An Integrated Project under the 6th Framework Programme of the EU

Slides:



Advertisements
Similar presentations
Page 1© Crown copyright 2004 ENSEMBLES CONSORTIUM AGREEMENT Adrian Broad EU Manager, Met Office.
Advertisements

1 00/XXXX © Crown copyright Hadley Centre ENSEMBLES ENSEMBLE-based Predictions of Climate Changes and their Impacts.
ENSEMBLES-Hamburg Meeting, Martin Beniston, University of Fribourg, Switzerland ENSEMBLES RT8 Dissemination, education and training Martin Beniston.
ClimDev-Africa Program & African Climate Policy Center (ACPC)
19/02/ Cyclades Kick Off Meeting What a European Co-ordinator expects from his partners and what a European Consortium expects from his Co-ordinator.
1-1 PRESENTER The Role of the Framework 7 Advisor Your Name Your Websites Websites
University of Trieste PHD school in Nanotechnology Writing a proposal … with particular attention to FP7 Maurizio Fermeglia.
CIRAS PROJECT OVERVIEW
(The Global Programme of Research On Climate Change Vulnerability, Impacts and Adaptation) Adaptation Knowledge Day V: Climate Change Adaptation Gaps BONN,
Short presentation of an expertise profile for the 6 th call Space in FP7 Name, Organisation type of organisation (SME, research centre, university, company,
Short presentation of a project proposal for the 6 th call Space in FP7 „Draft proposal title“ Name, Organisation type of organisation (SME, research centre,
Seventh framework programme CAPACITIES specific programme Activities of international cooperation Coordination Support Action - Grant agreement no.:
What is the point of this session? To use the UK’s experience to give ideas about creating and using climate change scenarios in other countries and situations.
e-ScienceTalk: Supporting Grid and High Performance Computing Reporting across Europe GA No September 2010 – 31 May 2013.
RT6 RT3 and RT4/RT5 Feb 2005 Meetings ENSEMBLES Meetings RT3 Copenhagen, RT4/RT5 Paris, February 2005 RT6 Assessments of impacts of climate.
Research Programme Design and Management – Experiences from CRUE – Partner Countries Reiner Enders PTJ (Project Management Organisation Juelich) Brussels,
Somerset County Council Climate Change Strategy Abigail Stretch Sustainable Development Officer.
The Programme is funded by Erasmus+ under
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Overview of the UK / European program on I&A Clare Goodess Climatic Research Unit University of East Anglia
Page 1GMES - ENSEMBLES 2008 ENSEMBLES. Page 2GMES - ENSEMBLES 2008 The ENSEMBLES Project  Began 4 years ago, will end in December 2009  Supported by.
CORDEX Scope, or What is CORDEX?  Provide a set of regional climate scenarios (including uncertainties) covering the period , for the majority.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
STARDEX STAtistical and Regional dynamical Downscaling of EXtremes for European regions A project within the EC 5th Framework Programme EVK2-CT
PROMISE coordination Julia Slingo, Emily Black, Franco Molteni.
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
Page 1© Crown copyright 2004 ENSEMBLES Kick-off Meeting Dave Griggs, Director Hadley Centre, 15 September 2004.
Workshop 2 Chair: Martin Birley Health Impact Assessment: Making the Difference.
An Integrated Project under the 6 th Framework Programme of the EU Project Overview Project Office can be contacted on Web.
Building the Europe of Knowledge Proposals for the 7 th Research Framework Programme
An Integrated Project under EU 6th Framework Programme Kick-off meeting, Hamburg September 2004 Chris Hewitt, Met Office Hadley Centre, UK
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Climate Change Scenarios for Agriculture Sam Gameda and Budong Qian Eastern Cereal and Oilseed Research Centre Agriculture and Agri-Food Canada Ottawa,
ENSEMBLES General Assembly Lund, Sweden, 22 November 2006 RT5: Evaluation Albert Klein Tank & Antonio Navarra / Elisa Manzini.
Collaborative CGIAR-ESSP Project Outline (1) "Pressures on agriculture from climate change mitigation" Motivation Ambitious climate protection goals: e.g.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
ECOMS: European Climate Observations, Modelling and Services Chris Hewitt, UK Met Office ECOMS Kick-Off Meeting, Barcelona, 6-9 th November 2012.
Climate Change – Defra’s Strategy & Priorities Dr Steven Hill Department for Environment Food and Rural Affairs 22 nd May 2007 FLOODING DESTRUCTION AT.
1 RT3, Formulation of very high resolution Regional Climate Model Ensembles for Europe J.H. Christensen (DMI) M. Rummukainen (SMHI) B. van den Hurk (KNMI)
World Climate Research Programme Joint Scientific Committee – 31 Antalya, Turkey.
Water Bodies in Europe: Integrated Systems to assess Ecological Status and Recovery Funded under FP7, Theme 6: Environment (including Climate Change) Contract.
1 FINANCE, ADMIN & DELIVERABLES UERRA kick-off, Exeter March Madeleine Benderyd, SMHI UERRA Kick off meeting: 26th-27th March 2014.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
© 2011 Martin Beniston Linking the physical, biological, and socio-economic sciences: an example from the EU « ACQWA » Project Martin Beniston Institute.
Supporting local and national accountability Spring Workshops 2016.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
Surface Ocean – Lower Atmosphere Study
HiGEM A national UK programme in ‘Grand Challenge’ high resolution modelling of the global environment between NERC and the Hadley Centre.
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
Cross-Cutting Topic DECADAL PREDICTION.
GA No 1 September 2010 – 31 May 2013 Steven Newhouse Director EGI.eu
The GEO-6 Matrix Drafting Approach
Institute of Informatics & Telecommunications
WORLD CLIMATE RESEARCH PROGRAMME
European Environment Agency
HR Wallingford in UK Government Hydraulics Research Station formed 1982 Privatisation to create HR Wallingford Limited by guarantee, non profit.
KNPS Korea National Parks Service South Korea
CRUE – The Way Forward Vicki Jackson
Progress with the EUPORIAS project
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.1 Coping with climate change European Commission Research.
7th EU Research FP has ten themes defined in order:
ETSI Standardization Activities on Smart Grids
KICK-OFF Overview and thematic approach 19th of June 2017
Water Science-Policy Interface (CIS-SPI) Progress report
Report on the EEA workshop dedicated to the use of GMES data for emission inventories John Van Aardenne (EEA), Justin Goodwin (Aether), Peter de Smet.
Research on Climate Change on Water, including Natural Hazards Contribution to SSG discussions and science-policy interfacing Philippe QUEVAUVILLER European.
Presentation transcript:

