WS-RX TC Process for Specification Development

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

PWG-CIM Realignment Project Rick Landau Dell 12 July 2005.
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
Planning DITA 1.3 Kristen James Eberlein Eberlein Consulting.
The Wisconsin Program. History 1985 – Idea was born – Shawano 1985 – Idea was born – Shawano Good men in town – couldn’t ASK them! Good men in town –
OASIS Web Services Distributed Management Technical Committee July Face to Face IBM Raleigh, NC.
Proposed TC Issues Process Martin Chapman. Purpose An issues driven process helps to 1.Untangle un-conflate problems 2.Narrow focus to solving particular.
OData Technical Committee Kick-off July 26, 2012.
AP CAPSTONE Seminar Week 2.5: 11/3-7.
ESMO Clinical Practice Guidelines: Consensus Conference (CC) SOP Edited by EDC-SC September 2013.
WS-RF TCMay 2005 F2F 1 WS-RF Technical Committee May 2005 Face-to-face Agenda.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
ISO edition 2 Publication plan R. Bodington Eurostep Limited ISO edition 2.
BPEL F2F Jan 10 – 12, Proposed agenda Jan Administrative start up –attendance, quorum, minute takers –Review/accept minutes from previous.
- Sponsored by UK MOD ISO edition 2 Rob Bodington, Phil Spiby.
Learning Objects Metadata IEEE P Learning Technology Standards Committee London, UK March 16, 2000 Chair: Wayne Hodgins.
Report from the Abstract Process Clarification Sub- Committee Monday June 21, 2004.
Length Mass Prepackages Health Environment Safety Trade Volumes Flow Energy Pressure Concentration Enforcement C. Ehrlich, 46. CIML Approval of.
ARIP Technical Committee Convener Call 07 April
CTI Technical Committee Convener Call 11 May
PROMCODE Technical Committee Convener Call 14 February
TOSCA Technical Committee Kick-off December 12, 2011.
SCA TCs Proposed Issues Process Martin Chapman, Assembly Co-chair Anish Karmarkar, BPEL Co-chair Ashok Malhotra, Policy Co-chair Mike Edwards, Assembly.
Length Mass Prepackages Health Environment Safety Trade Volumes Flow Energy Pressure Concentration Enforcement R. Schwartz, 46. CIML Acceptance.
Doc.: IEEE /1442r2 Submission December 2012 Marc Emmelmann, Fraunhofer FOKUSSlide 1 TGai Draft Review Overview Date: Authors:
OData Technical Committee Convener Call June 5, 2012.
Doc.: IEEE /1623r0 Submission November 2006 Jim Petranovich, Conexant Systems, Inc.Slide 1 PHY Ad Hoc Nov 1 Agenda and Minutes Notice: This document.
Agenda Start up admin: roll call, approve agenda, appoint minute takers, approve last meeting minutes Review and approve latest draft of spec Issue discussion:
Note At the 2008/03/12 TC meeting the BPEL4People TC formally adopted the SCA TC issue process for issue resolution. The following slides document v3 of.
Doc.: IEEE /1054r1 Submission July 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-report-minutes-july-2011 Date: Authors:
Contents Major issue states and transitions Tools.
PACR Technical Committee Convener Call 09 January /9/131.
Preparation of the Self-Study and Documentation
TEXAS NODAL (ERCOT REVISIONS)
FGDC Metadata Working Group
TGn Editor Report Jan 2009 Date: Authors:
May 16 WS BPEL TC Agenda 7:00 Welcome and Introductions
ISO TC 108 SC3 Liaison to CCAUV
PERB SharePoint Voting Procedure
Proposed TC Issues Process
. - t !!l t. - 1f1f J - /\/\ - ' I __.
Complaint Process Overview
ISO Task Group Update Wayne Mabry.
Potential Milestones A timeline to finish in one year
TC Process Specification Flow
.. '.. ' 'i.., \. J'.....,....., ,., ,,.. '"'". ' · · f.. -··-·· '.,.. \...,., '.··.. ! f.f.
TGn Editor Report Jan 2009 Date: Authors:
Standards Break Out Session
Memorandum of Understanding
OASIS Electronic Trial Master File Standard Technical Committee Meeting Agenda Comment Review Period January 5, :00 – 10:00 AM PDT.
WS-RX TC Process for Specification Development
Submission Title: [TGn Liaison Report] Date Submitted: [23Sept2005]
<month year> doc.: IEEE < e> <July 2018>
TGac MU-MIMO ad-hoc report Nov 09
ARC-agenda-report-minutes-july-2011
doc.: IEEE /479r0 Mika Kasslin TGh chair
ISO TC67/SC4 Annual Meeting
Session #5 Closing Status November , 2003
TGaj Editor Report for CC22
IEEE OmniRAN TG Status Report to IEEE 802 WGs
NDIA Intent Guide Update for EVMIG.
802.1Qcj D0.4 Status.
FFIoT Status Report – IEEE 802 Nendica
ARC-agenda-report-minutes-july-2011
FFIoT Status Report – IEEE 802 Nendica
European Standardization
Wealth Management Meeting Asset Management Execution
Standards Review Subcommittee Update
Presentation transcript:

WS-RX TC Process for Specification Development TC discussion to understand the issue, its scope, etc TC agrees upon resolution A TC Member Raises an issue. TC Review TC Vote for CD TC decides to log the issue WD y WD z CD a WD x Spec Status Queue for Editors Issue Status Open- Unassigned Open- Assigned Editor- Pending Editor- Done TC- Reviewed Closed WD: Editors Draft CD: Committee Draft

Issues Life Cycle TC members raise issues via email or during conf-calls/F2F meetings. Only issues that are agreed upon and minuted in the conf-calls and F2F meetings are logged. Issue Status: Open-Unassigned  No member actively working on resolution Open-Assigned  TC member(s) volunteered to propose resolution Open issues are discussed via email, during conf-calls and F2F meetings. Resolutions are agreed upon and minuted during conf-calls and F2F meetings Issue Status: Editor-Pending Editors update the specs to incorporate the resolution of Editor-Pending issues Issue Status: Editor-Done Light weight process for reviewing Editor-Done issues (e.g. one or more TC members volunteer and review the changes to the spec) Issue Status: TC-Reviewed Formal TC vote for CD brings to closure the new issues addressed by the voted revision Issue Status: Closed