P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot.
Advertisements

Doc.: IEEE /0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 1 P802.11ac Report to EC on Conditional Approval to go to.
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: IEEE /0287r6 Submission March 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to Sponsor.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.
Doc.: IEEE /1437r0 Submission Nov 2008 Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam) Slide 1 Précis of P802.11n Report.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
xxxx doc.: IEEE /xxxxr0 March 2017
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
Motion #1: TGaq EC Report
TGaq Comment Resolution Motions
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 Closing Report
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
TGaq Closing Report Date: Authors: July 2016 July 2016
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
TGaq Comment Resolution Motions
Presentation transcript:

P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot July 2016 doc.: IEEE 802.11-16/1026r0 July 2016 P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot Date: 2016-07-28 Authors: Stephen McCann, BlackBerry Stephen McCann, BlackBerry

July 2016 doc.: IEEE 802.11-16/1026r0 July 2016 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11aq Draft 7.0 to Sponsor Ballot. This document was approved during the plenary session of the 802.11 working group on 29th July 2016. Passed in the Working Group xxxx yes, xx no , xxx abstain Stephen McCann, BlackBerry Stephen McCann, BlackBerry

802.11 WG Letter Ballot Results – P802.11aq July 2016 802.11 WG Letter Ballot Results – P802.11aq Ballot ID Ballot Close Date Title Ballot Type Pool Return %Return Abstain %Abstain Approve Disapprove %Approve 208 2015-02-02 IEEE 802.11aq Draft 1.0 Technical Technical 363 259 71 63 24 139 52 73 216 2015-10-08 IEEE 802.11aq Draft 3.0 Technical 358 260 42 16 202 93 219 2016-04-06 IEEE 802.11aq Draft 4.0 First Recirculation Recirculation 357 275 77 45 213 17 221 2016-07-04 IEEE 802.11aq Draft 5.0 Second Recirculation 280 78 46 218 221.1 LB221 Post Ballot vote changes 220 14 94 Stephen McCann, BlackBerry

802.11 WG Letter Ballot Comments – P802.11aq July 2016 802.11 WG Letter Ballot Comments – P802.11aq Ballot ID Ballot Close Date Title Total Number of Comments received (Yes and No votes) 208 2015-02-02 Technical Letter Ballot for TGaq draft 1.0 700 216 2015-10-08 Technical Letter Ballot for TGaq draft 3.0 400 219 2016-04-06 First Recirculation Ballot for TGaq draft 4.0 71 221 2016-07-04 Second Recirculation Ballot for TGaq draft 5.0 65 Stephen McCann, BlackBerry

Unsatisfied Technical comments by commenter July 2016 Unsatisfied Technical comments by commenter Voter LB216 LB219 LB221 Total Adrian Stephens 6 5 11 Emily Qi 7 3 10 Graham Smith 15 Joseph Levy 22 Jouni Malinen 27 2 35 Mark Hamilton 23 8 31 Mark RISON 1 Matthew Fischer 9 Paul Lambert Payam Torab Su Khiong Yong Yongho Seok 4 Zhongding Lei 100 13 40 153 Stephen McCann, BlackBerry

Unsatisfied Technical Comments – Topics July 2016 Unsatisfied Technical Comments – Topics Topic #Comments Architecture (Cls 4.5.9) 26 MLME SAP interface (Cls. 6) 9 Frame Formats (Cls 8/9) 25 MLME procedures (Cls. 10/11) 59 PICS, MIB, Scenarios (Annex B, C, W) 21 General (Cls 3 or no Cls. specified) 13 Total 153 Stephen McCann, BlackBerry

Unsatisfied comments July 2016 The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. Stephen McCann, BlackBerry

TGaq Timeline Open Close Fourth recirculation (TGaq D7.0) 3-Sept-16 July 2016 doc.: IEEE 802.11-16/1026r0 July 2016 TGaq Timeline Open Close Fourth recirculation (TGaq D7.0) 3-Sept-16 18-Sept-16 First sponsor ballot 21-Sept-16 21-Oct-16 Second sponsor ballot 15-Dec-16 5-Jan-17 Third sponsor ballot 20-Jan-17 4-Feb-17 Fourth sponsor ballot 18-Feb-17 5-Mar-17 EC to RevCom March-17 RevCom to SB March-17 Stephen McCann, BlackBerry Stephen McCann, BlackBerry

July 2016 References Stephen McCann, BlackBerry