Background - Tolerance Rules

Slides:



Advertisements
Similar presentations
1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Advertisements

Implementation of Non Effective Days Nexus Workgroup – March
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
MIPI / RG140 Update Chris Shanley. Agenda  Review Group Background  MIPI Project - Background  RG140 Principles to be delivered via MIPI  Functionality.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Analysis of the Xoserve Read Validation Proposal Author: Alex Cullin 27/08/2014.
PN UNC Workgroup Read Validation 4 th October 2011.
Allocation of Unidentified Gas Statement – Interim Report findings 17 th September 2012.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
1 Industry Shipperless &Unregistered Working Group Thursday 7 th January 10.30am at xoserve.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
IGT and Shipper Workgroup meeting 28 th February 2011.
Rolling AQ – Initial Calculation
Distribution Workgroup 24/11/16
XRN4361 – UK Link Release 2 - Delivery
XRN4361 – UK Link Release 2 Data Migration Plan for XRN /03/18
Market Trials ChMC 8th August 2018.
Background - Tolerance Rules
XRN Construction of a Meter Reading where a Converter and AMR is recorded OR where a Meter with Conversion capability is fitted v2 DWG 28/06/2018.

Nexus Meter Read Performance April 2018


DSC Change Committee Summary – 12th December
XRN4770 – NDM Sample Data – Modification 0654 delivery – Amended file format ChMC – 9th January 2019.
DSC Change Committee Summary – 13th June
UNC Modification – Non Effective Days
R&N Timeline Release 2 Release 3 Feb-19 June-19
Future Release 3.0 – Release 3 Industry Impacts & Recommendation
Key Value Indicators (KVIs) Version 1.1 (amendments from V1.0 in red)
Exit Capacity Substitution and Revision
XRN4658 – OTR UNCVR Amendment eChMC – 23rd July 2018
Impacts of Project Nexus Implementation Date to AQ17

Update on Exit Capacity Substitution and Revision
Background MDD is currently managed within SPAA
DSC Change Committee Summary – 10th October
DSC Change Committee Summary – 9th May
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
DSC ChMC CSS Consequential Update 13th March 2019
General Plan Amendment & Zone Change Timeline

DSC Change Committee Summary – 13th March ‘19
Release 3 Update 07th March 2018.
Connections & Registration
Change Management Committee – Retail & Networks Update
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
XRN4249 – Part B Data Migration Plan
Revised Tender Timescale for DN Interruption Arrangements

Options for the Development of a Demand Side Response Mechanism
PN UNC AMR Topic Workgroup
Lessons Learnt UKLC - November 2015
AQ BTU Form – Process & Timeline 29th September 2009

Proposed June 2020 UK Link Major Release Scope / Governance Timeline
Retail & Networks ChMC Update
UNC Modification 0634 (Urgent) – Post Implementation Assessment
XRN4658 – OTR UNCVR Amendment
Implementation Approach Distribution Workgroup – June 2014
UIG Task Force Progress Report
Actions Updates Action 0282/006 – Exclude from AQ process
Meter Read Rejections ..
Meter Reads.
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Annual Quantity (AQ) 45.

UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Presentation transcript:

Information to support discussion at Distribution Workgroup - UNCVR - Gazprom Proposal

Background - Tolerance Rules Validation Rules set out in 2 tolerance ranges Inner Tolerance Range (ITR) that the Shipper User can override Outer Tolerance Range (OTR) that the Shipper User cannot override. Class 1 / 2 based on SOQ; Class 3 / 4 based on AQ. Class 3 / 4 is AQ/365*range Different AQ Bands have different ITR / OTR range…. Example: Lower AQ Band (kWh) Upper AQ Band (kWh) Tolerances where read will be accepted Tolerances where a Read will be Accepted if Submitted within Override Flag (Inner Tolerance) Outer Tolerance Where Read will be Rejected (Market Breaker) 1 0% - 2,000,000% of AQ/365 x no. of days 2,000,001% - 7,000,000 % of AQ/365 x no. of days >= 7,000,001% of AQ/365 x no. of days 2 200 0% - 10,000% of AQ/365 x no. of days 10,001% - 25,000 % of AQ/365 x no. of days >= 25,001% of AQ/365 x no. of days 201 500 0% - 4,000% of AQ/365 x no. of days 4,001% - 10,000 % of AQ/365 x no. of days >= 10,001% of AQ/365 x no. of days

