PRD 2018 GUIDELINES & TEMPLATE

Slides:



Advertisements
Similar presentations
2-Stage procedure: special attention to the 1st stage, how to build a successful proposal Caterina Buonocore Health National contact Point for Italy “
Advertisements

Click to add title Elygrid Project ( Grant Agreement nº ) Pablo Marcuello Foundation for the Development of New Hydrogen Technologies in Aragon.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
EPICS Design Review Template Notes:  Use the template as a guide to preparing your presentation….you may add, subtract, or rearrange as needed to tell.
Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS (ENPRODUS) Managerial Issues.
Main Principles of the 3 rd SOLAR-ERA.NET Joint Call
Work Package 5 - Dissemination Work Package 5 - Dissemination P5 has an overall responsibility to ensure the timely achievement of the targets and deliverables.
1 Framework Programme 7 Guide for Applicants
Industry technology facilitator. PowerPoint summary to accompany your proposal Slide Template.
Mike Sobolewki Presenter’s Name Course Name Computer Science, TTU Title Placeholder Instructions: (Delete this element) Use either CS or Sorcer.
Application Form Part 1, Sections 4-9 How to Apply Seminar 16 th September 2010 – Copenhagen Kirsti Mijnhijmer.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
GILLINGS SCHOOL OF GLOBAL PUBLIC HEALTH Insert date here Title of presentation goes here Example image.
Case study of a successful proposal Rob Davies. Parts of a proposal Part A - Proposal Administrative Overview - forms Part B- Description of objectives.
NPA eMS application Kirsti Mijnhijmer, Joint Secretariat 20th October 2015 – Copenhagen, Denmark.
© Services GmbH Proposal writing: Part B 2/1/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
INSTRUCTIONS YOU HAVE UNTIL MAY 31 TH 2013 TO SEND THIS DOCUMENT BACK TO ✚ FILL THIS DOCUMENT and help yourself with the evaluation.
PROJECT TITLE, 72 pt or larger REGION/COUNTRY Include a title, or an explanation of what’s relevant about the figure. Reference any data sources
The ICON 6-minute pitch. Practical Submission This slideset should be uploaded on the MyProjects platform at the latest Tue Sept 20, 12 o’clock noon Info.
NPA eMS application – Project Information Joint Secretariat 1st June 2016 – Cork, Ireland.
Avena genetic resources for quality in human consumption (AVEQ) Startup Meeting, Clermont Ferrand 2007 Federal Centre of Breeding Research on Cultivated.
ARTEMIS Industry Association Title Presentation - 1 e.g. SCALOPES e.g. SCAlable LOw Power Embedded PlatformS.
Font Size for Title between 42-72
Please put the title here
Civil Contractors Federation ‘2017 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Global Coordination Platform
INSTRUCTIONS This PowerPoint Presentation Template has been pre-formatted to provide font size and color combinations that will ensure maximum visibility.
4th. Plenary Meeting, Edinburgh, May 2010
PowerPoint summary to accompany your proposal
Instructions Use of this template is encouraged but not compulsory.
EPICS Design Review Template Notes:
NPA eMS application – Project Information
Application Form Sections 4-9 Christopher Parker & Kirsti Mijnhijmer 28 January 2009 – Copenhagen, Denmark European Union European Regional Development.
Guidelines and Template for project oral presentation
INSTRUCTIONS This PowerPoint Presentation Template has been pre-formatted to provide font size and color combinations that will ensure maximum visibility.
Open Blue Template Company name
Guidelines and Template for project oral presentation
Project Plan Template (Help text appears in cursive on slides and in the notes field)
INSTRUCTIONS This PowerPoint Presentation Template has been pre-formatted to provide font size and color combinations that will ensure maximum visibility.
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
NPA eMS application – Project Information
PRD 2018 GUIDELINES & TEMPLATE
Management Information System - MIS
Presentation CERN, May 23rd, 2018
FP7 SCIENTIFIC NEGOTIATIONS Astrid Kaemena European Commission
ANNUAL PERFORMANCE REPORTS
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
The International Consortium for Personalised Medicine
Minimum of 30 point and maximum 3 lines title Remove or change the pictures Event Location Date There MUST be a CGIAR logo or a CRP logo. You can copy.
Research Methods Technical Writing Thesis Report Writing
Basic Design Documentation
[INSERT TITLE THAT WILL REPRESENT COMPANY/PROJECT OR INITIATIVE]
Instructions Use of this template is encouraged but not compulsory.
The Best Contact Center Indonesia 2019
Learn and Share Attendee guide and template for presentation of improvements and innovations at the Emergency Care Improvement Group Meeting.
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
The poster title goes here and here
Learn and Share Attendee guide and template for presentation of improvements and innovations at XXX Improvement Group Workshop.
Learn and Share Attendee guide and template for presentation of improvements and innovations at the Imaging Improvement Group Meeting.
Learn and Share Attendee guide and template for presentation of improvements and innovations at XXX Improvement Group Workshop.
Field monitoring Project (number and title)
Learn and Share Attendee guide and template for presentation of improvements and innovations at HRT1916 Patient Safety Improvement Group Workshop.
PROJECT TITLE, 72 pt or larger
Partner name XXX – Activities (30'’)
PRD 2019 GUIDELINES & TEMPLATE
Insert your university logo.
Instructions Use of this template is encouraged but not compulsory.
Presentation transcript:

