Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Advertisements

Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Wednesday
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Friday 15th June 01:11 Injection.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Tuesday Nov 16th Fill 1492 into physics around 07.30
Monday fill with 1092 bunches (6 h stable beams)
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Summary of Week 11: 14 – 21 March
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
Saturday – Morning 7:36 beams dumped
SPECIAL THANKS TO Louis & Mirko For the nice fill
Friday Morning 7:30 injection for fill 2908
Wednesday 03/11 – The Plan Finish electron-cloud program:
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 24 October hours of 25ns MD
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
MD#2 News & Plan Tue – Wed (19. – 20.6.)
90m "proper" VdM scans in the 90m/10m optics
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Tue/Wed 12/ :00 Probe beam back again
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Saturday :42 stable beams fill 3541
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Friday morning 08:00 Stable beams with 840b.
LHC Morning Meeting - G. Arduini
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Thursday 30th September De-bunching test
Thursday
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Friday 1st October : Van der Meer scans
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Monday 152 bunch operation summary
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Programme for VDM measurements Friday Oct 15 Phase I: Getting ready 06:00 Started BI checks without beam (BCT) 07:03 S81+LHCb dipole tripped => precycle needed …. delay 09:45 Started filling… some probs with XPOC & filling scheme 11:35 16 bunches ready at 450 GeV, checked , 12:05 Ramp started 12:42 Squeeze started 13:05 Squeeze finished 13:12 Collapsed, optimize IPs…

Programme for VDM measurements Friday Oct 15 Phase II: VDM scans proper 13:43 Started IP8 vdm scans 14:58 Finished IP8 vdm scans 15:18 Started IP5 scans 16:17 Finished IP5 scans 16:31 Started IP2 scans 17:50 Finished IP2 scans IP5: +1 hour Oct 1

Programme for VDM measurements Friday Oct 15 Phase III: complementary measurements 17:55 Started IP8 length scale calibration 18:05 Finished IP8 length scale calibration 18:10 Started IP5 length scale calibration 18:26 Beam dump LBDS vac gauge off ???... one plane done, other plane just started Could not do (30 minutes more!): longitudinal scan Simon’s check of parallel IP optimisation and ALICE length scale calibration (no Silicon tracker)

Overview whole programme CMS scans LHCb scans ALICE scans

Overview all scans LHCb scans CMS scans ALICE scans

LHCb scans

CMS scans

ALICE scans

Did it go well ? Phase I: expected ~3hours , took ~7hours (3 ¾ hours lost by Pt8 trip) Phase II and III: What was originally planned to take ~5 ½ hours of stable beams was compressed into ~ 4 ¾ hours (excluding what could not be done due to dump) Beams were good, some more ghost charge (satellite bunches) than usual ? should not be a problem for this time (on the contrary?)

Summary Very good beam conditions (emittance, charge, special pattern…) but 3-4h delay du to pt 8 trip Completed all VDM Excellent support and participation from BI, OP, ABP, … online indications that beam current errors are small Still to do: length scale calibrations in IP5 and IP2 can be done in physics longitudinal scan tests can be done in physics, but better test once in a low intensity fill ? MANY THANKS