Facilitated By: John Meyer Rick Harris

Slides:



Advertisements
Similar presentations
1 CM HOW-TO DETAILED DISCUSSION. 2 OBJECTIVE n Upon completion of this training you will demonstrate an understanding of how to perform a CM evaluation.
Advertisements

CM HOW-TO GENERAL OVERVIEW AND DELTAS FROM E2. OBJECTIVE u Upon completion of this training you will demonstrate an understanding of major differences.
January 24, SA12-PE-04 Purpose and Scope The purpose of this self assessment is to conduct a multi-discipline team review (deep dive) of the Feedwater.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
1 Chapter 13 Artificial Intelligence and Expert Systems.
Certified Software Tester How To Build a Testing Project, Part 2.
Concept Generation The Design Process Objective Trees Concepting Evaluating Alternatives MAE 156A.
Future Educator.  Hello my name is Wendy Warren. I am a mother of three children and a wife going on ten years. I have a strong sense of family and values.
Software Test Metrics When you can measure what you are speaking about and express it in numbers, you know something about it; but when you cannot measure,
How to get good commercial software built
Information Systems Development
Mrs. Monica Gerda Mrs. Amy Howton Dr. Mia Oberlton
Certified Health Education Specialist (CHES)
Ololade Olakanmi American Medical Association November 2007
Mental and Emotional Health
Risk Communication in Medicines
Architecture & System Performance
Architecture & System Performance
WEBINAR The UX Journey MAY 24, 2017.
Scaffolding Lessons to Meet Students Needs
Difficulties in Expert System Development
Programme Board 6th Meeting May 2017 Craig Larlee
Portfolios Digital Electronics © 2014 Project Lead The Way, Inc.
Requirements Elicitation – 1
Year 7 E-Me Web design.
Effective Qualities of a Team Leader
Applications of Data Mining in Software Engineering
Psychology The study of human behavior Take out your notebook.
Using CM to Maintain the Design Basis
Intercultural Communication
Chapter 2 The Process of Design.
Chapter 2: Entrepreneurs and Enterprising People
Software Requirements
Forging the Innovation Generation
Developing and Increasing Access to Health and Community Services
Promoting CM Breakout Session
Configuration Control and the Standard Nuclear Performance Model
Design Portfolio.
Scientific Inquiry Standard B – 1.7.
Measures Measures Matter!.
Break Out 6: CM Organizational Structure
INPO Perspective of Industry CM Performance
CS 1120: Computer Science II Software Life Cycle
Results of Design Reviews
Bell Work! You should have your composition notebook at your desk.
How to Write a Summary Paper
Assessments TAP 1- Strand 5.
Outcome 4 At the end of this session you will:
From INPO AFI to Top Performer
Chapter 2: Entrepreneurs and Enterprising People
Building a Balanced Scorecard
Project Management in Production Environment
Jim Powers - Director, Fleet Engineering
THE TEN PRINCIPLES OF LEADERSHIP 1. LEAD BY SETTING A GOOD EXAMPLE.
Health Literacy & Insurance
Confidence building in the nervous dog
Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee April 9, 2019 Cleveland 2005.
TA Toolkit Teacher Session
Vendor Technical Information
Data-Driven Decision-Making
CS 1120: Computer Science II Software Life Cycle
Portfolios.
Supporting a family member or friend living with mental illness
Research Community Forum
CRITICAL CARE NURSES CHAPTER----QUALITY IN CRITICAL CARE.
What is the link between these pictures?
Confidence building in the nervous dog
[List team members here] June 14, 2019
Presentation transcript:

Facilitated By: John Meyer Rick Harris Margin Management Facilitated By: John Meyer Rick Harris

What’s Driving Margin Management? Power uprates – margin interfaces Need for complete engineering bases System Health Reports INPO (AFIs) OE Plant Life Extension Changes in design requirements

Documenting Margins INPO doesn’t expect margin notebook INPO asks for top ten list Margins can be moving targets Should be relatively easy to retrieve

What Is Margin Management? New “Program” not needed Include in processes Margins clearly stated in calculations Need people to be fluent in verbalizing margins Need to communicate in terms of margin – speak the language Involves use of right design inputs

Ways to Recover Margin Analytical Modification Maintenance Testing Operations

When to Recover Depends on risk and cost Depends on what margin model space you are in Engineers shouldn’t always be justifying the existing condition of the plant but returning to original design

Metrics & Effectiveness Measure documentation of margins in design changes & calculations Engineering quality review teams Margin issues in System Health reports Self Assessments Quantify number of operational challenges due to low margin, evaluate seriousness. Measure tenure of top margin issues

Random Thoughts Potential negative public perception on reduced margin Risk increase associated with reduced margin? Design and operating limits may be fuzzy Large margins can give a false sense of security