Capstone Design Update

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

Presenter: Kenny Haulk
Senior Design Project: Group IV Gigabit Ethernet Optical Transceiver Group Members: Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Group 2 - Project Update April 1, 2004 Tyler Helble.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Presenter: Nassisa-Geda Techane. 2 This Week’s Highlights The optical link budget almost finished Website up on the ECE domainWebsite Yahoo Group set.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #12  PROGRESS  Connectorized RX, Connectorized TX, & TX/RX Combo tested using 100m cable  Unconnectorized.
Presenter: Kenny Haulk. 2 This Week’s Highlights Tested Receiver with attenuation and shielding Measured power output from GDS1250 TX and our own VCSEL.
ECE 4006B Fall, 2002, Group 3, Shahriar Khushrushahi Progress Report Period (September 5 – September 12, 2002) Cleared loose ends with respect to PDs and.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Group 2 - Project Update Feb Tyler Helble.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
ECE Group 2 – Presentation 8
Opto-Link, Inc. – Status Report 8 Clif Kerr March 31, 2005
ECE 135 – BtrLaytDanNvr Presentation 7
Optical Gigabit Ethernet
Kevin Parker with Bryan Chavez & Pat Cleary February 24th, 2005
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
ECE 4006 CAPSTONE DESIGN R.Y.M.M.Y Georgia Institute of Technology
Presenter: Chris Lambrecht
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Presenter: Allen Duncan
1394b Design for Gigabit Optoelectronic Data Communication
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006-C Presentation the almost Last (10th)
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.
ECE 4006 Group 6 – Presentation 8
Project GabE ECE 135 – Spring 2005
ECE135 Group 2 – Presentation 3
ECE 135 – VCSEL Kings Presentation 5
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
GROUP 1 FINAL PRESENTATION
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
GIGABIT ETHERNET DESIGN ECE Spring 2004
Project GabE ECE 135 – Spring 2005 Presentation 10
Gigabit Ethernet Design ECE – Spring 2004
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
ECE 135 – The Three Presentation 9
Project GabE ECE 135 – Spring 2005 Week 9
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

Capstone Design Update Week 7 ECE 4006 – Group 1 Presentation by: Michael Fabery March 13, 2003

Successfully tested receiver test board with various attenuations ECE 4006 Spring, 2003, Group 1, Michael Fabery Progress Week 7 (February 28 – March 12, 2003) Progress: Successfully tested receiver test board with various attenuations Completed PCB Layout Received board parts Updated monetary budget

D21.5 Attenuation 30 dB

K28.5 Attenuation 30 dB

K28.7 Attenuation 40 dB

PRBS7 Attenuation 30 dB

Eye Diagram after 30 or 40 dB

Final PCB Layout

Parts Received Lasermate RST-M85A306 GaAS Connectorized Photodiode Hamamatsu S7912 Si Unconnectorized Photodiode Honeywell HFE4384-522 VCSEL 1K, 10K, 20K, 50K Potentiometers BLM11HA102SG Murata Ferrite Beads

Updated Budget

Week 7 Gantt Chart

Week 8 Planned Itinerary: Finish paper due on March 20 ECE 4006 Spring, 2003, Group 1, Michael Fabery Progress Week 3 (January 17 – Janurary 23, 2003) Week 8 Planned Itinerary: Finish paper due on March 20 Send off PCB Layout and receive board Finish assembly of transceiver and start testing