Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Integration study of dipole corrector (for the MB Quad of CLIC Module) A.Samoshkin, M. Modena (CTC, 06-Apr-2010) 1.
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
QD0 Prototype Magnetic Measurements Michele Modena, TE-MSC QD0 Workshop 2013, 29 January 2013.
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A. Aloev, E. Solodko, P. Thonet, A. Vorozhtsov “CLIC magnets developments” “CLIC Project.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
Permanent Magnets Y. Iwashita Kyoto University. PMQ with saturated iron pole B=2Br (1-r 1 /r 2 ) cos 2 (π/M) sin(2π/M) /(2π/M)
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
Magnet designs for Super-FRS and CR
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Options for Final Focusing Quadrupoles Michele Modena CERN TE-MSC Many thanks for the contributions of: J. Garcia Perez, H. Gerwig, C. Lopez, C. Petrone,
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
CLIC QD0 R&D Status 1 Michele Modena, CERN TE-MSC IWLC10, WG5, 21October 2010.
M. Modena, A. Aloev CERN, Geneva, CH “An alternative Super-ferric design for ILC QD0” “LCWS14, 6-10 October 2014 Belgrade.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
SBS Magnet John J. LeRose. Assembly drawing of 48D48 magnet as used at BNL (vertical field)
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
AGENDA: 1) SDO Procurement ACTIONS has noted at last meeting (10 June): ALEXANDER: magnetic forces during assembly to be computed. In case, we could assemble.
XFEL X-Ray Free-Electron Laser Bernward Krause MEA WP-12: Warm Magnets WPL: B. Krause.
D2 CONFIGURATIONS P.Fabbricatore & S.Farinon INFN Genova  Starting from previous studies done at CERN, BNL and BLNL, possile cross sections of D2 dipole.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Drive Beam Quadrupoles Jim Clarke, Norbert Collomb, Ben Shepherd, Graham Stokes STFC Daresbury Laboratory, UK Antonio Bartalesi, Michele Modena, and Mike.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
11 T Dipole Status May 2012 M. Karppinen CERN TE-MSC On behalf of CERN-FNAL collaboration.
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
Nb3Sn wiggler development
Yingshun Zhu Accelerator Center, Magnet Group
Status of BDS (QD0 and SD0) and PCL magnet studies for CLiC
One plane dipole corrector for the CLIC MBQ TYPE 1
Yingshun Zhu Design progress of QD0 in CEPC Interaction Region
High Gradient Magnet Design for SPring-8 Upgrade Plan
Normal Conducting Magnets
Status of the manufacturing process of a Nb3Sn wiggler prototype
Procurement, Measurement and Installation of 2 Octupoles for ATF
HO correctors update Massimo Sorbi and Marco Statera
Status of design and production of LEP connection cryostat
Other magnets procurement status:
Agenda 9:00  - Welcome ASG speaker 9:10 -  Introduction -       P.Fabbricatore 9:25 - The D2   magnets in HL-LHC   -  E. Todesco.
Development of the Canted Cosine Theta Superconducting Magnet
Status report on MQYY (Q4)
Bore quench field vs. critical current density
Procurement of Nb3Sn strand for coils assembled at CERN
Main magnets for PERLE Test Facility
Conceptual Design of CEPC Interaction Region Superconducting Magnets
MicroMegas Mechanical Meeting --- Cern April 2014
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Engineering Status.
Compact and Low Consumption Magnet Design The DESY Experience
Status of the PANDA Solenoid Magnet Production in BINP
P.Fabbricatore & S.Farinon
Thermal test (lab modules)
Crab – RFD prototype: Fabrication Status Update
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Production Cryo HL-LHC BPMs
M. Modena, CLIC Stabilization Day # 10, 14 September 2010
Presentation transcript:

Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC) “CLIC 6th Stabilization Meeting’ on 9 June 2009”

Long (2-m) Main Beam Quadrupole prototype a remind…. Aim of this quadrupole prototype: Provide quickly a prototype for the stabilization studies Test different poles and coils assembly solutions (towards stabilization performances) Provide a magnet for developing and testing magnetic measurement system (very small and long magnet bore!) “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

a remind…. 3 assembly options “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

Quadrupole Cross-Section: Final EM Optimization “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE (Courtesy of A.Vorozhtsov) a remind…. NOTE: a gap of 3 mm between iron poles and coils is left to test different solutions for coils support/dumping system

Quadrupole Prototype procurement Status: “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Quadrupole Prototype procurement Status: Copper conductor : Ordered (with Luvata- Finland) Iron: Ordered (AFNOR C10 R type) Tender Drawings: Completed this week Coils Call for Tender: Send out hopefully this week to 3 Companies Iron machining: Selecting potential bidders

Courtesy of R. Leuxe EN-MME “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

Courtesy of R. Leuxe EN-MME “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

Courtesy of R. Leuxe EN-MME “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

Courtesy of R. Leuxe EN-MME “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

Courtesy of R. Leuxe EN-MME “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

Courtesy of R. Leuxe EN-MME “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

Courtesy of R. Leuxe EN-MME “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

Courtesy of R. Leuxe EN-MME “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

“”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE