Capacity Methodology Statements

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Entry and Exit Investment Process Outline Transmission Planning Code Workshop 3 5 th June.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transfers and Trades Transmission Workstream
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Review Group 221: Option 3 – security provided after allocation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
September 2008 QSEC auction - Allocations Transmission Workstream
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
Trades and Transfers Workshop, 6 th November 2007.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
Transfers and Trades Special Transmission Workstream
NTS Exit Regime Transmission Workstream – 6 th July 2005.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Interactions with the implementation of RIIO-T1
Transitional Exit Capacity Proposals -Update
Exit Capacity Release Methodology Statement
Transmission Planning Code – Draft Document
Transmission Workstream, 01 October 2009
Non-approved draft Transmission Workstream, 6th December 2007
Exit Capacity User Commitment – Transmission Workstream update
Transmission Workstream, 2nd March 06
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
Entry Capacity - update
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
Annual Review - Methodology Statements
Exit Capacity Substitution and Revision
Update on Exit Capacity Substitution and Revision
Development of Entry Capacity Substitution
QSEC auction timetable
Entry Capacity Substitution
UNC Transmission Workstream 7th December 2006
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Entry Capacity Transfer and Trade
Transmission Workstream – 6th July 2005
Richard Fairholme E.ON UK
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
Transmission Workstream 1st February 2007
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Incremental Entry Capacity Release Methodology Statement
Modification 0043 – Limitation on offering for sale unsold capacity
Entry Capacity Transfers - Constrained Period
Presentation transcript:

Capacity Methodology Statements Transmission Workstream 7th June 2007

Capacity Methodology Statements Constrained Period Unconstrained Entry Entry Capacity Transfer and Trade Methodology Statement Entry Capacity Substitution Methodology Statement Incremental Entry Capacity Release Methodology Statement Exit Exit Capacity Baseline Revision Methodology Statement Exit Capacity Release Methodology Statement (Interim & Enduring)

Methodology Statement – Timetable Consultation start Consultation end Comment Capacity Transfer and Trade 2nd May 30th May Incremental Entry Capacity Release 16th May 5th June Entry Capacity Substitution 18th May 15th June See later slides Exit Capacity Release (Interim) 13th June (Enduring) TBC Linked to implementation of mod 116A Exit Capacity Baseline Revision Applies to Enduring Exit regime

Entry Capacity Substitution Transmission Workstream 7th June 2007

Proposed new licence condition Background Proposed new licence condition Aims to minimise investment needed to satisfy incremental demand for NTS Entry Capacity Process initiated by User capacity requests in the QSEC auction.

Users bid in QSEC auctions Process Users bid in QSEC auctions NG assesses bids in accordance with IECR methodology. Bids pass economic test Incremental capacity released (subject to lead time) Network Analysis of incremental capacity identifies system unable to satisfy requests without reinforcement. Opportunities for capacity substitution investigated. Consider within zone substitutions first Consider recipient ASEP with lowest Revenue Driver first Consider nearest (by pipeline length) donor ASEP first

Conditions for Substitutions Satisfactory User commitment through QSEC auctions No incremental change in buy back risk. No compromise of existing commitments (e.g. offtake pressures). Where, after exhausting all substitutions, a residual requirement for reinforcement remains and this reinforcement is uneconomic due to economies of size, then some substitutions may be rejected. An upper limit on the exchange rate may apply (subject to consultation) to avoid excessive loss of capacity at donor ASEPs.

Key Issues Users have no involvement in the process after submitting QSEC auction bids. Substitutions have no impact on NG’s obligation to make capacity available to the User. Unsold baseline capacity (in the QSEC auction) at any ASEP may be substituted to another ASEP and will not be available in subsequent auctions. Capacity NOT available in the QSEC auction will NOT be substituted to another ASEP.

Theoretical Example – St. Fergus

Theoretical Example: Effects of Entry Capacity Substitution

Interim Exit Capacity Release Transmission Workstream 7th June 2007

Previous version updated, no major changes. Background Previous version updated, no major changes. Duration extended for delay to implementation of Enduring Exit regime. Initial Volume Allocations (NTS/LDZ offtakes) updated based on latest OCS. Flex capacity values removed because incremental (flex) capacity is not released. Exit Baseline Revision (to account for effects of substitution) does not apply to interim / transitional period.