Water Directors’ Meeting Common Implementation Strategy

Slides:



Advertisements
Similar presentations
1 Update on progress in SOE-drafting group. 2 Water Directors Steering of implementation process Chair: Presidency, Co-chair: Commission Strategic Co-ordination.
Advertisements

European Commission, DG Environment Unit B.1: Water, the Marine and Soil TAIEX Seminar « Management of Water Resources: River Basin Management in the Baltic.
Component 5.2 Harald Marent, Veronika Koller-Kreimel, Austrian Ministry for Agriculture, Forestry, Environment and Water Management Edith Hödl-Kreuzbauer,
European Commission, DG Environment Unit B.1: Water, the Marine and Soil Joachim D’Eugenio Slide 1 The Common Implementation Strategy (CIS) for the Water.
EU Update/CIS England WFD Stakeholder Forum 4 April 2008.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
Pilot River Basin Network: Environment Directorate
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
IC network selection process
New Work Programme and mandates 2005/2006
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD CIS SCG meeting of 11 March 2009.
SW/MW guidance Milestones
Philippe Quevauviller, Johannes Grath
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
CIS General progress report WD meeting 16 June 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European Commission.
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Strategic Co-ordination group “Integrated River Basin Management”
CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Meeting of Water Directors WFD Common Implementation Strategy
Johannes Grath, Balazs Horvath
Update on progress since last WG meeting (13-14 June 2002)
EU Marine Strategy DG Environment B.1.
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
Wetlands and the Water Framework Directive
on a protocol for Intercalibration of Surface Water
Meeting of Water Directors Eutrophication Guidance
New mandates for Working Groups A, C and D including GIS
Meeting of Water Directors Future Work Programme of the CIS
Project 2.7 Guidance on Monitoring
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD WG Reporting - 31 March 2009.
The Common Implementation Strategy – an overview
Research as a new activity of the CIS WG 2B
Strategic Co-ordination Group
WG 2.B Integrated River Basin Management
DG Environment, Unit D.2 Marine Environment and Water Industry
Water Directors’ Meeting Working Group D (Reporting) activities
Water Framework Directive 2000/60/EC
Work Programme of the CIS
Water Directors meeting Mondorf-les-bains, June 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT 2013 – 2015 Tasks and Deliverables
Integrated Testing in Pilot River Basins
WG 2.3 REFCOND Progress report for the SCG meeting 30 Sep-1 Oct 2002
Part I.
CIS work programme Supporting the implementation of the first river basin management plans Water Directors' Meeting 30 November and 1 December.
Common Implementation Strategy for the Water Framework Directive
Organisation Water Directors Strategic Co-ordination Group
Agenda item 2.1 – Overall Progress Report
WG C-1 activity Berlin – 3 May 2007
EIONET and EUROWATERNET Common Implementation Strategy
Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Work Programme : Strengthening EU Water Policy through the 2nd River.
Concept paper on the assessment of WFD River Basin Management Plans
Activity on Eutrophication
Common Implementation Strategy for the
EU Water Framework Directive
Planning to develop the CIS Work Programme
Working Group C & CMA ( ) Tasks / Deliverables
EU Water Framework Directive
Guidance document on the identification of water bodies
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Brussels – 20 April 2007 European Commission - DG Environment
SCG May 2005 CIRCA review.
European Marine Monitoring and Assessment
WG A Ecological Status Progress report October 2010 – May 2011
History EU+Norway Water Directors meeting in Paris Oct 2000 Member States and the European Commission agreed in Paris to developed a Common Strategy.
Marine Strategy Framework Directive Strategic discussion on the future role of WG GES WG GES, 5-6 March 2013 European Commission, DG Environment, Marine.
Presentation transcript:

Water Directors’ Meeting Common Implementation Strategy 21/22 November 2002 Common Implementation Strategy 2003/2004 Agenda item 6

Process June 2002: WD agreed in Valencia to review CIS and to prepare the appropriate follow-up for 2003 and 2004 Sept. 2002: presentation of WG proposals for future work and orientation debate on SCG Oct. 2002 setting up of drafting group and first draft circulated 7/8 Nov 2002: discussion of first draft on SCG 21/22 Nov 2002: second draft presented and key elements for new work programme presented for discussion

Content Progress report Lessons learnt Reinforcing the strategy Revised structure and organisation Working areas 2003/2004 Transitional provisions Links to other policy areas (in particular marine strategy)

Steps 1) Discussion and agreement on key elements: organisation/structure working areas 2) Setting up of new structure immediately. 3) Elaboration of details by March 2003: mandates deliverables timetable

Key elements Organisation, i.e. which new WGs working structure and drafting groups priority working areas transitional provisions

Key working areas Pilot river testing (2003/2004) Intercalibration (2003-2006) New issues for guidance (see table) Maintaining network (ongoing) Manual for Integrated RBM (2004/2005)

Proposed priority issues (1)

Proposed priority issues (2)

Working Group 2.A “Ecological Status” Core activity: intercalibration Other activities: Initiatives on harmonisation of typology Guidance on classification Guidance on assessment criteria for eutrophication Number of drafting groups: 2-3

“Integrated River Basin Management” Working Group 2.B “Integrated River Basin Management” Core activity: pilot river testing and economics Other activities: Guidance on wetlands Guidance on preparation of river basin management plans including programme of measures Guidance on flood protection (best practices) Number of drafting groups: 3-4

New Working Groups Working Group on “Ecological Status” (Cluster WG 2A) Working Group on “Integrated River Basin Management” (Cluster WG 2B) Working Group on “Groundwater” (WG 2C) (after last meeting of EAF Groundwater) EAF Reporting (Cluster WG 2D)

Attribution of existing WGs Strategic Co-ordination group Water Directors Steering of implementation process Chair: Presidency, Co-chair: Commission Expert Advisory Forum 1) Priority Substances 2) Groundwater Chair: Commission Strategic Co-ordination group Co-ordination of work programme Chair: Commission Cluster WG 2.A Cluster WG 2.B Integrated RBM Groundwater WG 2.5 IC Ecological Status WG 2.4 Coast WG 2.3 Refcond WG 2.7 Monit (sw) WG 2.8 GW WG 2.1 Impress WG 2.6 WATECO WG 2.2 HMWB Reporting WG 2.9 Proclan WG 3.1 GIS 4.1 PilotRB Stakeholders, NGO’s, Researchers, Experts, etc.

Strategic Co-ordination group “Integrated River Basin Management” New organisation Water Directors Steering of implementation process Chair: Presidency, Co-chair: Commission Expert Advisory Forum 1) Priority Substances 2) Groundwater (mid-2003) Chair: Commission Art. 21 Committee Strategic Co-ordination group Co-ordination of work programme Chair: Commission Working Group 2.A “Ecological Status” Lead: D Co-lead: C’ion JRC Working Group 2.B “Integrated River Basin Management” Lead: F Co-lead: SP Working Group 2.C “Groundwater” (after end of EAF GW) Lead: ??? Co-lead: A Working Group 2.D “EAF Reporting” Lead: Commission Stakeholders, NGO’s, Researchers, Experts, etc.

Drafting Groups Recognise need for new drafting groups elaborate criteria for setting up and management of drafting groups mandate the SCG to monitor drafting groups

Transitional provisions Until May 2003, the following mandates are given: Establish new cluster WGs drafting groups for wetlands and classification start asap WG 2.9 to finalise planning process final meeting of WG 2.5 and 2.6 workshops of WG 2.4 on Euro-types and PRB “kick-off” workshop