Wednesday 03/11 – The Plan Finish electron-cloud program:

Slides:



Advertisements
Similar presentations
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Advertisements

Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Production running 1 pb-1Lost to Mon h2062e32EOF studies Tue h17.152e32UFO Q8.L5 Tue h e32OP request Thu h e32OP.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Ion Commissioning: Thursday & Friday
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Monday 21st January & night
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Tuesday Nov 16th Fill 1492 into physics around 07.30
Saturday 30th June - Sunday: Rocky !
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Monday – recovery from MKI flashover
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Friday 31st August & night
Week 35 – Technical Stop and Restart
Monday Morning – recovery from cryo.
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Sunday
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 24 October hours of 25ns MD
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Scrubbing progress - 08/12/2012
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Thursday 22 September 2011.
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
LHC - Week 38 Technical stop: Katy Foraz
Summary Tuesday h23: Machine closed. Precycle started.
Thursday
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Wednesday 26 October 2011.
Wednesday 14:30 Fill 2011 dumped.
Wednesday morning / afternoon
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Saturday Luminosity production 1380 bunches
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Thursday 10:00 Fill 1986 in stable beams.
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Monday 152 bunch operation summary
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Presentation transcript:

Wednesday 03/11 – The Plan Finish electron-cloud program: Scrubbing with trains of 24 bunches Comparison vacuum with 12 + 36 bunches Physics fill with bunch trains of 24 bunches: 1 + 12 +4 * 24 = 109 04/11/2010 LHC 8:30 meeting

Finish the scrubbing 24 bunches: 23 hours 03/11 Larger v 228 bunches unstable RCBXV2.R8 tripped: access 12+36 bunches 8e-7 mbar Take it easier 1e-7 mbar Cold to warm transition: worst case 04/11/2010 LHC 8:30 meeting

Fill from 06:00: beam unstable – increased chroma BLM TCTH.4L8B1 triggered B2 F.Roncarolo 04/11/2010 LHC 8:30 meeting

Longer fill until noon beams dumped shortly after having injected last batch of 24 bunches on B2. The BLM BLMEI.06L7.B2I10_TCLA.D6L7.B2 triggered on the 655 ms RS. 04/11/2010 LHC 8:30 meeting

Comparison 12 + 36 bunches 31/10: max p @ LSS3 VGPB.5L3.B = 5.5E-7 mbar Gained factor 10 03/11: max p @ LSS3 VGPB.2.5L3.B=6E-8 mbar Beams dumped ... losses on TCTH at Pt8 04/11/2010 LHC 8:30 meeting

Loosing beams and filling for physics Losses on TCTH point 8 also with only 12 bunches Bring chromaticity down to 4 Switch off Alice solenoid for physics fill and correct orbit Fill for physics 1 + 12 + 4 * 24 = 109 bunches Again losses on TCTH.4L8 for B2 dumping the beam Suspicious damper signals beam 2: put in a bump of -0.5 mm at damper pickup Q9 V – TCTH losses solved Alice solenoid off -> Large vacuum activity when injecting 4th train of 24 bunches: Vacuum Interlock on Sector Valve VVGSF.221.1R2.X when injecting 108b on B1 ! Switching Alice solenoid back on again Vacuum improving at 20 kA Perform interlock test BPMSB.A4L6.B2 to prepare for physics Ramp Alice solenoid fully up (30 kA) Fill for physics 04/11/2010 LHC 8:30 meeting

Pressure variation during injection and when ramping solenoid in ALICE up again 04/11/2010 LHC 8:30 meeting

Vacuum in Alice over 25 hours 8e-7 mbar 1e-7 mbar 04/11/2010 LHC 8:30 meeting

Ramp 12 + 4 x 24 bunches First ramp lost due to collimator position TCSG.4R3B1 - LVDT on the right jaw interlocked Second ramp – arrived at the top Prepare for squeeze: Switched off damper, beam was lost within seconds Oscillating in the H plane for both beams 04/11/2010 LHC 8:30 meeting

Vacuum ok, but beam not stable enough to switch off damper Vacuum during ramp Ramp above  2 TeV Vacuum ok, but beam not stable enough to switch off damper 04/11/2010 LHC 8:30 meeting

Plans Thursday 4/11 – 08:00 Access 2 hours Thursday 4/11 – 10:00 Check machine after access with protons – BCT calibration Thursday 4/11 – 12:00 Start lead ion beam commissioning Friday and weekend Lead ion beam commissioning 04/11/2010 LHC 8:30 meeting