Vendor Management The Pre-Qualification Package and You!

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

1 Important Changes to the Victorian Electricity Industry for Electrical Infrastructure Civil Works 1 July 2009.
Construction H&S Policy & Procedures 1 Health & Safety Policy & Procedures PRODUCT OVERVIEW.
Contractor Safety Management
Things To Remember About Completing I-9 Forms
Penn State University Environmental Health and Safety Hazard Assessment and Personal Protective Equipment Training.
Washington University Medical Center Campus Renewal Project MANDATORY BILLING MEETING JUNE 12, 2015 Presented by:
This material was developed by Compacion Foundation Inc and The Hispanic Contractors Association de Tejas under Susan Harwood Grant Number SH SH0.
Safety and Health Programs
Review Quiz 1. OHS Legislation 4. Incident Response Introduction 2. Hazards & Controls 3. OHS Communication EASY GUIDES Australia.
Frank G. Jackson, Mayor Office of Equal Opportunity Monthly Report and Affidavit An Introduction.
Safety and Health Program Section B of the Forest Activities Code.
1 Effective Safety & Health Assessments: Audits and Inspections Disclaimer: These safety materials, resources and PowerPoint ® presentations are not intended.
Multi Employer Worksite Policy OSHA - Austin Area Office.
OSHAX.org - The Unofficial Guide To the OSHA1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale.
Implementing an Effective Safety and Health Program
Health and Safety Policy
Contract Training Class I
Penn State University Environmental Health and Safety Hazard Assessment and Personal Protective Equipment (PPE) Training.
MINING FOR THE NATION CONTRACTOR MANAGEMENT. MINING FOR THE NATION MATLA COLLIERY NEW CLYDESDALE COLLIERY ARNOT COLLIERY GLISA COLLIERY.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
ASPEC July 2015 Incidents –1 incidents, 0 near misses Hours 27/06/15-31/07/15 12% Site, 0.5% Travel, 87% Office ASPEC QSHR July 2015 Minutes.
Disadvantaged Business Enterprise (DBE) Each Submitter’s Responsibility for Outreach Efforts.
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
Historically Underutilized Business (HUB) Requirements.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Auditing your Transportation & Hazmat Shipping Operations
Cessco Fabrication & Engineering Ltd.
THURSDAY TARGETED TRAINING: Reporting Regulations and Requirements
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Health and Safety Policy
Disadvantaged Business Enterprise (DBE) Each Bidder’s (or Proposer’s) Responsibility for Outreach Efforts.
Safe Field Research …advice from EHS.
Historically Underutilized Business (HUB) Requirements
Vacation Requests Form
Instructional Guide on Licensure Advancement
Risk management - HIRAC awareness presentation
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Vendor Management The Pre-Qualification Package and You!
Vendor Management The Pre-Qualification Package and You!
Who is Liable for a Construction Accident?
Quality Management Systems – Requirements
Contractor Control system
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Welcome to.
Contractor Control system
CONTRACT COMPLIANCE TRAINING
Comprehensive Safety Analysis (CSA) 2010 Supplemental Slides to discuss Data Preview with Motor Carriers U.S. Department of Transportation Federal Motor.
Roadmap to COR.
Meditation Class 1. Meditation Class 2. Meditation Class 3
2-1-1 Automated Verifications
Contractor Control system
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Vendor Management The Pre-Qualification Package and You!
Vendor Management The Pre-Qualification Package and You!
Vendor Management The Pre-Qualification Package and You!
SAU I-983 Instructions This PowerPoint provides simple instructions to complete the I983 form. SEVP also provides instructions on how to complete the I-983.
How to Upload Exchange Hour Certificates in Eduphoria
Safety & Health Programs
Safety & Health Programs
How to conduct Effective Stage-1 Audit
Vendor Management The Safety Qualification Package and You!
Vendor Management The Pre-Qualification Package and You!
Safety & Health Programs
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Contract Requirements for Suppliers
Presentation transcript:

Vendor Management The Pre-Qualification Package and You! Section 5 – Program Verification Touch the spacebar on your keyboard or click your mouse pointer anywhere on the screen to advance the slideshow.

City of Fort Saskatchewan Safety Qualification Form The focus of this particular slideshow is Section 5 – “Program Verification” City of Fort Saskatchewan Safety Qualification Form Thank you for choosing to work with the City of Fort Saskatchewan! This slide show is intended to help walk you through filling in the form and providing examples of what attachments will be required.

Section 5: Program Verification This part of the safety qualification form deals with verifying a few areas within safety performance. If you said “No” to having a COR, SECOR, SMS and “No” to hazard assessments, inspections, safety meetings and subcontractor management…. Safety Management Systems, also know as “Safety Programs”, are currently not a mandatory requirement under Alberta OH&S Legislation. Having a SMS is, however, strongly encouraged and will become a requirement in the future for all City Vendors for employers with 20 or greater employees by 1 June 2018. Vendors with a Certificate of Recognition (COR) or Small Employer Certificate of Recognition (SECOR) for safety management may be given a preference over those without one. If you do not know what a Certificate of Recognition is, click here. Section 5: Program Verification 5. PROGRAM VERIFICATION If your company has COR, SECOR, a SMS or said yes to parts of a SMS: Attach a copy of the completed formal hazard assessment for overall company scope of work. (Not a field level or site specific hazard assessment) Provide frequency and percentage of compliance for worksite safety inspections:   Frequency:_____________ Compliance: __________% Provide frequency and percentage of compliance for safety meetings: If “yes” to subcontractor management in SMS, attach a copy of the subcontractor management process. …then leave this section blank and move onto Section 6. Please note, the absence of some processes may disqualify an organization from being awarded a contract.