An Integrated Project under the 6th Framework Programme of the EU ENSEMBLES An Integrated Project under the 6th Framework Programme of the EU Project overview and update for RT4/RT5 meeting, ENS, 10-11 February 2005 Chris Hewitt, Met Office Hadley Centre, UK chris.hewitt@metoffice.gov.uk

Outline Overview of the ENSEMBLES project (10RTs) Achievements to date Current, planned activities and latest developments © Crown copyright 2004

The ENSEMBLES Project A five year project, up to €15 million funding from EC Currently about 66 partners from across EU, Switzerland, Australia, US Ten Research Themes (~300 page DoW) Project is being managed by a Management Board under the terms of a Consortium Agreement Follows on from/builds upon FP5 projects (e.g. DEMETER, PREDICATE, STARDEX) © Crown copyright 2004

Strategic Objectives Develop an ensemble prediction system based on the principal state-of-the-art high resolution, global and regional Earth System models, validated against quality controlled, high resolution gridded datasets for Europe, to produce for the first time, an objective probabalistic estimate of uncertainty in future climate at the seasonal, decadal and longer timescales Quantify and reduce uncertainty in the representation of physical, chemical, biological and human-related feedbacks in the Earth System Maximise the exploitation of the results by linking the outputs to a range of applications, including agriculture, health, food security, energy, water resources, insurance and risk management © Crown copyright 2004

Overview of Research Themes RT1 James Murphy, Tim Palmer To build and test an ensemble prediction system based on global Earth System Models for use in the generation of multi-model simulations of future climate in RT2A. RT2A Jean-Francois Royer, Guy Brasseur To produce sets of climate simulations and provide the multi-model results needed in other RTs: validation RT5, understanding processes RT4, as well as providing boundary conditions and forcing fields for regional model simulations RT2B. © Crown copyright 2004

