Analysis SLP RMS Error – Case #1 : Verified versus GFS Analysis

Slides:



Advertisements
Similar presentations
Commitment schemes Commit stage Reveal stage m m S mm.
Advertisements

East Coast vs. West Coast: A Documentation of Model Forecast Failures for Eta, NAM, GFS, GEM, and ECMWF Garrett Wedam Lynn McMurdie, Cliff Mass.
GFS (green), ECMWF (blue) 500 mb height 00 hr forecasts 12z 24 Dec
Vaisala/University of Washington Real-observation Experiments Vaisala/University of Washington Real-observation Experiments Clifford Mass, Gregory Hakim,
 M&M EDUCATIONAL CASE REVIEW Date 1.  CASE # 2.
3-4 Notes. Proving a Journal Page 1)Add each of the amount columns 2)Add the debit column totals, and then add the credit column totals. 3)Verify that.
1. LM 2. LM 3. LM L M M L L M 4. GF 5. GF 6. GF G F F G G F.
1 WRF-EnKF Lightning Assimilation Real-Observation Experiments Overview Cliff Mass, Greg Hakim, Phil Regulski Department of Atmospheric Sciences University.
实验十四 紫外线灭菌  一、实验背景及目的:  灭菌是一种杀灭微生物的措施。紫外线灭菌 是物理灭菌因素之一。  1. 了解紫外线灭菌的原理;  2. 学习、掌握紫外线灭菌的方法。 版权所有 未经作者同意 请勿使用.
第四部分 生态系统生态学 生态系统的主要类型与分布 高建芳
The reading is 7.38 mm. The reading is 7.72 mm.
Date of download: 7/8/2016 Copyright © ASME. All rights reserved. From: Characterization of Human Dental Pulp Tissue Under Oscillatory Shear and Compression.
Date of download: 9/18/2016 Copyright © ASME. All rights reserved. From: Derivation of Optimum Profile Modifications in Narrow-Faced Spur and Helical Gears.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
Notes for Interpretation
Significant Figures Packet
From: An Environmental and Cost Analysis of Stamping Sheet Metal Parts
Date of download: 10/22/2017 Copyright © ASME. All rights reserved.
WRF-EnKF Lightning Assimilation Real-Observation Experiments Overview
Date of download: 11/4/2017 Copyright © ASME. All rights reserved.
From: Saccadic suppression during voluntary versus reactive saccades
Date of download: 11/11/2017 Copyright © ASME. All rights reserved.
Copyright © American Speech-Language-Hearing Association
Checklist For Acting Upon A PAR: Required Employee Information
From: Brillouin Microscopy of Collagen Crosslinking: Noncontact Depth-Dependent Analysis of Corneal Elastic Modulus Invest. Ophthalmol. Vis. Sci ;54(2):
Date of download: 12/26/2017 Copyright © ASME. All rights reserved.
From: Perceived surface color in binocularly viewed scenes with two light sources differing in chromaticity Journal of Vision. 2004;4(9):1. doi: /4.9.1.
1. 2. ? ? Delete this text and put in here: Date of the Talk, location, … (max: 1 line) Put in here: Name of the speaker, function, affiliation, … (max.
What temporal averaging period is appropriate for MM5 verification?
From Account: Successful Status: Reference number: Transaction date: 3 May :33:21 Amount:Amount: (RM14,000.00J Beneficiary Name : Receiving.
Current GBT Performance
آشنايی با اصول و پايه های يک آزمايش
Aviation Forecast Guidance from the RUC
Data Analysis Empirical Distributions Industrial Engineering
Forecast Pressure.
Forecast Pressure.
Nikhef/Bonn LepCol meeting
Presented by: David Groff NOAA/NCEP/EMC IM Systems Group
NEW PRODUCT ANNOUNCEMENT SPEAKERS/MOBILE THEATER
RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
QuickBooks Error 1904 Visit us:
Forecast Pressure.
New Developments in Aviation Forecast Guidance from the RUC
Composite Method Results Artificial Cases April 2008
Forecast Pressure.
Real-time WRF EnKF 36km outer domain/4km nested domain D1 (36km)
Converting Vacation to Banked Leave
Volume of Pyramids and Cones
o r g a n i z a t i o n a l b e h a v i o r
Converting Carryover Vacation to ALRA
Exercise Find quality estimates for round 3 (Estonia) items B37, B38 and B39. If observed correlations between B37 and B38 is .439; B37 and B39 is .441;
15/02/2019 MRSO Update Aileen O Connor 15/02/2019.
Standardized versus Unstandardized Regression Coefficients
Augmenting Path Algorithm
Total percent Service Referred Treated Surgery Delivery Transfused
Notes Over 7.4 Finding an Inverse Relation
Data Sheet Goals: Student DOB Age Teacher Minutes IEP Due
SMART Goal Template S What do you want to accomplish or change?
Lightning Assimilation Techniques
A NEW APPROACH. A NEW APPROACH WHAT CAUSED THE MAINE DOT TO CONSIDER CBE? LACK OF COMPETITION VOLITILE MATERIAL COST LACK OF FUNDING CONTRACTOR TAKING.
Augmenting Path Algorithm
CRICKET AND MEALWORM BEHAVIOR CHART
Getting Started In Concur
Thing / Person:____________________ Dates:_________________
Record your QUESTIONS as your read.
CATEGORY A CATEGORY B CATEGORY C CATEGORY D
3 3 R2 R2 R1 R1 RM R3 R3 R4 R v0 v0 Problem 1 (100%)
Types of Errors And Error Analysis.
Dinosaur Research Report
Fig. 2. The pain score change in vitamin C group
Presentation transcript:

