s Exploration Roadmap 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Science Robotic Missions Mars Expedition Design Mars Expedition Design Lunar Outpost Buildup Lunar Robotic Missions Human Lunar Return Surface Systems Development Altair Development Early Design Activity Ares V Development We need to select a chart or modify this one to be able to show the scope of this assessment i.e ISS IOC/FOC Earth Departure Stage Development Orion Production and Operations Orion Development Initial Orion Capability Ares I Development Space Shuttle Ops Commercial Crew/Cargo for ISS ISS Sustaining Operations 2 2 SSP Transition… 2 2 2

Components of Program Constellation Earth Departure Stage Crew Exploration Vehicle Heavy Lift Launch Vehicle Lunar Lander Crew Launch Vehicle

Typical Lunar Reference Mission MOON Vehicles are not to scale. Ascent Stage Expended 100 km Low Lunar Orbit Lander Performs LOI Earth Departure Stage Expended Service Module Expended Low Earth Orbit CEV EDS, Lander Direct Entry Land Landing EARTH

Lunar Lander and Ascent Stage 4 crew to and from the surface Seven days on the surface Lunar outpost crew rotation Global access capability Anytime return to Earth Capability to land 15 to 17 metric tons of dedicated cargo Airlock for surface activities Descent stage: Liquid oxygen / liquid hydrogen propulsion Ascent stage: Hypergolic Propellants or Liquid oxygen/methane

Configuration Variants Sortie Variant 45,000 kg Descent Module Ascent Module Airlock Outpost Variant 45,000 kg Descent Module Ascent Module Cargo Variant 53,600 kg Descent Module Cargo on Upper Deck

Initial Project Structure Using a Smart Buyer approach Develop a preliminary government design Coming out of initial design effort, have independent reviews and solicit industry input on initial design Continue to refine design & requirements based on industry input Using knowledge gained from in-house design effort, create draft vehicle design requirements In FY10 have a vehicle requirements review, and baseline requirements Between 2009 – 2011, build hardware/test beds to mature confidence in path for forward design (lower risk of unknown surprises) Continue to mature design in-house until PDR timeframe (tentative)

Detailed Approach for Design Team Initial task was developing a preliminary in-house design: 6-9 mth duration Agency wide team Expert designers from across the agency Minimalist approach – add people on a case-by-case basis, only as needed Subsystems, not elements Approximately 20 – 25 people on the core team Co-located initially (approx 2 months) Working from home centers following initial co-location period Another 20-25 FTE distributed across the Agency (not co-located) Focused on Design (‘D’ in DAC) Developed detailed Master Equipment List (over 2000 components) Developed detailed Powered Equipment List Produced sub-system schematics NASTRAN analysis using Finite Element Models Performed high-level consumables and resource utilization analysis Sub-system performance analysis by sub-system leads Keep process overhead to the minimum required Recognizing that a small, dynamic team doesn’t need all of the process overhead that a much larger one does But…. It still needs the basics

“Minimum Functionality” Approach “Minimum Functionality” is a design philosophy that begins with a vehicle that will perform the mission, and no more than that Does not consider contingencies Does not have added redundancy (“single string” approach) Altair has taken a Minimum Functionality design approach Provides early, critical insight into the overall viability of the end-to-end architecture Provides a starting point to make informed cost/risk trades and consciously buy down risk A “Minimum Functionality” vehicle is NOT a design that would ever be contemplated as a “flyable” design! The “Minimum Functional” design approach is informed by: NESC PR-06-108, “Design Development Test and Evaluation (DDT&E) Considerations for Safe and Reliable Human Rated Spacecraft Systems CEV “Smart Buyer” lessons learned Recent CEV “Buyback” exercises

p711-B Lunar Lander* Altair Project Vehicle Concept Characteristics Lander Performance Crew Size: 4 LEO Loiter Duration: 14 days Surface stay time: 7 days (sortie) 180 days (outpost visit) Launch Shroud Diameter: 8.4m Lander Design Diameter: 7.5 m Launch Loads: 5 g axial, 2 g lateral Crewed Lander Mass (Launch): 45,586 kg Crewed Lander Mass (@TLI): 45,586 kg Crew Lander Payload to Surface: 500 kg Project Manager’s Reserve: 3009 kg Crew Lander Deck Height: 6.97 m Cargo Lander Mass (Launch): 53,600 kg Cargo Lander Mass (@TLI): Not applicable. Cargo Lander Payload to Surface: 14,631 kg Project Manager’s Reserve: 2227 kg Cargo Lander Height: 6.97 m EDS Adapter Mass: 860 kg (Not included in numbers above, includes growth and Manager’s Reserve) Crew Lander LOI Delta V Capability: 891 m/s Cargo Lander LOI Delta V Capability: 889 m/s Crew/Cargo Plane change and Loiter (Post CEV sep, 1 degree): 28.4 m/s PDI Delta V Capability: 19.4 m/s Crew Descent Propulsion Delta V Capability: 2030 m/s Cargo Descent Propulsion Delta V Capability: 2030 m/s TCM Delta V Capability (performed by RCS): 2 m/s Descent Orbit Insertion Capability (performed by RCS): 19.4 m/s Settling Burn Requirement (performed by RCS): 2.7 m/s Descent and Landing Reaction Control Capability: 11 m/s Ascent Delta V Capability 1881 m/s Ascent RCS Delta V Capability: 30 m/s Vehicle Concept Characteristics Ascent Module Diameter: 2.35 meters Mass (at TLI): 6,128 kg Main Engine Propellants: N2O4/MMH Useable Propellant: 3007 kg # Main Engines/Type: 1/Derived OME/RS18 (Pressure Fed) Main Engine Isp (100%): 320 sec Main Engine Thrust (100%): 5,500 lbf RCS Propellants: N2O4/MMH Useable Propellant: Integrated w/main # RCS Engines/Type: 16/100 lbf each RCS Engine Isp (100%): 300 sec Airlock Pressurized Volume: 7.5 m^3 Diameter: 1.75 m Height: 3.58 m Crew Size: 2+ Altair Project Descent Module (crewed) Mass (at TLI): 38,002 kg Main Engine Propellants: LOX/ LH2 Useable Propellant: 25,035 kg # Main Engines/Type: 1/ RL-10 Derived (Pump Fed) Main Engine Isp (100%): 448 sec Main Engine Thrust (100%): 18,650 lbf RCS Propellants: N2O4/MMH # RCS Engines/Type: 16/100 lbf each RCS Engine Isp (100%): 300 sec Descent Module (cargo) Mass (at TLI): 38,970 kg Useable Propellant: 26,611 kg *ENVISION parametrically sized “polar” lander concept informed by the LDAC-1 Starworks activity with selected additional redundancy and delta-v's that are representative of realistic trajectories, but not optimized for Thrust to Weight.