Temperature distribution Vertical displacement

Slides:



Advertisements
Similar presentations
Professor Richard S. MullerMichael A. Helmbrecht MEMS for Adaptive Optics Michael A. Helmbrecht Professor R. S. Muller.
Advertisements

Behaviour of MicroMega chambers in magnetic field: analysis of H2 June data Outline: (0) Introduction (1) Data set used and noise filtering (2)Cluster.
October 21, 2005 Internal LCLS Undulator Alignment and Motion Review Georg Gassner, SLAC / MET 1 HLS Monitoring System Georg.
1 Simulations of Tuneshifts for Electron Beams M. Venturini (LBNL) Jan 26, 2009.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Beam based calibration for beam position monitor 15-SEP-2015 IBIC2015 Melbourne M. Tejima, KEK TUBLA01.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
1 pH observed with Honeywell pH electrodes Current Plan for Calibration and Cleaning Gel replacement Checking with Buffers pH: SATURN-03; SATURN-04.
Hyperbolas. Quick Review Quick Review Solutions.
Hyperbolas 9.3. Definition of a Hyperbola A hyperbola is the set of all points (x, y) in a plane, the difference of whose distances from two distinct.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
ERHIC: an Efficient Multi-Pass ERL based on FFAG Return Arcs June 9, 2015Stephen Brooks, ERL On behalf of the eRHIC design team.
Area Measurements.
Area Measurements.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
6-D dynamics in an isochronous FFAG lattice e-model Main topic : Tracking code development : 3-D simulation of the field in an isochronous FFAG optics.
Hyperbolas. No Solution since it can never equal zero.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ERHIC Low-Energy (FFAG) Ring Progress Report 2 November 19, 2013Stephen Brooks, eRHIC FFAG meeting1.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
DMS steering with BPM scale error - Trial of a New Optics - Kiyoshi Kubo
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
By: Eric Seabron. B-Field Sensors: Used for magnetic field mapping. Tube Gases: No leaks, 93% Argon/ 7% CO2 at 3 bars. MDC Temp. Sensors: Accounts for.
ST7 Interferometer LIGO-G Z1 The ST7 Interferometer Andreas Kuhnert Robert Spero Jet Propulsion Laboratory California Institute of Technology.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
HALL EFFECT TRANSDUCERS As already explained in- Art page 562, when a conductor is kept perpendicular to the magnetic field and a direct current.
Accuracy of the orbit measurement by KEKB BPM system for the study of ILC damping ring H. Fukuma (KEK) Requirement for the accuracy of BPM data.
News on FTK rack infrastructure A. Lanza – INFN Pavia FTK Italy meeting –
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
The reading is 7.38 mm. The reading is 7.72 mm.
LHC Collimation Working Group Monday, 21 March 2016 Analysis of collimator BPMs in the 2015 run A.Valloni, G. Valentino with input from R. Bruce, A. Mereghetti,
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
eRHIC FFAG Lattice Design
Vectors and Motion in Two Dimensions
Preparing the SPS complex alignment for future LHC runs
Tracking System at CERN 06 and 07 test beams
Date of download: 12/22/2017 Copyright © ASME. All rights reserved.
MDC Data Check Wu Linghui
Irradiation test of Pressure Transducers for the LHC machine
LEIR & ITE BPMs COMMISSIONING STEPS.
Compact and Low Consumption Magnet Design The DESY Experience
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
BASIC DISTANCE MEASUREMENT
Lock fixed scale vernier scale Vernier Caliper jaws.
Bubble Chamber – Beam Requirements
Startup program, 1 Machine setup (i.e. R:\Controls\matlab\acceleratorcontrol\docs\SRSetupUsingMatlab_ALS.doc) Bergoz BPM/orbit checks: monbpms, correct.
PS2 Injection/Extraction Layout
Beam-Based Alignment Results
مديريت موثر جلسات Running a Meeting that Works
T2K Run8 MUMON Summary.
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Fast Orbit Feedback at the SLS
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
I. Earth’s Place in Space
Unit 9. Day 3..
The Gas Laws.
Field Geophysics Instructors Tom Herring, Brad Hager Web: 01/20/05
Presentation transcript:

Temperature distribution Vertical displacement (1) (2) Boundary condition Temperature distribution Vertical displacement Magnetic center vertical offset ~0.3mm. (3)

Causes for vertical orbit drift Source Time scale Tunnel drift Magnet alignment Optics change Magnet & structure thermo- expansion. Power supplies drifts / electronic components change Run-to-run (3-4 months) ~1-2mm 1-2mm ~5mm 1mm ~1mm Day-to-day 1day - 0.2-0.3mm Fill-to-fill 1-4 hrs ~0.1mm How to fix Often survey in drifting areas Modeling of the magnets displacement (Clean leaving) Optics modeling Better tunnel temperature control, one save set and constant current operation. Regular PS calibrations. PS calibration after component change.