Background - Tolerance Rules Tolerance Ranges were set based on limited information, but agreed with the industry As required by the industry, these were provisioned so that this could be changed when better information became available Prior to implementation the industry sought to reassess via PNUNC / DWG – but insufficient information to pursue this Post PNID a Change Proposal has been received and scheduled to split the 2-200 kWh band – this is in November 2018 UK Link Release Lower AQ Band (kWh) Upper AQ Band (kWh) Tolerances where read will be accepted Tolerances where a Read will be Accepted if Submitted within Override Flag (Inner Tolerance) Outer Tolerance Where Read will be Rejected (Market Breaker) 1 0% - 2,000,000% of AQ/365 x no. of days 2,000,001% - 7,000,000 % of AQ/365 x no. of days >= 7,000,001% of AQ/365 x no. of days 2 100 0% - 20,000% of AQ/365 x no. of days 20,001% - 45,000 % of AQ/365 x no. of days >= 45,001% of AQ/365 x no. of days 101 200 0% - 10,000% of AQ/365 x no. of days 10,001% - 25,000% of AQ/365 x no. of days >= 25,001% of AQ/365 x no. of days

Gazprom’s Proposal Red arrows indicate current Change Proposal

Requirement Statements Reduce instances of Meter Reading Tolerance Failures – i.e. where Shipper is unable to override this failure Retain existing value of Shipper User ITR, this is to: Retain Shipper responsibility to validate and override as necessary Remove this being a mandated Shipper change (and avoid Shipper User deferral to Major Release) Utilisation of existing parameters for change in order to realise implementation as soon as possible

Read Performance by Class – Class 4 15% 85% 15% 19% 18% 21% 78% 85% 85% 15% 81% 82% 79% 85% 85% 79% 85% 22% High level of acceptance in the largest pot of sites 21% 19% 18% 15% 15% 15%

Top 10 Rejection Codes by Class – Class 4 MRE00490 – shipper pack containing legacy data shows that this made up 80% of rejections in legacy – need to understand is this causing an issue for the industry, is it automated systems sending in reads too frequently, is there anything we can do to help

Energy Tolerance Rejections – Class 4 REJECTION_REASON Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 MRE01026 Reading breached the lower Outer tolerance. 53569 48255 67672 83988 88159 86013 79552 MRE01027 Reading breached the Upper Outer tolerance. 40648 31861 33230 36357 39996 49492 57353 MRE01029 Reading breached the upper Inner tolerance value and no override flag provided. 63373 25742 21193 18628 20161 49078 211651 MRE01030 Override tolerance passed and override flag provided 26660 11406 9987 8106 8994 19512 52723 Total 184250 117264 132082 147079 157310 204095 401279 REJECTION_REASON Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 MRE01026 Reading breached the lower Outer tolerance. 3.77% 3.94% 4.86% 5.08% 5.28% 4.14% 4.22% MRE01027 Reading breached the Upper Outer tolerance. 2.86% 2.60% 2.38% 2.20% 2.39% 3.04% MRE01029 Reading breached the upper Inner tolerance value and no override flag provided. 4.46% 2.10% 1.52% 1.13% 1.21% 2.36% 11.23% MRE01030 Override tolerance passed and override flag provided 1.87% 0.93% 0.72% 0.49% 0.54% 0.94% 2.80% Total % of overall rejections 12.96% 9.57% 9.48% 8.89% 9.42% 9.82% 21.30% Top code is all within the shippers gift to prevent MRE01027 – Market Breaker rejections – number of queries surrounding these, normally data issues from legacy – assisting on case by case basis

Analysis – OTR Read Rejections Application of Tolerance Bands with respect to Gazprom proposal All readings were subject to Tolerance Failures They may have also been subject to other Meter Reading Failures too Note: Orange Band shows existing tolerance bandings Blue Band shows ‘Proposed’ tolerance bandings Grey Band shows ‘Suggested’ – Alternative Gazprom proposal if required

Analysis Summary of increase in Reading acceptance versus Gazprom proposal Indicates % of Readings that failed OTR Validation that would pass with the alternative tolerances.

Other Requirement Statements? Testing First parameter change in production – testing of revised values is required Transition Need to specify, assume that the UNCVR are based on read processing date, rather than reading date Training None identified Security considerations Data permissions Others?

Change Governance UNCC paper – presentation to UNCC of revised UNCVR- 19th April 2018 Broad support for the change by UNCC, requesting implementation as soon as possible Scheduled for discussion at Distribution Workgroup – 26th April 2018 DSG – preliminary discussion at DSG - 22nd April 2018 ChMC – preliminary discussion – April 2018 DSC ChMC Change Proposal raised 25th April 2018 Others?

Questions…………..