PHASE 4: FUTURE LEARNING & DEVELOPMENT SYSTEM ARCHITECTURE

Slides:



Advertisements
Similar presentations
Don't ever be reluctant to show your feelings whenyou're happy, give in to it. When you're not, live with it.
Advertisements

School of Engineering & Technology Computer Architecture Pipeline.
Google Inc. Breakout questions: 1. The case describes several of Google’s “products” (search, Gmail, Google Earth) What do they have in common? What is.
Phase Difference = Phase Difference = 0.05.
Eastern Partnership Culture Programme DAB Harmonisation Project Co-Production and the Eastern Partnership Region - Obstacles, Opportunities and Harmonisation.
Validation of Non-formal Adult Education courses Reflection Questions for Ghent REACTION No CP LT-GRUNDTVIG-G1.
The Canadian Labour Movement and Collective Bargaining.
DATE PROJECT PLAN TO DEVELOP A LEARNING & DEVELOPMENT STRATEGIC PLAN FOR Prepared by: 1 ©2012 RAY SVENSON CONSULTING, INC. RAY SVENSON CONSULTING, INC.
©2012 RAY SVENSON CONSULTING, INC. 1 PHASE 5: IMPLEMENTATION PLANNING Implementation Plan Outline Milestones/Timeline Communication Plan Implementation.
Precarisation of work for youth in Sweden. Sweden – the Myth Strong employment protection legislation. Trade union influence over restructuring and dismissals.
 Wellbeing Council Lache Primary School Early Years Behaviour Policy.
Active or passive what’s for you? Credence Independent Advisors Emaar Boulevard Plaza, Level 14, Burj Khalifa Downtown, P.O.Box , Dubai, UAE Telephone:
Project Integration Management Project Integration Management involves seven processes.
Negotiate to Win/Win. Negotiation Isn’t Confrontation Negotiation is about gaining something, possibly an advantage and giving something in return, but.
Road Owners and PMS Christopher R. Bennett Senior Transport Specialist East Asia and Pacific Transport The World Bank Washington, D.C.
3 Signs You’re Ready To Buy A Home
Kaizen – Continuous Improvement
Chapter Five Project Planning.
Ch. 3: Being a Health Care Consumer
EXPERT SYSTEMS.
How to use this template
Introduction to LDC Strategy
SAFEtalk Our new safety tool
ESB Networks Market Release Meeting of the IGG, May 28th 2009
Approaches and Techniques for Vendor Negotiations
9 Management of Quality.
Outline Protectionism Various protectionist methods
How do the Process Model, WBS, SPMP, Goal Statement,
 ?    FWA Implementation guide for staff How do I get started
UML dynamic Modeling (Behavior Diagram)
With the use of WAN Optimization appliances, the transaction time between websites can be enhanced by 90% and this has been well illustrated in the PPT that how? Some myths are also explained.
Functional Management
Functional Management
Functional Management
Functional Management
Functional Management
Functional Management
 ?    FWA Implementation guide for supervisors How do I get
सोलर पॅनेलचा उपयोग करुन रीचर्जेबल टॉर्च बनवणे.
Television Advertising
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
Conflict Resolution in the Board and the Congregation
EBG definition 0.55 12 GHz 0.5 12 GHz Probe position
LITERARY ELEMENTS Of Narrative Text.
Buy now at
PHASE 6: BUSINESS CASE 2-3 Year Cash Flow Projection Expected Benefits
MOTIVATING THE “UNMOTIVATED” Beverly O. Ford
Enlargement and the Political Institutions of the EU
Doing what you know is the right thing even when it is hard to do
Future L&D System Architecture
How to use this template
HOW TO COPY AND PASTE THE SNAP CUBES.
Applying Use Cases (Chapters 25,26)
Applying Use Cases (Chapters 25,26)
Jesus Helps Us When Our Good Requests Mask The Real Problem!
HOW TO COPY AND PASTE THE SNAP CUBES.
Critical Reflection Critical Teaching Critical Helper.
Conflict Management Styles
The Canadian Labour Movement and Collective Bargaining
HOW TO COPY AND PASTE THE SNAP CUBES.
Buying An Existing Business
What are the elements of a fairy tale?
HOW TO COPY AND PASTE THE SNAP CUBES.
PHASE 3: ANALYSIS PHASE 3: Analysis
What is the Difference Between Coaching and Counselling
Buy Weed Online When you are looking forward to buy the best quality of weed online, then it becomes difficult for you to trust anyone who offers the.
Lifecycle of a vehicle type* vs. Lifetime of a vehicle
How to use this template
System + Database ①​​ Post ② Push Notification ③ Approved ④ ⑤ ​​ Push Notification.
Resistance Management Process Decision Tree
Presentation transcript:

PHASE 4: FUTURE LEARNING & DEVELOPMENT SYSTEM ARCHITECTURE Future L&D System Architecture Design elements and design process System components System design Getting approval

BARRIERS AND OBSTACLES PHASE 4: Future L&D System Architecture It can be difficult to get people to think out of the box It can be difficult to get people to believe executives will buy in to the design Politics can become a real issue in this phase as people’s jobs may be threatened by the new design People are reluctant to consider more than one option carefully Sometimes “camps” form around various options and it can be difficult to reach agreement on which option to push forward Sometimes people have been through processes like this in the past that have led nowhere; this can make them skeptical about the possibility for success with this project