API 17H TASK GROUP January , 2014.

Slides:



Advertisements
Similar presentations
E-Portfolio July2014 Managing Multi-source Feedback.
Advertisements

SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
Doc.: IEEE /527r1 Submission November 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
API SC6 Valves and Wellhead Equipment TG3 – Wellhead Design in Standards and TRs Kenneth Young 14 June 2012 SC6 Summer Meeting - Westminster, CO1.
Doc.: IEEE r1 Submission May 12, 2002 Dr. John R. Barr, Motorola Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Status: Draft Status report for revision of ISO (API 17F) Winter meeting Houston January 2010.
San Francisco, CA. SC8 Liaison Report
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
Status: Draft Status report for revision of ISO (API 17F) Summer meeting Washington June 2010.
API SUBCOMMITTEE 17 SUMMER MEETING 13 January /13/2016 Subsea Industry Standardization Landscape Terry Cook – API SC17 Vice-Chair.
© 2006 IBM Corporation © 2011 IBM Corporation 1 Registering an opportunity for an incentive program in Global Partner Portal - Europe.
David By michelangelo. Statue.
API 2017 Exploration and Production Winter Standards Meeting
TG Chair: Darren Bane (BHI)
Registering an opportunity for an incentive program How to register an opportunity for an incentive program in Global Partner Portal - Europe.
Please review these important Webinar Etiquette guidelines
Maintenance Task Group Closing Report
Security Working Group
Task Group 19LH Liner Hanger Equipment
Task Group API 19SS Sand Screens
API Subcommittee 17 - Specification 17D January 2016 Status
API Gas-Lift Task Group Session Fall 2003 Gas-Lift Workshop
API RP 17A - Discussion Points
ANAB AQMS Activity 2011 ~ January - March April 2011
Submission Title: [WG-SG3b Closing Report Jan04]
Task Group Status January 2014
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
API 17V – Subsea Safety API 17V January 2014 By Christopher Curran
API SC6 Valves and Wellhead Equipment
Submission Title: [WG-TG3 Closing Report Nov03]
Figure Drawing: Figures in Space.
Ninth Edition in Modules
API 17P TASK GROUP January, 2015.
API 17H TASK GROUP January 15, 2013.
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
November 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG w November 2018 Closing Report]
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17H ROV/ROT Interfaces
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API Standard 53 Update June 2017
Creating a Transmittal
WG on Composite Cements: Calgary Meeting 2017
Submission Title: [WG-TG3b Meeting Report September05]
Managing Multi-source Feedback
API 17O HIPPS Task Group Status June /20/2019 API 17O HIPPS.
API 17H ROV/ROT Interfaces
Quality Management Review Meeting DD Mmm YYYY
API 10 F.
API 17H ROV/ROT Interfaces
Discussion Points API RP 17A Task Group Members
API 17H TASK GROUP January, 2015.
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
CSOEM Materials Advisory Resource Group
Task Group Status January 2013
doc.: IEEE <doc#>
[Ballot code, contract number] [Project title]
[Ballot code, contract number] [Project title]
Status report for revision of API 17F
API 17H TASK GROUP June 26, 2013.
API 17P TASK GROUP 13 June, 2012.
Preparing for the future …
API 17P TASK GROUP June 26, 2013.
Engineering Design Process
Item 4.1: Annual labour market flows
API Specification 16D Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment.
Presentation transcript:

API 17H TASK GROUP January , 2014

BACKGROUND API 17H second edition was published in June 2013 API 17M was withdrawn and replace with API 17H A new work item has not been initiated for the next edition

TEAM MEMBERS (API) Name Company E-mail Charles White BG Norge charles.white@bg-group.com Cody Outlaw Chevron codyoutlaw@yahoo.com Mark Holder FMC mark.holder@fmcti.com David Ellison Noble Denton david.ellison@nobledenton.com James Gibbs JPKenny james.gibb@jpkenny.com Brian Skeels brian.skeels@fmcti.com John Fassero ExxonMobil john.fassero@exxonmobil.com Karl Schnakenburg BHP Billiton karl.schnakenburg@bhpblliton.com

CURRENT STATUS Two inquiries recieved for second edition Clarification of quality requirements for hot stabs Clarification of dimensions in Figure 20 (Type C hot stab) Released Errata to correct Figure 20

CURRENT STATUS Focus areas for the next edition are: Further normalization of hot stab drawings Clarification of quality requirements Consider outstanding comments left from the previous edition Add references to recently released recommended practice

NEXT STEPS Initiate new work item

OPEN ISSUES none