WS-RX TC Process for Specification Development

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
Planning DITA 1.3 Kristen James Eberlein Eberlein Consulting.
Doc.: IEEE /1091r4 Submission May 2015 TGaj Editor Report for CC20 Jiamin Chen, HuaweiSlide 1 Date: Author:
L2VPN WG “NVO3” Meeting IETF 82 Taipei, Taiwan. Agenda Administrivia Framing Today’s Discussions (5 minutes) Cloud Networking: Framework and VPN Applicability.
Proposed TC Issues Process Martin Chapman. Purpose An issues driven process helps to 1.Untangle un-conflate problems 2.Narrow focus to solving particular.
IAQG Legal Entity Project IAQG Montreal General Assembly Report 11 October, 2013 Philippe Martin V1.
OData Technical Committee Kick-off July 26, 2012.
ESMO Clinical Practice Guidelines: Consensus Conference (CC) SOP Edited by EDC-SC September 2013.
WS-RF TCMay 2005 F2F 1 WS-RF Technical Committee May 2005 Face-to-face Agenda.
Christer Eriksson 11 March 2010 JWG1 - Wind Turbine Gearboxes IEC/ISO Design Requirements for Wind Turbine Gearboxes.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
BPEL F2F Jan 10 – 12, Proposed agenda Jan Administrative start up –attendance, quorum, minute takers –Review/accept minutes from previous.
- Sponsored by UK MOD ISO edition 2 Rob Bodington, Phil Spiby.
SDD TC Face to Face Mtg May Schaumburg, IL
Learning Objects Metadata IEEE P Learning Technology Standards Committee London, UK March 16, 2000 Chair: Wayne Hodgins.
Report from the Abstract Process Clarification Sub- Committee Monday June 21, 2004.
Length Mass Prepackages Health Environment Safety Trade Volumes Flow Energy Pressure Concentration Enforcement C. Ehrlich, 46. CIML Approval of.
PROMCODE Technical Committee Convener Call 14 February
TOSCA Technical Committee Kick-off December 12, 2011.
SCA TCs Proposed Issues Process Martin Chapman, Assembly Co-chair Anish Karmarkar, BPEL Co-chair Ashok Malhotra, Policy Co-chair Mike Edwards, Assembly.
Doc.: IEEE /011 Submission January 2000 Al Petrick, ParkerVision TGd IEEE – TGd Jan 10 –15, 2000 Tel Aviv, Israel.
Length Mass Prepackages Health Environment Safety Trade Volumes Flow Energy Pressure Concentration Enforcement R. Schwartz, 46. CIML Acceptance.
Dual Logo Procedures Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 November 2004.
IEEE Systems Council SRC Review June 2008 Bob Rassa Oct 3, 2008.
PQRI Project Update Title of Work Project Date of Submission.
Doc.: IEEE /1442r2 Submission December 2012 Marc Emmelmann, Fraunhofer FOKUSSlide 1 TGai Draft Review Overview Date: Authors:
OData Technical Committee Convener Call June 5, 2012.
Agenda Start up admin: roll call, approve agenda, appoint minute takers, approve last meeting minutes Review and approve latest draft of spec Issue discussion:
Doc.: IEEE /xxxxr0 Submission July 2007 Terry Cole, AMDSlide Common Editorial Comment Resolution Process Date: Authors:
Note At the 2008/03/12 TC meeting the BPEL4People TC formally adopted the SCA TC issue process for issue resolution. The following slides document v3 of.
Doc.: IEEE /1054r1 Submission July 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-report-minutes-july-2011 Date: Authors:
SDD TC Face to Face Mtg May Schaumburg, IL
Contents Major issue states and transitions Tools.
Doc.: IEEE a Submission Sept 2004 Tom Siep, TMS Assoicates, LLCSlide 1 Project: IEEE P Working Group for Wireless Personal.
CLUE WG IETF-85 Mary Barnes (WG co-chair) Paul Kyzivat (WG co-chair)
Preparation of the Self-Study and Documentation
September 2008 doc.: IEEE /1003r0 July 2011
TGn Editor Report Jan 2009 Date: Authors:
Proposed TC Issues Process
doc.: IEEE /479r0 Mika Kasslin TGh chair
ISO Task Group Update Wayne Mabry.
Potential Milestones A timeline to finish in one year
TC Process Specification Flow
Standards Break Out Session
OASIS Electronic Trial Master File Standard Technical Committee Meeting Agenda Comment Review Period January 5, :00 – 10:00 AM PDT.
WS-RX TC Process for Specification Development
Submission Title: [TGn Liaison Report] Date Submitted: [23Sept2005]
<month year> doc.: IEEE < e> <July 2018>
<month year> doc.: IEEE < e> <September 2018>
ARC-agenda-report-minutes-july-2011
ISO TC67/SC4 Annual Meeting
Draft D4.01 status report Date: Authors: February 2010
Meetings.
Personal Info Entry Employees can see or update employee card fields.
AHT Title Goes Here Name (s), Organization, CEOS Affiliation
TGaj Editor Report for CC22
TGn Frame Format AdHoc Operation
Result: Yes - ; No - ; Abstain - .
TGp Closing Report Date: Author: September 2007 Month Year
Task Group G Report January 17, 2003
Liaison Report Date: Authors: September 2010
FFIoT Status Report – IEEE 802 Nendica
Mesh Study Group (MES SG) Report IEEE , Jan 12-16, 2004
ARC-agenda-report-minutes-july-2011
[Ballot code, contract number] [Project title]
[Ballot code, contract number] [Project title]
TGn-LB97-General-adhoc-report
Discussion on The EHT Timeline and PAR Definition
Presentation transcript:

WS-RX TC Process for Specification Development TC discussion to understand the issue, its scope, etc TC agrees upon resolution A TC Member Raises an issue. TC Review TC Vote for CD TC decides to log the issue WD y WD z CD a WD x Spec Status Queue for Editors Issue Status Active Editor- Pending Editor- Done Resolved Closed WD: Working Draft CD: Committee Draft

Issues Life Cycle TC members raise issues via email by following the suggested template. Only issues that are agreed upon and minuted in the conf-calls and F2F meetings are logged. Issue Status: Active  TC accepted an issue submission Open issues are discussed via email, during conf-calls and F2F meetings. Resolutions are agreed upon and minuted during conf-calls and F2F meetings Issue Status: Editor-Pending Editors update the specs to incorporate the resolution of Editor-Pending issues Issue Status: Editor-Done Light weight process for reviewing Editor-Done issues (e.g. one or more TC members volunteer and review the changes to the spec) Issue Status: Resolved Formal TC vote for CD brings to closure the new issues addressed by the voted revision Issue Status: Closed