P10452 Dresser Rand Compressor Installation and Utilization

Slides:



Advertisements
Similar presentations
Due Diligence of Technology Mission Critical: The Rocky Research scientist, engineers & mfg specialist are dedicated to assist potential investors in.
Advertisements

Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
EDGE™ Concept Level Project Plan P08452 – Fault Detection and Diagnosis in Rotating Equipment for the Energy Industry Garry Studley (Mechanical Engineering)
ENSE3 : Energy, Water & Environmental Sciences. ENSE3 : a prestigious French «Grande Ecole» (engineering) 300 graduates per year  merging in 2008 between.
6/10/2015SYSTEMS LEVEL DESIGN REVIEW 1 HEALTH-MONITORING OF A RECIPROCATING COMPRESSOR MSD1 – P12453 SYSTEMS LEVEL DESIGN REVIEW.
P10054 Enhancements to Cigarette Smoking Machine Senior Design Fall/Winter 2009 Team Lead Frank Forkl (ME) Slide 1 of 8 P10054.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
INFORMATION TECHNOLOGY MODULES IN THE DEPARTMENT OF ACCOUNTANCY IN TEI OF LARISSA Dr Ilias Santouridis Assistant Professor of Applied Information Technology.
INDUSTRIAL & SYSTEMS ENGINEERING
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
Compressor ReVamp and Fabrication PO9452. Update Revised specs Continued concept generation Researched range of educational applications for compressor.
R I T Team Members: Dan Lester → Team Lead Chris Feuerstein → Lead Engineer/Electrical Lead Mike Schwec → Electrical Support Jacob Hillmon → Electrical.
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
Components, Symbols, and Circuitry of Air-Conditioning Wiring Diagrams
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Rochester Institute of Technology Kate Gleason College of Engineering Presents …
Careers in Canadian Fluid Power. What is the CFPA? Canadian Fluid Power Association Manufacturersdistributors related businessesorganizations Manufacturers,
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Fundamentals of Engineering Exam NMSU CoE Fall 2010 NMSU CoE Fall 2010.
Shanghai Jiao Tong University 1 Course Introduction ME 250: Design & Manufacturing I School of Mechanical Engineering.
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
Health Program: Implementation CHSC 433 Module 4/Chapter 7 L. Michele Issel, PhD UIC School of Public Health.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
P13458 RIT Senior Design Team March 22, AM-11AM Dresser- Rand, Painted Post Air Bearing System & Layout.
PROJECT STATEMENT Dresser-Rand will be donating a single stage ESH reciprocating compressor for RIT use. The project objective is to safely install the.
Handled by ** Mr: K.PADMANABAN.. LECTURER\AERO. History 57:020 Fluid Mechanics 2 Faces of Fluid Mechanics Archimedes (C BC) Newton ( )
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
By Anbarasan.T CE1210. The purpose of this laboratory is to reinforce and enhance your understanding of the fundamentals of Strength of Materials. The.
Fantastic Fridges alias Refrigeration and Air Conditioning your name your company.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
1 SPIRIT Silicon Prairie Initiative on Robotics in Information Technology Engineering Disciplines.
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
Dylan HruskaKevin Liu PresidentTechnical Director.
Your Project Project: Your Team – MEEG4131 Fall 2015 Senior Capstone Advisor: Your Advisor Team Members: Names.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 8: Foundations of heating, cooling and ventilating systems.
SENSOR APPLICATION LAB Dr. Ahmadi ECE 1020 George Washington University.
EDGE™ Concept Level Project Plan P08452 – Fault Detection and Diagnosis in Rotating Equipment for the Energy Industry Garry Studley (Mechanical Engineering)
ECE 396 – Senior Design I Fall 2013 Semester Lecture 2 Getting Started.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Mechanical Engineering at RIT - Is it the right choice for you? Dr. Ed Hensel, Dept. Head.
P08452 Reciprocating Compressor Installation, Revamp, and Interface Installation Designed and prepared the installation guidelines and test cell setup.
Sustainable Technologies for the Global Market Place - Turbomachinery/Reciprocating Products - Energy Solutions.
Mechanical Engineers immigrate to Australia and Canada The Mechanical engineers have a high demand in countries like Australia and Canada. The qualified.
P10452 Dresser Rand Compressor Installation and Utilization Joe Bykowicz (ME) Dresser Rand Model.
Advanced Post Graduate Program in Piping Design & Engineering with PDMS & CAESAR-II
Standing Offers Discipline
Turbomachinery Flow Visualization P08453
Software and Systems Integration
Garry Studley (Mechanical Engineering)
IT Project Management Version IT Industry Apprenticeship System
Introduction to System Analysis and Design
MANUFACTURING CAREER CLUSTER
E-MAP CHAMBER PROJECT Engineering Math Advancement Program SUMMER 2006
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
MECHANICAL ENGINEERING The “Gears” of FUTURE. A simple machine is a device that simply transforms the direction or magnitude of a force A machine is a.
Remember careers in agricultural engineering
MECE 109: Computer Tools A First Year Course in Newtonian Mechanics, Experimentation, and Computer Tools Created by the Faculty of the Mechanical Engineering.
Fall 2015 Semester Lecture 2 Getting Started
P17453: Dresser-Rand Poppet Valve Test Bench
By Jeff Burklo, Director
Flexible Manufacturing Systems
QE 107: Workshop Technology Section 5: Manufacturing Organisation
Fundamentals of Human Computer Interaction (HCI)
Architectural Engineering, The Pennsylvania State University
Project Readiness Review P10029 – Air Muscle Artificial Limb
Research Issues & Projects Sadiq M. Sait
Turbomachinery Flow Visualization
P15661 Reciprocating Friction Tester Base Subsystem Problem Definition Review Matt.
MSD I Review February 22, 2008 (9:00 AM) Room
Presentation transcript:

P10452 Dresser Rand Compressor Installation and Utilization Dresser Rand Model Joe Bykowicz (ME) 10452- Compressor Installation and Utilization

10452- Compressor Installation and Utilization Who? Incoming Senior Design students searching for a project, that are interested in Piston Machinery Data Acquisition Systems Design of Experiments Cooling and Ventilation Systems Taking an active role in labs future students would be enrolled in 10452- Compressor Installation and Utilization

10452- Compressor Installation and Utilization What? The 10452 project is the development of one or more Mechanical Engineering Thermal Fluids, Vibrations, or other labs while at the same time overseeing the installation of a Reciprocating Compressor and providing a platform for future teams to develop Health Monitoring Technology. Structural Analysis – 09452 Team Model 10452- Compressor Installation and Utilization

10452- Compressor Installation and Utilization Where and When? The compressor will be installed in the test cell inside the KGCOE Machine Shop. The Compressor should available for delivery from Dresser-Rand for the winter quarter with the project finishing in the spring. Test Cell Layout – 09452 team model 10452- Compressor Installation and Utilization

10452- Compressor Installation and Utilization Why? There are two main purposes to this project To enhance the laboratory experience of engineering students at RIT. To provide a platform for future Senior Design Teams to develop Compressor Health Monitoring Technology for Dresser Rand. Health Monitoring Technology aims provide users with information regarding the state of various components within the compressor system. 10452- Compressor Installation and Utilization

10452- Compressor Installation and Utilization How? With a staff of 1 Electrical or Computer Engineer 1 Industrial Engineer 3 Mechanical Engineers The team will be expected to draw upon both their experiences as students participating in lab classes and their own expertise within their discipline to be a contributing member of the project 10452- Compressor Installation and Utilization