PRD 2018 GUIDELINES & TEMPLATE

GENERAL GUIDELINES Content The presentation must focus on targets and current state of project achievements in relation to the contractual objectives and overall strategic context of FCH JU and its annual and multi-annual plans. The presentation refers to the information provided in the self-assessment report, including: as introduction: an overview and a summary with context, objectives, and position towards international state-of-art (SoA) a main part with emphasis on advancement towards the objectives focusing on maximum 3 main aspects and actions planned some slides about general activities such as main challenges, communication and dissemination activities

THE PRESENTATION SHOULD LAST 15 MINUTES GENERAL GUIDELINES SLIDE STRUCTURE - TIME SCHEDULE THE PRESENTATION SHOULD LAST 15 MINUTES Use the PowerPoint template of this presentation Recommended (but not compulsory) font size for text is minimum 18 pt Representative photo, images, figures etc. are encouraged (maximum 2-3 figures on a slide!) Recommend around 10-15 slides: 1 title page 1 general info on the project 6 maximum on progress vs objectives/SoA (3 aspects) 1 on Risks & Challenges 1 on Communication activities 1 on Dissemination activities Some “optional slides” (Please choose 1-2 most relevant) Graphic material Please send the presentation to FCH JU by 26 October 2018 (email to prd@fch.europa.eu)

GENERAL GUIDELINES HOW TO USE THE TEMPLATE Please replace text in red with relevant information from the project and change its color to blue or grey The text in green is used for instruction/explanations: please remove it Please click on the comment boxes for further instructions on how to provide the information The proposed “Optional slides” can be presented or should be removed from the presentation

USEFUL REFERENCES FCH JU Website Reference FCH JU documents (MAIP/AIPs and MAWP/AWPs): Multi-annual plans (MAIP/MAWP) Addendum to the FCH JU 2014-2020 AWP – New Document! Annual plans: 2008-2013: AIPs 2014-2020: AWPs Previous FCH JU Programme Review Days European Commission non-nuclear Energy Research (incl. FCH) FCH JU Industry Grouping: Hydrogen Europe FCH JU Research Grouping: Hydrogen Europe Research

ACRONYM Project Title Project LOGO Speaker Name Surname Speaker Affiliation Project Website Email coordinator Project LOGO Programme Review Days 2018 Brussels, 14-15 November 2018

PROJECT OVERIVEW Call year: [YYYY] Call topic: [insert number and title of the call topic to which the proposal was originally submitted] Project dates: [start date – end date] % stage of implementation 01/11/2018: [… %] Total project budget: […….. €] FCH JU max. contribution: […….. €] Other financial contribution: [……. €] Partners: [list all partners]

PROJECT SUMMARY Short project introduction describing Project Acronym, Full Title Objectives Global positioning vs international state-of the art Application and market area (Feel free to include pictures or figures)

PROJECT PROGRESS/ACTIONS – Aspect 1,2,3.. Example and explanation in the next slide PROJECT TARGET VALUE Achievement to-date PROJECT START VALUE 50% 75% 25% Please refer to the objectives/targets/KPIs set in the relevant multi-annual work plan (MAIP or MAWP) or in the topic description for the call for proposals to which you successfully applied (see the relevant annual plan - AIP or AWP - for reference) as well as the current SoA for ongoing similar activities, relevant to this aspect. Please compare your projects achievements against the respective FCH JU targets and SoA. You are highly advised to use graphs and diagrams or tables (as a second option). In addition: Please explain briefly (orally or in bullet points) the performed activities and/or problems encountered to meet those targets as well as future steps to meet the targets * If you would like to refer to a non measurable KPI which is important to your project please explain accordingly

