Explanation of the comment I made at the 06/07/06 APC

Slides:



Advertisements
Similar presentations
LONGITUDINAL (IN)STABILITY WITH BATCH INJECTION T. Argyropoulos, P. Baudrenghien, C. Bhat, J. E. Muller, T. Mastoridis, G. Papotti, E. Shaposhnikova,
Advertisements

March 14-15, 2007ECloud Feedback, IUCF1 Electron-Cloud Effects in Fermilab Booster K.Y. Ng Fermilab Electron-Cloud Feedback Workshop IUCF, Indiana March.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
High Intensity Beams Issues in the CERN Proton Synchrotron S. Aumon EPFL-CERN Aumon Sandra -PhD Defense1.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
1 Three views on Landau damping A. Burov AD Talk, July 27, 2010.
Elias Metral, CERN-PS seminar, 12/04/20001 u Introduction, observations and motivation u Theory u Experiments u Conclusion STABILISING INTENSE BEAMS BY.
Update of the SPS transverse impedance model Benoit for the impedance team.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Effect of nonlinearity on Head-Tail instability 3/18/04.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
Instability rise-time far above the TMCI threshold: Comparison between simple theory, MOSES and HEADTAIL E. Benedetto, E. Metral Acknowledgements: G. Rumolo,
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities beam diagnostics and fundamental limitations to the performance.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
Crossing transition at RHIC V.Ptitsyn, N.Abreu, M. Brennan, M.Blaskiewicz, W. Fischer, C. Montag, R. Lee, S.Tepikian.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
Elias Métral, LIS meeting, 29/01/2008 1/26 GAMMA TRANSITION JUMP FOR PS2 W. Bartmann, M. Benedikt, E. Métral and D. Möhl u Introduction with the case of.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
PS beam dynamics issues in view of LHC beams upgrade: brief status and prospects G. Rumolo (Beam Dynamics for the PSB/PS Upgrade Working Groups), based.
HEADTAIL simulation during the accelerating ramp in the PS S. Aumon - EPFL & CERN Acknowledgement to B. Salvant, G. Rumolo.
Elias Métral, CERN-GSI bi-lateral working meeting on Collective Effects – Coordination of Theory and Experiments, GSI, 30-31/03/06 1/15 TRANSVERSE LANDAU.
INTRODUCTION FOR THIS (2nd) REVIEW ON LPL (LHC PERFORMANCE LIMITATIONS) => DURING RUN II ( ) E. Métral Follow-up of (1st) review on LPL during.
Y.Papaphilippou Thanks to
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Loss of Landau damping for reactive impedance and a double RF system
generation and stability of intense long flat bunches
Transverse Damping Requirements
Longitudinal impedance of the SPS
Space charge studies at the SPS
DELPHI and Vlasov solvers used at CERN
The HEADTAIL Development Working Group (HDWG)
Longitudinal beam parameters and stability
Proposals for 2015 impedance-related MD requests for PSB and SPS
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
MD2490 Measurement of the TMCI threshold at flat-top
Benchmarking the SPS transverse impedance model: headtail growth rates
MD2490: Measurement of the TMCI Threshold at Flat-Top
Multiturn extraction for PS2
Invited talk TOAC001 ( min, 21 slides)
Summary of Space-Charge Measurements, 2011
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
G. Arduini, R. Calaga, E. Metral, G. Papotti, G. Rumolo, B. Salvant, R
E. Métral, G. Rumolo, R. Tomás (CERN Switzerland), B
Recent developments of the HEADTAIL code and benchmarking
Chromaticity can make a difference…
STABILITY OF THE LONGITUDINAL BUNCHED-BEAM COHERENT MODES
Saturday – Morning 7:36 beams dumped
W. Bartmann, M. Benedikt, E. Métral, D. Möhl, G. Rumolo and B. Salvant
LHC impedance: Comparison between phase 1 and IR3MBC – follow-up
News on TMCI in the SPS: Injecting high intensity bunches
Beam dynamics requirements after LS2
Simulating transition crossing in the PS with HeadTail
STABILISING INTENSE BEAMS
Observation of Transverse Mode Coupling Instability at the PS and SPS
SPS collective effects Hannes, Gianni, Giovanni, Benoit, Yannis
Collective effects in the SPS and LHC (longitudinal plane)
CERN-SPS horizontal instability
LHC collimation review follow-up Impedance with IR3MBC option & comparison with phase 1 tight settings N. Mounet, B. Salvant and E. Métral Acknowledgements:
Accelerator Physics Statistical and Collective Effects II
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Presentation transcript:

Explanation of the comment I made at the 06/07/06 APC CROSSING TRANSITION WITH TMCI Explanation of the comment I made at the 06/07/06 APC E. Métral Since the work of Pellegrini&Sands1969 on the (low-intensity) Head-Tail instability, the sign of the H and V chromaticities is changed when the transition is crossed (i.e. when the sign of the slip-factor  changes)  The chromatic frequency is kept positive Before, the Head-Tail instability above transition was damped (e.g. in the PS) using Landau octupoles It is proposed now not only to change the sign of the chromaticity when the transition is crossed but to correlate its variation with the one of the slip-factor (due to TMCI reason)

 = 0 in the stable situation below transition TMCI intensity threshold Consider the case below transition ( < 0 and  < 0) where a TMCI is stabilized by decreasing  and let’s call  = 0 in the stable situation below transition During transition crossing (and after), one wants to keep   0 Increasing the longitudinal emittance (e.g. in the PS) would not be required anymore  = 0  This could (should) be checked with HEADTAIL first

IN THE SPS  The chromaticity has to follow the slip factor which is given below (thanks to Elena Shaposhnikova) for the CNGS or SFTPRO beam

IN THE PS  The chromaticity has to follow the slip factor which is given below (thanks to Michel Martini) near transition only Without -jump With -jump