Changes to the construction survey (i)

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

Republic of the Philippines NATIONAL STATISTICAL COORDINATION BOARD 1 International Workshop From Data to Accounts: Measuring Production in National Accounting.
Construction Technologies. The study and application of building or assembling a structure. All people are affected in one way or another by construction.
Civil engineer is the person who is responsible for the planning and construction of structures such as buildings, roads, bridges, dams and ports. His.
Welcome to BUILDSOFT Global Estimating System
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Chapter 11 APPRAISAL METHODS 371. The appraiser uses three appraisal methods and then correlates this data to arrive at a final valuation for a property.
Q Q Q Q Q Q Annual Average Prices Health & Education Health & Education Health & Education Construction & Equipment.
CONSTRUCTION INDUSTRY OVERVIEW AND FACTS. VALUE OF CONSTRUCTION Construction put in place during June 2002 was estimated at a seasonally adjusted annual.
ESTUDIOS MONETARIOS Y FINANCIEROS THE IMPACT OF FINANCIAL VARIABLES ON FIRMS’ REAL DECISIONS: EVIDENCE FROM SPANISH FIRM-LEVEL DATA Ignacio Hernando Carmen.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Urban and rural areas An introduction. What is an urban area? built-up area.
KABLESHKOVO - HIJATA PROJECT. THE CONCEPT  EXTENSIVE RESORT DEVELOPMENT  NEARBY THE UPCOMING 18-HOLE GOLF PROJECT  COMBINATION OF A HOTEL PART AND.
Fluid Mechanics –I Surveying –I Mechanics of Solids Building Materials
Chapter 5: Elasticity. Elasticity A general concept used to quantify the response in one variable when another variable changes.
8.1.4 Can it still be factored? Factoring Completely I can factor out a common factor.
HIGHLIGHT Significant outcome Q 100million won unit New ordersSales Operating profitOrdinary profit Net profit 1,224 2,069 1,401 1,
1 Report to Regional Coordinators of TAG Meeting Sept 22-24, 2004.
The Main Activities of the Construction Industry (unit 3 a)
TREATING GOVERNMENT EXPENDITURE & CAPITAL FORMATION IN THE ICP David Roberts, OECD, Tunis, November 2003.
Alternate Bid on Pavement Projects Overview Keith Shannon Director, Office of Materials and Road Research Mn/DOT – ACEC Annual Consultant Conference March.
Now that I built it, How much did it Cost?
CIVIL ENGINEENING Civil engineer`s work has to do with the design, construction and maintenance of the environment, including bridges roads canals dams.
Development Appraisal Day 1 Exercises – Part I
Development of a Single Official UK House Price Index Friday 11 th March 2016.
ITAG meeting February 2009 Overlapping lists Overlapping lists in Eurostat comparisons.
French new census : method and utilization IPUMS Workshop 9 june Paris.
Edexcel BTEC Level 2 Diploma in Construction Type of Work Unit 1 Structure of the Construction Industry.
TYPES OF CONSTRUCTION Read About Industrial Construction, Residential Construction And Heavy Or Civil Construction Welcome Presented By:
Global Residential Drinking Water Treatment Equipment Market Research Report 2016 Gosreports New Study:
ΟΡΓΑΝΩΣΗ ΚΑΙ ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ 3 Ο ΜΑΘΗΜΑ. ΟΙ ΜΕΓΑΛΕΣ ΕΠΙΧΕΙΡΗΣΕΙΣ Η δημιουργία μεγάλων επιχειρήσεων είναι ένα από τα χαρακτηριστικά του 20 ου αιώνα.
Maximizing synergies in regional and global post-2011 activities Requirements and challenges for linking regional PPP updates 2 nd Regional Coordinating.
Research Agenda for the 2011 ICP Round – Priority List Prepared by the Chair of the Interim Technical Advisory Group (ITAG) for Discussion at the Interim.
12-3 Measures of Central Tendency and Dispersion
STATE OF THE HOUSING INDUSTRY IN UGANDA By Presented by:
Civil Engineer Civil Engineering is a professional engineering discipline that deals with the design construction and maintenance of the physical and naturally.
Evaluating the Use of Publicly Available Building Permit Data to Complement Data Collection and Analysis of Construction Surveys Angela Delano Economic.
Boulder Junction Town Road Improvement Project
Boulder Junction Town Road Improvement Project
Global And China Glass Fiber Reinforced Poly Formaldehyde Industry 2014 Market Research Report The report firstly introduced Glass Fiber.
Global Core List survey materials for regional PPP updates
Session I: Global core lists and survey forms
Construction Value Added
Researchers: Charlaine V. Reyes Dyeor Kristy M. Balisi Advisers:
The Perfect Marriage! Ephesians 5:21-33.
uacn property development company plc
2013 Specification Implementation
Construction Approach and Productivity Issues
February 12 – 19, 2018.
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
SUTs – data sources and bridge tables
2017 Housing advisor meeting
October 24, 2016 Global II Agenda: DO NOW: Term Matching
The Construction Industry
Replace with Title of Report / Region Represented
24/02/11 Tutorial 3 Inferential Statistics, Statistical Modelling & Survey Methods (BS2506) Pairach Piboonrungroj (Champ)
The Construction Industry
ОПЕРАТИВНА ПРОГРАМА “ИНОВАЦИИ И КОНКУРЕНТОСПОСОБНОСТ“ „Подобряване на производствения капацитет в МСП“
SUTs – data sources and bridge tables
LAMAS January 2016 Agenda Item 2.3 Annual update of the gross hourly earnings Eusebio Bezzina.
Index Notation Sunday, 24 February 2019.
2013 Specification Implementation
Solving Equations 3x+7 –7 13 –7 =.
Example Make x the subject of the formula
Measurement of construction output
Example 7 Investment The future value of $3000 invested for 3 years at rate r, compounded annually, is given by What interest rate will give a future value.
Combinations Practical Applications from
Measurement of construction output
U A B II III I IV 94.
Presentation transcript:

Changes to the construction survey (i) Reduction to 3 BHs and 7 BQs: Residential buildings Detached house Portuguese house or Nordic house Apartment Non-residential buildings Factory building Office building Civil engineering works Asphalt road Bridge All countries to price all BQs! ITAG meeting February 2009 Construction PPPs

Changes to the construction survey (ii) Complete BQs as of 2009 survey Annual updated of at least one BQ A standard classification of chapters for all BQs: ITAG meeting February 2009 Construction PPPs

Changes to the construction survey (iii) Spreading the pricing burden over two years: Year 1: - Detached house - Factory building - Bridge Year 2: - Portuguese or Nordic house - Apartment - Office building - Asphalt road ITAG meeting February 2009 Construction PPPs

Changes to the construction survey (iv) Estimation in non-survey years by “key” items Prices to be delivered only for selected “key” items for each chapter within the BQ Grossed-up to chapter totals by factors based on previously priced full BQs Summed to full BQ prices Improve BQ descriptions by gradual inclusion of functional specifications, starting with update of Detached house ITAG meeting February 2009 Construction PPPs