Overview of Research Themes RT3 Jens Christensen, Markku Rummukainen To provide improved climate model tools developed in the context of regional models, first at 50 km, later at 20 km resolution for specified sub-regions, including provision of a multi-model based ensemble system for regional climate prediction for use in RT2B. RT2B Clare Goodess, Daniela Jacob To provide ensemble based regional climate scenarios and seasonal to decadal hindcasts for use in other RTs: understanding processes RT4, validation RT5, and impacts studies RT6. © Crown copyright 2004

Overview of Research Themes (continued) RT4 Julia Slingo, Herve le Treut To advance the understanding of the basic science at the heart of the ENSEMBLES project, exploiting integrations performed in RT2A, linking with RT5 on the evaluation of the ensemble prediction system and feeding back results to RT1. RT5 Antonio Navarra, Albert Klein Tank To perform a comprehensive and independent evaluation of the performance of the ensemble prediction system, including the production of high resolution observational dataset, and using integrations from RT1, RT2A, RT2B and RT3. © Crown copyright 2004

Overview of Research Themes (continued) RT6 Andy Morse, Colin Prentice To carry out climate impact assessments, including linking impact models to ENSEMBLES probabalistic scenarios produced in RT2A and RT2B, in order to develop risk based estimates of impacts. RT7 Richard Tol, Roberto Roson To provide scenarios of greenhouse gas emissions, land-use changes and adaptive capacity with and without greenhouse gas reduction policies, and test the sensitivity of these scenarios to climate change. RT8 Martin Beniston, Christos Giannakopolous Represents the interface between the ENSEMBLES scientific consortium and a wider audience that includes scientists, stakeholders, policymakers and the general public. © Crown copyright 2004

Research Themes © Crown copyright 2004

RT0 Management © Crown copyright 2004

RT0 Management Provide overall co-ordination and top-level management for the project. Organise General Assemblies to discuss progress and plans ENSEMBLES Management Board meet as often as required End of project conference and brochure to showcase the project’s outcomes Coordinate reporting, and comms. between EC and project Project Office can be contacted on ensemblesfp6@metoffice.gov.uk or look at http://www.ensembles-eu.org © Crown copyright 2004

Achievements to date (Feb 05) Project started 1 Sep 04 (the date you can charge costs from) Kick-off meeting (13 absent partners) and 1st EMB meeting Contract signed and pre-financing distributed Project web site http://www.ensembles-eu.org available along with web sites for RT1, RT2A, RT6, RT8 (RT2B,3 soon) Project-wide and RT mailing lists developed. Eos overview article published 1st Newsletter released, 1st ENSEMBLES Workshop arranged. Please provide RT8 with requested information so they can disseminate project information and results. Links with other projects (e.g. DYNAMITE, 3rd&4th call), and requests for participation from additional organisations © Crown copyright 2004

Current and planned activities 6 month reporting © Crown copyright 2004

For WP leaders For partners © Crown copyright 2004

Current and planned activities 6 month reporting (1Sep04 – 28Feb05). RT coordinators will advise End of year reporting – strongly recommend all partners do a practise run, particularly for cost statements (but don’t do the audit certificate) EMB to discuss a timetable for end of year reports Gender committee – volunteers contact me or Clare Goodess © Crown copyright 2004

Current meeting timetable EMB meeting, 23 March, Copenhagen Informal meetings at EGU? 24-29 April, Vienna Cross-cutting Worksop, 9-11 May, Evora RT6 meeting, June (TBC) Joint RT1/RT2A meeting, 13-15 June, Toulouse General Assembly, 5-9 September, Athens Joint AVEC summer school, 18-30 September, France © Crown copyright 2004

Discussion items General Assembly schedule: Interaction with other RTs Day 0 Monday Optional RT/WP meetings Day 1 Tuesday RT meetings Day 2-3 Wed-Thu General Assembly Day 4 Fri. a.m. Management Board Interaction with other RTs Web sites © Crown copyright 2004

Example of an RT web site © Crown copyright 2004

Questions & Answers © Crown copyright 2004