Section 5: Program Verification What is a “formal hazard assessment” for the company scope of work? The first requirement is for a completed formal hazard assessment for the company scope of work. Section 5: Program Verification 5. PROGRAM VERIFICATION If your company has COR, SECOR, a SMS or said yes to parts of a SMS: Attach a copy of the completed formal hazard assessment for overall company scope of work. (Not a field level or site specific hazard assessment) Provide frequency and percentage of compliance for worksite safety inspections:   Frequency:_____________ Compliance: __________% Provide frequency and percentage of compliance for safety meetings: If “yes” to subcontractor management in SMS, attach a copy of the subcontractor management process.

Section 5: Program Verification A formal hazard assessment is a detailed document that identifies several key aspects of what a company does… …and it has several mandatory requirements to meet minimums of Alberta OH&S Legislation. It must have: A Date (in full with Day, Month, and Year); Hazards both existing and potential; and Controls that follow the hierarchy of controls: Elimination; Engineering; Administrative; and Personal Protective Equipment Section 5: Program Verification 5. PROGRAM VERIFICATION If your company has COR, SECOR, a SMS or said yes to parts of a SMS: Attach a copy of the completed formal hazard assessment for overall company scope of work. (Not a field level or site specific hazard assessment) Provide frequency and percentage of compliance for worksite safety inspections:   Frequency:_____________ Compliance: __________% Provide frequency and percentage of compliance for safety meetings: If “yes” to subcontractor management in SMS, attach a copy of the subcontractor management process.

Section 5: Program Verification To learn more about hazard assessments and the hazard assessment process to include examples: Click here for the OH&S Explanation Guide Click here for the Hazard Assessment and Control Handbook. Section 5: Program Verification 5. PROGRAM VERIFICATION If your company has COR, SECOR, a SMS or said yes to parts of a SMS: Attach a copy of the completed formal hazard assessment for overall company scope of work. (Not a field level or site specific hazard assessment) Provide frequency and percentage of compliance for worksite safety inspections:   Frequency:_____________ Compliance: __________% Provide frequency and percentage of compliance for safety meetings: If “yes” to subcontractor management in SMS, attach a copy of the subcontractor management process.

Section 5: Program Verification If your company does work-site safety inspections, how often do you do them? Annually, Quarterly, Monthly, Weekly, etc… Based on the frequency of your inspections, how close are you to compliance with your policy? Example: A monthly inspection policy with only 8 of 12 months documented is a 66.7% compliance. Section 5: Program Verification 5. PROGRAM VERIFICATION If your company has COR, SECOR, a SMS or said yes to parts of a SMS: Attach a copy of the completed formal hazard assessment for overall company scope of work. (Not a field level or site specific hazard assessment) Provide frequency and percentage of compliance for worksite safety inspections:   Frequency:_____________ Compliance: __________% Provide frequency and percentage of compliance for safety meetings: If “yes” to subcontractor management in SMS, attach a copy of the subcontractor management process. NOTE: These must be documented work site inspections and the frequency must be a measureable standard. The phrase “on a regular basis” does not suffice. Monthly 66.7

Section 5: Program Verification If your company does work-site safety meetings, how often do you do them? Annually, Quarterly, Monthly, Weekly, etc… Based on the frequency of your safety meetings, how close are you to compliance with your policy? Example: A weekly meeting policy with only 48 of 52 weeks documented is a 92.3% compliance. Section 5: Program Verification 5. PROGRAM VERIFICATION If your company has COR, SECOR, a SMS or said yes to parts of a SMS: Attach a copy of the completed formal hazard assessment for overall company scope of work. (Not a field level or site specific hazard assessment) Provide frequency and percentage of compliance for worksite safety inspections:   Frequency:_____________ Compliance: __________% Provide frequency and percentage of compliance for safety meetings: If “yes” to subcontractor management in SMS, attach a copy of the subcontractor management process. NOTE: These must be documented meetings and the frequency must be a measureable standard. The phrase “on a regular basis” does not suffice. Monthly 66.7 Weekly 92.3

Section 5: Program Verification If your company identified that you use sub-contractors and that you have a subcontractor management process… …attach a copy of the document(s) that apply to the process. NOTE: A list of all sub-contractors will be required prior to the start of a project after a contract has been awarded. Section 5: Program Verification 5. PROGRAM VERIFICATION If your company has COR, SECOR, a SMS or said yes to parts of a SMS: Attach a copy of the completed formal hazard assessment for overall company scope of work. (Not a field level or site specific hazard assessment) Provide frequency and percentage of compliance for worksite safety inspections:   Frequency:_____________ Compliance: __________% Provide frequency and percentage of compliance for safety meetings: If “yes” to subcontractor management in SMS, attach a copy of the subcontractor management process. Monthly 66.7 Weekly 92.3

Thanks for viewing! If you still have questions, please contact your Fort Saskatchewan City Representative. If you still have questions, please contact your City of Fort Saskatchewan representative. Thanks for viewing!