North Dakota’s SDWIS Prime transition plan and factors influencing it

Slides:



Advertisements
Similar presentations
Bringing it all Together Sierra as Library Services Platform Today and Tomorrow Next Generation Library Services Platform Steven Nielsen Vice President-
Advertisements

Continuing the work of the Bill & Melinda Gates Foundation Presented by: Jeff Stauffer WebJunction Service Manager Date: 3 February 2005.
Kuali Rice at Indiana University From the System Owner Perspective July 29-30, 2008 Eric Westfall.
External Data Access 5/29/08. Current Problems No way to load, process & analyze live Atlas data via critical analysis & programming tools (SAS, R, Perl)
The Future of Drupal and Content Delivery
What we plan to do and why
Grant Search & Submission
2017/18 SIP Request Process September 2016.
Who’s in Charge: Self-Directed Supports
GeorgiaFIRST Financials V9 Upgrade Web Conference November 21, 2014
POLICY COUNCIL MEETING
Moving to the Realm from The City
What’s new with Power BI /guyinacube.
Let’s talk Power BI Premium /guyinacube Adam Saxton.
Dynamics New Features, Important Changes, & How to Prepare
Student and Community Participatory Research in Southwest Baltimore
Open All Areas Difficulties met in the process
by Jakob Gray, and Sara Inglis, Jerry Sun
Northwest Portland Area Indian Health Board Quarterly Meeting
The Urban Forest Management Plan
Order Management For Shippers.
Getting Ready for the Next Recession
SDWIS: API Proof of Concept and Demo
The Future is Data Linking: Using DaSy TA to Position Your Program
Engaging Families in Special Education
Identity and Access Management Program Update CIO Council Update
North Carolina’s Transition to CMDP
Justin Wright, OGWDW Infrastructure Branch and Harold Valle, Systalex
Interfacing Applications Solutions
Continum of Care Reform (CCR)
Review of SDWIS Prime Development and Implementation Plans
SDWIS Prime: Kickoff Meeting – Overall System Demo October 23, 2017
HRA User Satisfaction Report
SDWIS Prime REST APIs Elinor Keith
NATIONAL INTERAGENCY LOGISTICS WORKSHOP Forest Service Update 2008
DWP Operational Stakeholders Engagement Forum - 22 January 2014 Universal Credit Jean Cooling Department for Work and Pensions.
U.S. Environmental Protection Agency
Michael Stephenson DevOps empowered by Microsoft Flow
Get CLUed into VICTR Services and Support
National Monitoring Steering Committee Report
Exchange Network (EN) Grant: Drinking Water Watch (DWW) Modernization
Electronic Prescription Service (EPS)
Compliance Monitoring Data Portal (CMDP)
Transition to CMDP and SDWIS Prime
U.S. Environmental Protection Agency
Organizational Consulting
SEND LOCAL AREA INSPECTION
CMDP: NC Experience.
SDWIS Prime Transition Assistance and Tools
Michael Plastino Infrastructure Branch Chief
EJ Grom, The Group, LLC Trang Le, EPA
1915(i)& (k) Implementation Update
Transitioning into Prime Pilot Phase & Implementation Phase
ASDWA Data Management User Conference
Doing the Best We Can With What We Have
Welcome Traceability Software Integrators
Resolving Data Quality Issues Prior to Transition
Creating a National Radon Database
Justin Wright, OGWDW Infrastructure Branch July 11, 2018
Finance & Planning Committee of the San Francisco Health Commission
Long-Term Financial Model & Ontario AM Working Group Meeting
Learning Management System (LMS) Alignment Meeting April 02, 2019
Identifying work opportunities in the context of the labour market
Review of Progress in Year 1 Looking to Year 2
Next Generation HR and Pay National Capital Region
Unplanned Care Workstream Emerging plans for 2019/20 CCF, July 2018
SDWIS Prime & Compliance Monitoring Data Portal
WORKSHOP Establish a Communication and Training Plan
NMDWS Internship Portal
Presentation transcript:

North Dakota’s SDWIS Prime transition plan and factors influencing it North Dakota Department of Health Barrett Brown 7/12/18

Philosophy statements North Dakota is firmly committed to probably moving to SDWIS Prime sometime. Since the transition will depend on many factors, we’ll see how and when things go forward. However, since ND does not have funding or desire to develop our own system and since SDWIS/State is not on a sustainable architecture, we don’t have many options. SDWIS Prime Transition Plan 7/12/2018

Current Preparations Begun implementation of CMDP Admin accounts, DSE in place, lab admin in process Why now? We have many internal reasons for doing this now versus waiting. (i.e. data quality, modern technology, EPA funded tool) IAWG State Co-Chair Stay informed on happenings and help steer the process EN Grant for the development of tools to connect to the SDWIS Prime APIs Partner on 2 others SDWIS Prime Transition Plan 7/12/2018

Obstacles / challenges / headaches SDWIS Prime development timeline My time, pulled in too many directions, learning how to use APIs Department reorganization Budget Staff turnover (18 mo) (Stage 2, GWR, RVOC, N/N, PIOC, Arsenic, RADS, PBCU, FL) Project burnout 2008 SDWIS Lifecycle discussion (5 options) 2009 (SLC) – post DMUC NextGen announcement (option 6) Recent work on Prime Core, APIs, Bulk Upload, and LRDR has helped SDWIS Prime Transition Plan 7/12/2018

Crystal Ball prediction ND is very likely to move to SDWIS Prime, but when depends on many items. Hoping to be in production with CMDP yet this year, but many factors outside our control. Post Transition Environment Interfacing applications that use the APIs Maybe none, hopefully DWW, depends on Indiana led multi-state EN Grant to update DWW Interfacing applications that use ODBC to connect to the LRDR Expect our existing IA’s will connect to the LRDR initially. The refresh interval of the LRDR will also be a factor, so we’ll see. Use existing state node for LRDR sync SDWIS Prime Transition Plan 7/12/2018

Serious Note I am hoping that the culture of sharing and cooperation between primacy agencies will be at an all-time high after Prime is released. (like the SDWIS/State 7/8 days) I am looking forward to when the first easily sharable tool is developed that allows agencies to query SDWIS Prime via the APIs, similar to the Relation.mdb database. I am hoping the monthly Prime calls shift from just a Prime/CMDP update delivery tool by EPA to a highly interactive community information sharing forum. (like the SDWIS/State 7/8 days) SDWIS Prime Transition Plan 7/12/2018

So, when is nd transitioning Needed items LRDR Bulk data upload UI is a functional replacement (+/-) Data migration process and BRE has been fully tested against ND’s implementation of SDWA Estimate 6-12 months of testing Hope to begin testing in 2019 and potential migration in 20?? Assuming IE/Windows updates don’t render SDWIS/State completely inoperable Assuming no significant contractor work to update interfacing apps to work with APIs, if so, add more time SDWIS Prime Transition Plan 7/12/2018

Questions? Barrett Brown North Dakota Department of Health 701.328.5209 bjbrown@nd.gov SDWIS Prime Transition Plan 7/12/2018