LERF Cryomodule Testing Facility – Accelerator Systems Deliverable

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

Engineering and Design Group Fermi National Accelerator Laboratory Cryogenic Department AAC Review, May , 2005 Jay Theilacker HPTFCRYOGENICS.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Christmas in August Helping Missionaries Reach Out to Their Communities.
North Carolina ABC Distribution Center Graham B. Thompson Project Manager LB&B Associates Inc.
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
DESING OF WAREHOUSE. INDEX 1. Parameters to be considered for the desing of warehouse. 2. Organizational model physical warehouse.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Ingot Niobium Workshop RF Sources Andrew Kimber 4 th December 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson Science Associates,
Room 105 Status and Laser project update Brachmann.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
IT 244 Week 5 Assignment Physical Security Policy To purchase this material link 244-Week-5-Assignment-Physical-Security-
LCLS-II Technical Requirements
Cryoplant Controls Installation
RF Systems and Controls for the LERF CM Tests
ALCW2015 SRF working Group Hayano.
LCLS-II For LCLS-II Cryomodule Testing at JLab
Preliminary Review of LERF as Cryomodule Testing Facility for LCLS-II
2K Cold Box FDR Introduction
Process Simulation for the LCLS-II Cryogenic Systems
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
Cryoplant Installation Overview
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
Chris Adolphsen Sergei Nagaitsev
ATF2 Magnet Power Supplies
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
LLRF Controls Outline Requirements External Interfaces Schedule Design
BriXS – MariX WG 8,9 LASA December 13, 2017.
2K CB FDR Overview:  Agenda, Charge, Review Process
LCLS Linac Technical Design Review Charge
LCLS Injector: Introduction D. H
JEFFERSON LAB LCLSII CRYOPLANT INSTALLATION PACKAGE DIRECTOR’S PROGRESS REVIEW Welcome and Introduction Stuart Henderson June 1, 2017.
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
E. Daly / K. Jordan / C. Hovater / T. Hiatt 03-AUG-2017
SuperB RF and Other Components
2K Cold Box Cost, Schedule & FDR Summary
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
LERF Readiness Review Kevin Jordan
Scope, Requirements Deliverables & Schedule
RF Pulse Shaping.
Baseline Change Request
LERF Readiness Review: Charge
LCLS Cryomodule Testing in the LERF- OSP
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
CryoPlant Commissioning
CTF Users’ Perspective
LCLS-II Cryoplant Controls Workshop.
LCLS Undulator System Production Management
LCLS Injector Configuration
LCLS Injector System Overview D. H
Linac Coherent Light Source (LCLS)
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
Cryomodule transportation strategies
LERF CM Supplemental Testing & Change Management
2015 January February March April May June July August September
LCLS-II Operations in LERF
Facility for Research Instrumentation and Accelerator Development
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

LERF Cryomodule Testing Facility – Accelerator Systems Deliverable Jose Chan August 3-4, 2017

Request 1.3 GHz SSAs L-Band Isolators LLRF control racks Requested 16 units SLAC has over 120 in storage L-Band Isolators SLAC just placed production order with Ferrite Delivery starts in January 2018 LLRF control racks Requested 4 units Order racks in August, load racks at SLAC in January LCLS-II LERF Test Facility Review

Request from Cryogenic Systems All requested items (SSAs, Isolators & LLRF Racks) will be available to LERF testing facility by March 2018 All requested items will have to be returned for LCLS II installation Will need to BCR resources, packing and shipping and linking activities in P6 LCLS-II LERF Test Facility Review