Status at month 17 of a 36 months project at date 01/11/2018 Example and explanation of PROJECT PROGRESS/ACTIONS - Durability Achievement to-date 6000h 1 V/h 2000h 12 V/h 50% 75% 25% Status at month 17 of a 36 months project at date 01/11/2018 Example slide % stage of implementation is the % of project duration (months) elapsed on 01/11/2018

Status at month 17 of a 36 months project at date 01/11/2017 Example and explanation of PROJECT PROGRESS/ACTIONS - Availability 95% Achievement to-date 88% 50% 75% 25% 97% Status at month 17 of a 36 months project at date 01/11/2017 Example slide % stage of implementation is the % of project duration (months) elapsed on 01/11/2018

Risks and Challenges Please refer to any risks, bottlenecks and challenges encountered in the course of the project as well as measures taken to mitigate the effects and improve performance/activities/results. Please use text, graphs and digital material (pictures or videos) to explain and support your statements.

Communications Activities Please include information about the project communication strategy, the latest communication activities and communication plans such as events, website, newsletters etc You are highly advised to use pictures and/or videos from any communication activity performed. Please also refer to the projects social media presence e.g. Facebook, LinkedIn etc Please use the following icons:

EXPLOITATION PLAN/EXPECTED IMPACT Please explain your exploitation strategy, plans and activities  For example: Exploitation of project findings, results and outcomes included in the project Description of Action or Description of Work (DoA or DoW), how and through which means, this is/will be implemented.  *For completing this section it is particularly important to include planned exploitation activities by individual industrial and research members of the project consortium. Impact Please explain the anticipated impact or realised impact

Coordinator: coordinator@email.address Speaker: speaker@email.address ACRONYM Project Title Speaker Name Surname Speaker Affiliation Project LOGO Coordinator: coordinator@email.address If different: Speaker: speaker@email.address Programme Review Days 2018 Brussels, 14-15 November 2018

OPTIONAL SLIDES You can use any of the following slides and insert them inside the presentation, otherwise please delete them.

Dissemination Activities Please include information as well as digital material (pictures, videos etc) from dissemination activities such as, conferences, technical workshops publications and patents Specifically: Indicate the number of conferences/workshops organized by the project and that the project has attended Specify the number of publications and give reference up to 2 most relevant ones Please provide the total number of patents (and patents applications) and give full reference to up to 2 In addition, please refer to the public deliverables of the project

Horizontal Activities Free slide illustrating activities on public awareness, training, RCS (Regulations, Codes and Standards), Life Cycle Analysis (LCA), Hydrogen Events and LEssons Learned (HELLEN) and contribution to cross-cutting activities or any other activities not mentioned in the previous slides.

SYNERGIES WITH OTHER PROJECTS AND PROGRAMMES Interactions with projects funded under EU programmes Project acronym/logo: Description of interactions, synergies and/or joint activities (if any) and relevant benefits obtained Interactions with national and international-level projects and initiatives

Icons/Tables and graphic material Please feel free to use any of the icons, tables etc provided in the following slides to your presentation

Auxiliary Slides Please select one or more slides/graphs/icons according to your needs and delete the rest

Simple Bar chart Select graph > Right click > Edit data in Excel Title comes here Text here Title comes here

Triple level Bar chart Select graph > Right click > Edit data in Excel Title comes here

Balloon text boxes with icons Icons can be added according to the content Title here Content comes here Title here Content comes here Title here Content comes here Title here Content comes here

Square text boxes Title comes here Title comes here Title comes here Pictures can be added according to the content Title comes here content comes here Title comes here content comes here Title comes here content comes here Title comes here content comes here

MATERIAL HANDLING VEHICLES FCH JU projects results 2015 Grid template Insert icons as needed >1,000,000 km driven since project started MATERIAL HANDLING VEHICLES FCH JU projects results 2015 MAWP 2017 MAWP 2017 Objectives Specific FC System cost, €/kW @10kW < 1,500

Balloon text boxes Content here Content here Content here Content here Icons can be added according to the content Content here Content here Content here Content here Content here Content here

Arrow diagram Icons can be added according to the content Title here Text can be inserted here Title here Text can be inserted here Title here Text can be inserted here Title here Text can be inserted here Text can be inserted here Title here

Icons set #1

Icons set #2

Icons set #3