Analysis SLP RMS Error – Case #1 : Verified versus GFS Analysis Date Control LTNG2 # of ltng obs. LTNG4 6hr LTNG4 1hr LTNG4 1hr 5mm # of ltng obs 12/16/2002 – 00 1.83 1.55 12 1.50 5 1.48 1.52 10 12/16/2002 – 06 1.86 2.03 21 1.85 11 23 12/16/2002 – 12 1.94 1.98 66 24 1.91 1.97 58 12/16/2002 – 18 1.65 1.59 35 1.57 1.60 40 12/17/2002 – 00 1.42 1.47 76 1.27 31 1.29 12/17/2002 – 06 1.30 1.43 94 1.41 47 1.37 113 12/17/2002 – 12 1.62 1.18 42 1.38 1.33 102 12/17/2002 – 18 1.39 1.35 27 54 12/18/2002 – 00 1.75 1.76 16 1.45 1.49 52 12/18/2002 – 06 1.93 79 2.05 44 1.44 114 12/18/2002 – 12 1.23 1.36 129 1.24 61 193 12/18/2002 – 18 2.09 145 74 2.00 1.96 173 12/19/2002 – 00 1.79 175 1.82 81 1.63 1.53 202 12/19/2002 – 06 195 104 227 12/19/2002 – 12 1.58 185 1.54 121 1.74 213 12/19/2002 – 18 1.51 117 51 125 12/20/2002 – 00 2.04 1.69 46 28 59 12/20/2002 – 06 15 1.84 48 12/20/2002 – 12 1.46 55 12/20/2002 – 18 1.28 8 1.26 1.32

Analysis H500 RMS Error – Case #1 : Verified versus GFS Analysis Date Control LTNG2 # of ltng obs. LTNG4 6hr LTNG4 1hr LTNG4 1hr 5mm # of ltng obs 12/16/2002 – 00 12.1 13.6 12 11.8 5 11.7 11.5 10 12/16/2002 – 06 21.0 20.8 21 17.9 11 17.6 23 12/16/2002 – 12 20.2 16.0 66 15.8 24 14.9 15.3 58 12/16/2002 – 18 21.4 20.6 35 19.1 40 12/17/2002 – 00 21.3 21.5 76 20.0 31 18.7 12/17/2002 – 06 22.0 94 19.9 47 20.1 113 12/17/2002 – 12 22.6 22.5 19.5 42 20.4 19.8 102 12/17/2002 – 18 26.4 26.3 22.3 27 24.0 23.2 54 12/18/2002 – 00 21.2 21.9 16.9 16 17.7 52 12/18/2002 – 06 26.1 24.5 79 22.1 44 22.4 114 12/18/2002 – 12 129 18.2 61 18.1 16.5 193 12/18/2002 – 18 20.9 145 74 173 12/19/2002 – 00 19.6 175 15.7 81 18.3 202 12/19/2002 – 06 195 104 18.4 227 12/19/2002 – 12 16.4 185 14.5 121 15.4 13.7 213 12/19/2002 – 18 117 16.3 51 17.3 16.8 125 12/20/2002 – 00 16.1 46 13.4 28 14.1 13.0 59 12/20/2002 – 06 17.1 15 19.3 48 12/20/2002 – 12 11.2 10.6 10.5 55 12/20/2002 – 18 8 13.2 13.8